OKOleg Ivanovich Kazanin

Oleg Ivanovich Kazanin

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Oleg Ivanovich Kazanin has a total of 15 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Promising technology trends in underground coal mining in Russia

    by O. I. Kazanin

    In the article, based on the analysis of the current state and global trends in the development of mining technologies, the main directions of technological advancement in underground coal mining in Russia are considered. It is shown that longwall mining systems providing the best technical and economic indicators of production safety and efficiency have the greatest prospects. The methods of longwall panel development, their main parameters and the scope of application are analyzed. The features of the basic technologies involved in coal mining (longwalling, heading, teardown) in Russia and in the USA, as well as the possibilities of their modernization in the short term are considered. A significant reserve of productivity growth of longwalling and heading lies in the increased efficiency of using the potential of modern equipment. The analysis of the approaches to mining safety is carried out. The necessity of monitoring the risks of various accidents during the entire life cycle of a mine is emphasized. It is shown that in the complicated geological conditions in coal mining, automation and robotization, as well as transition to unmanned technologies become increasingly in demand. The analysis of the production automation in mines in the USA and in China is carried out, and the potential of this approach in coal mines of Russia is evaluated. The scientific supervision of mining operations and the maintenance of personnel training and professional development are highlighted as the necessary conditions of mining safety and efficiency.


  • Open Access

    Deformation Control Technology of Gob-Side Entry Retaining with Large Volume CFST Roadway Side Support in Top-Coal Caving Longwall and Stability Analysis: A Case Study

    by Zi-Lu Liu, Zhan-Guo Ma, Oleg Ivanovich Kazanin, Peng Gong, Ye Li, Xiao-Yan Ni

    Considering the factors affecting the surrounding rock stability of gob-side entry retaining, the applicability of a large-diameter, concrete-filled steel tube roadside support body in a top-coal caving fully mechanized face is discussed, and a new approach to gob-side entry retaining is proposed in this study. The mechanical model of the surrounding rock structure of gob-side entry retaining in a top-coal caving fully mechanized face was established, the critical state of column–roof contact shear slip instability was clarified through Prandtl foundation failure theory, and the deformation mechanism of the surrounding rock of the retained roadway was analyzed through numerical simulation. The results indicated that the range of the tensile stress zone and extreme tensile stress of the roof between columns are closely related to the spacing of columns, which is the key factor influencing the deformation of the retained roadway. In addition, besides uncontrollable factors, the stability of the contact interface between the roof and columns is directly related to the area of the contact interface between the concrete-filled steel tubes and the roof, and the size of the critical contact area is directly related to the properties of top-coal mass. Finally, a field test was carried out in 91–101 working panels in the Wang-Zhuang Coal Mine; the maximum convergence of the roof and floor was 510 mm, and the area of the retained roadway section reached 12.9 m2, which is within a reasonable range.


  • Open Access

    Ensuring the excavation workings stability when developing excavation sites of flat-lying coal seams by three workings

    by Oleg I. Kazanin, Andrei A. Ilinets

    On the basis of analysis of mining plans and field studies at mines of JSC SUEK-Kuzbass, it is shown that in conditions of increasing the size of excavation columns during the development of flat-lying coal seams the stress-strain state of the rock mass along the workings length changes significantly. The necessity of predicting the stress-strain state at the design stage of the workings timbering standards, as well as subsequent monitoring of the workings roof state and its changes in the mining operations using video endoscopes, is noted. The results of numerical studies of the stress-strain state of the rock mass during the development of excavation sites by three workings for various combinations of width of the pillars between the workings for mining-geological and mining-technical conditions of the “Taldinskaya-Zapadnaya-2” mine are provided. The stresses in the vicinity of the three workings are compared with the values obtained during the development of the excavation sites by double drift. A set of recommendations on the choice of the location of the workings, the width of pillars, timbering standards that ensure the stable condition of the workings throughout the entire service life at the minimal losses of coal in the pillars is presented.


  • Open Access

    Improving the efficiency of the technology and organization of the longwall face move during the intensive flat-lying coal seams mining at the Kuzbass mines

    by Аndrey A. Meshkov, Oleg I. Kazanin, Andrey A. Sidorenko

    The reasons for the lag of the indicators of the leading Russian coal mines engaged in the longwall mining of the flat-lying coal seams from similar foreign mines are considered. The analysis of the efficiency of the longwall face move operations at the JSC SUEK-Kuzbass mines was carried out. A significant excess of the planned deadlines for the longwall face move during the thick flat-lying seams mining, the reasons for the low efficiency of disassembling operations and the main directions for improving the technology of disassembling operations are revealed. The directions of ensuring the operational condition of the recovery room formed by the longwall face are considered. The recommended scheme of converged coal seams mining and a three-dimensional model of a rock mass to justify its parameters are presented. Numerical studies using the finite element method are performed. The results of modeling the stress-strain state of a rock mass in the vicinity of a recovery room formed under conditions of increased stresses from the boundary part of a previously mined overlying seam are shown. The main factors determining the possibility of ensuring the operational condition of the recovery rooms are established. It is shown that it is necessary to take into account the influence of the increased stresses zone when choosing timbering standards and organizing disassembling operations at a interbed thickness of 60 m or less. A sufficient distance from the gob of above- or undermined seams was determined to ensure the operational condition of the recovery room of 50 m, for the set-up room – 30 m. Recommendations are given for improving technology and organization of the longwall face move operations at the mines applied longwall mining of flat-lying coal seams with the formation of a recovery room by the longwall face.


  • Open Access

    Intensive underground mining technologies: Challenges and prospects for the coal mines in Russia

    by О. И. Казанин, Andrey Sidorenko, Carsten Drebenstedt

    The article presents the key features of underground coal mining that influence the development of mining technologies and mining equipment design. It covers the most important challenges faced by underground coal mining companies and discusses growth areas in mining technology that are aligned with the paradigm of sustainable development. Using the example of underground coal mining operations, it illustrates such concepts as the intelligent mine and the invisible mine, discussing how they can be brought to life. It also shows how underground coal mining companies can improve their productivity, OSH management, and environmental indicators to make their products competitive. As mining operations are becoming more intensive and the average depth of mining is growing, which is accompanied by an increase in both methane emissions and risks associated with rock mechanics processes, it is becoming vital to accurately predict how the rock mass will behave and, by applying stress-strain analysis, to identify hazardous zones and their boundaries. The article discusses several mine layouts and how their parameters are adjusted to ensure intensive mining. Among the factors that hinder growth in coal production, it highlights the underutilisation of high-performance mining equipment. It also contains a list of key principles aimed at fostering production growth in the underground coal mining sector and improving its competitiveness.


  • Open Access

    Reproduction of the longwall panels: modern requirements for the technology and organization of the development operations at coal mines

    by О. И. Казанин, Andrey Sidorenko, С. А. Сидоренко, А.а. Meshkov

    The authors point at the criticality of timely reproduction of longwall panels in coal mines toward sustainable and high-rate coal mining based on the utilization potential of modern longwall equipment. A case-study of SUEK-Kuzbass mines shows that there is a need to change approaches to improvement of economic efficiency and competitiveness of coal mining and to shift from the common practice of production cost reduction to productivity enhancement through implementation of high-performance equipment capabilities. Efficiency of road heading in mines of SUEK-Kuzbass is analyzed, and the main causes of long downtime in operation of modern high-performance continuous miners (CM) or continuous bolter miners (CBM) are identified. Recommendations have been developed for improved planning of preparatory works in mines and for introduction of significant action time margin to eliminate downtime when actual drivage performance lags behind the planning data. The action time structure of modern CBM is presented, and recommendations are given on CBM efficiency evaluation as actual action time in cutting road face rocks. The application areas of various modern CBM types are justified. Recommendations are proposed for changing the parameters of longwall panels and to change to multi-entry longwall panels in order to increase efficiency of preparatory works and actual coal production. The authors describe expediency of widespread use of shuttle cars to improve efficiency of haulage of rocks and materials. The organizational and technological principles of the efficiency increase in preparatory works in coal mines are substantiated.


  • Open Access

    Decrease in coal losses during mining of contiguous seams in the near-bottom part at Vorkuta deposit

    by О. И. Казанин, Valeriy Yaroshenko, В. В. Ярошенко

    The problem of formation of extended zones with high rock pressure (HRP) from safety pillars at the boundaries of extraction pillars formed due to the mine layout of complex geometry is considered at the example of JSC Vorkutaugol mines. A detailed analysis of the remaining reserves of the near-bottom part of the deposit was carried out to estimate losses and the impact of HRP zones from the Chetvertyi protective seam to mining operations on the Troinoi upper seam along with the possibilities for the reduction of sizes of HRP zones at the account of expanding the underworked space. Due to research on the near-bottom part of the Vorkuta deposit, within the framework of the accepted layout, a zone at the Komsomolskaya mine and two zones at the Zapolyarnaya-2 mine were singled out, at which losses at the boundaries of the extraction pillars amount up to 13-22 % of the total resources of the mine field. The high volume of losses in these pillars indicates the relevance of research on the priority extraction impact of protective seams on the efficiency and safety of mining operations in the working area of underworked and HRP zones. Based on the analysis of foreign and Russian experience in the pillar cleaning-up at the boundaries of working areas and the methodical guidelines and instructions, a technological scheme was developed that allows increasing the coal mining recovery factor in the near-bottom part of the Vorkuta deposit from 0.75 to 0.9 without fundamental changing of the ventilation and transport networks and also without purchasing any additional mining equipment. The conducted economic calculations confirmed the effectiveness of implementing the new technological scheme for cleaning-up reserves at the boundaries of extraction districts. The economic effect is from 0.079 to1.381 billion rubles of additional profit from coaxial extraction pillars, depending on the mining and geological conditions and the size of the pillars.


  • Training a modern mining engineer: Objectives of universities and professional communities

    by O. I. Kazanin, I. B. Sergeev

    In focus are the key issues of qualified and competitive mining engineer training in Russian universities. The role of the mining industry in the sustainable development strategy implementation is highlighted, and the present-day challenges in the mining technologies and mine personnel training are structured. After characterizing the main systems of mining education in the developed countries, the authors point at the global orientation of training, possibility to choose individual educational trajectories as well as at the importance of the international acknowledgment of the documents of education and qualification. The top-priority goals on modernization of research activities at mining universities are indentified toward improvement of quality of research findings, extension of cooperation with mining companies and introduction of the results in the training processes. It is shown that continuous professional advance of mining engineers is the basic term of their competitive power. The role of the professional mining societies in the formation of educational framework, in stimulation of continuous professional development of engineers, accreditation of educational programs and in certification of mining engineers is emphasized. The article gives information on the international professional associations of the Society for Mining, Metallurgy and Exploration (Denver, USA) and the Institute of Materials, Minerals and Mining (London, GB), on their activities with a view to developing mining education and on the cooperation with the National Association of Mining Engineers of Russia. The positive experience of the international cooperation between mining universities is illustrated.