Ugur Satic
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Ugur Satic has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Christopher Kirkbride
Department of Management Science Lancaster University Management School United Kingdom
3 shared publications - Peter Jacko
Department of Management Science, Lancaster University, UK
3 shared publications - İrEm Nur Nergiz
Abdullah Gul Universitesi
1 shared publication - Rukiye Kaya
ABDULLAH GUL UNIVERSITY, FACULTY OF ENGINEERING
1 shared publication - Tutku Tutkun
Abdullah Gul Universitesi
1 shared publication
Latest Publications
- Open Access
- 31 December 2024
- Published by Bitlis Eren Universitesi Fen Bilimleri Dergisi in Bitlis Eren Üniversitesi Fen Bilimleri Dergisi
- Vol. 13 (4) , 1260-1270
Optimization of Warehouse Location and Inventory Management for an Industrial Textile Manufacturer Company in Türkiye
In this study, we consider the demand forecasting, facility location, and inventory management problems of an industrial textile manufacturer company in Türkiye. First, we begin with the demand forecasting problem for thirty-two different products and employ ABC analysis to categorise the products. Then we test multiple forecasting methods and find out that Exponential Smoothing and Croston's TSB methods perform better in our categories. Using the demand forecast results in the facility location problem, we search for a location in Europe for a warehouse. For the facility location problem, we use a mixed-integer nonlinear mathematical model to minimise the transportation cost, and warehouse rental cost. We solve the model by using GAMS Solver. Then, we handle the inventory management problem and determine the quantity of the products that are sent from the factory and the warehouse to the customer. We propose a genetic algorithm approach that generates reorder quantities and reorder points for both the factory and the warehouse to minimise the total logistics costs, including holding, ordering and stockout costs. We use simulation models to calculate the logistics costs then we use these costs as fitness values to choose the best reorder quantities and reorder points. The proposed approach offers improvement in demand forecasting, inventory management, and facility location problems and brings up a 26% reduction in total logistic costs.
- 31 December 2024
- Published by Bitlis Eren Universitesi Fen Bilimleri Dergisi in Bitlis Eren Üniversitesi Fen Bilimleri Dergisi
- Vol. 13 (4) , 1260-1270
Open AccessOptimization of Warehouse Location and Inventory Management for an Industrial Textile Manufacturer Company in Türkiye
In this study, we consider the demand forecasting, facility location, and inventory management problems of an industrial textile manufacturer company in Türkiye. First, we begin with the demand forecasting problem for thirty-two different products and employ ABC analysis to categorise the products. Then we test multiple forecasting methods and find out that Exponential Smoothing and Croston's TSB methods perform better in our categories. Using the demand forecast results in the facility location problem, we search for a location in Europe for a warehouse. For the facility location problem, we use a mixed-integer nonlinear mathematical model to minimise the transportation cost, and warehouse rental cost. We solve the model by using GAMS Solver. Then, we handle the inventory management problem and determine the quantity of the products that are sent from the factory and the warehouse to the customer. We propose a genetic algorithm approach that generates reorder quantities and reorder points for both the factory and the warehouse to minimise the total logistics costs, including holding, ordering and stockout costs. We use simulation models to calculate the logistics costs then we use these costs as fitness values to choose the best reorder quantities and reorder points. The proposed approach offers improvement in demand forecasting, inventory management, and facility location problems and brings up a 26% reduction in total logistic costs.
- Open Access
- 10 November 2023
- Published by Elsevier in European Journal of Operational Research
- Vol. 315 (2) , 454-469
A simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem
- 10 November 2023
- Published by Elsevier in European Journal of Operational Research
- Vol. 315 (2) , 454-469
Open AccessA simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem
- 26 December 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 60 (4) , 1411-1423
Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem
In this study, we consider the dynamic and stochastic resource-constrained multi-project scheduling problem where projects generate rewards at their completion, completions later than a due date cause tardiness costs, task duration is uncertain, and new projects arrive randomly during the ongoing project execution both of which disturb the existing project scheduling plan. We model this problem as a discrete-time Markov decision process and explore the performance and computational limitations of solving the problem by dynamic programming. We run and compare five different solution approaches, which are: a dynamic programming algorithm to determine a policy that maximises the time-average profit, a genetic algorithm and an optimal reactive baseline algorithm, both generate a schedule to maximise the total profit of ongoing projects, a rule-based algorithm which prioritises processing of tasks with the highest processing durations, and a worst decision algorithm to seek a non-idling policy that minimises the time-average profit. The performance of the optimal reactive baseline algorithm is the closest to the optimal policies of the dynamic programming algorithm, but its results are suboptimal, up to 37.6%. Alternative scheduling algorithms are close to optimal with low project arrival probability but quickly deteriorate their performance as the probability increases.
- 26 December 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 60 (4) , 1411-1423
Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem
In this study, we consider the dynamic and stochastic resource-constrained multi-project scheduling problem where projects generate rewards at their completion, completions later than a due date cause tardiness costs, task duration is uncertain, and new projects arrive randomly during the ongoing project execution both of which disturb the existing project scheduling plan. We model this problem as a discrete-time Markov decision process and explore the performance and computational limitations of solving the problem by dynamic programming. We run and compare five different solution approaches, which are: a dynamic programming algorithm to determine a policy that maximises the time-average profit, a genetic algorithm and an optimal reactive baseline algorithm, both generate a schedule to maximise the total profit of ongoing projects, a rule-based algorithm which prioritises processing of tasks with the highest processing durations, and a worst decision algorithm to seek a non-idling policy that minimises the time-average profit. The performance of the optimal reactive baseline algorithm is the closest to the optimal policies of the dynamic programming algorithm, but its results are suboptimal, up to 37.6%. Alternative scheduling algorithms are close to optimal with low project arrival probability but quickly deteriorate their performance as the probability increases.
- 8 November 2020
- Published by Springer Nature
- p. 100-114
Performance Evaluation of Scheduling Policies for the DRCMPSP
- 8 November 2020
- Published by Springer Nature
- p. 100-114
Performance Evaluation of Scheduling Policies for the DRCMPSP