KHKamyar Azimi Hosseini

Kamyar Azimi Hosseini

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Kamyar Azimi Hosseini has a total of 8 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Hedging Investments of Grid-Connected PV-BESS in Buildings Using Cryptocurrency Mining: A Case Study in Finland

    by Mehran Hajiaghapour-Moghimi, Ehsan Hajipour, Kamyar Azimi Hosseini, Mehdi Tavakkoli, Sajjad Fattaheian-Dehkordi, Mehdi Vakilian, Matti Lehtonen

    In recent decades, there has been a growing global focus on solar power as a renewable energy source (RES) to supply local energy demands and reduce greenhouse gas emissions. Rooftop solar photovoltaic (PV) system provides a small-scale utilization of solar energy on the roofs of apartment buildings. Investment in this system and its profitability depends on several factors, including geographic conditions, electricity price, and local load profiles. However, in Finland, the maritime and continental climates and electrically heated residential buildings present unique challenges to the investment and utilization of rooftop PV systems. Common solutions to incentivize the investment of grid-connected PV in apartments are battery energy storage systems (BESSs), demand side management (DSM), and power-to-x (P2X) approaches. Nevertheless, the value of these solutions is limited in Finland due to the seasonal variation of solar PV generation and customers’ energy consumption. This paper presents a novel and practical control and hedging mechanism to encourage investments in rooftop solar PV-BESS systems by investing in cryptocurrency mining devices (CMDs) as dispatchable and flexible loads, which facilitate the use of excess renewable energy for producing cryptocurrency, such as bitcoin (BTC). This mechanism can optimally switch the output of excessive renewable energy between exporting to the main grid and mining cryptocurrency. The proposed mechanism is studied using a dataset obtained from a residential apartment building in Helsinki, Finland, and its effectiveness is demonstrated through several practical scenarios. The results of a case study employed in this work demonstrate that the proposed hedging mechanism can provide sufficient encouragement for investors to invest in a PV system, with a return on investment equal to 57.7%. This mechanism also reduces the annual cost of residential apartments by 68.1%.


  • Open Access

    An approach to targeting cryptocurrency mining loads for energy efficiency enhancement

    by Mehran Hajiaghapour‐Moghimi, Kamyar Azimi Hosseini, Ehsan Hajipour, Mehdi Vakilian

    In recent years, the mining of cryptocurrencies such as Bitcoin has attracted much global attention due to the simplicity and high profitability of this business, especially in countries with low electricity rates. The process of cryptocurrency mining using cryptocurrency mining devices requires a significant amount of computing power. This industry, which is increasingly growing in energy and carbon emissions, can cause environmental concerns. Common ways to reduce this amount of energy consumption are to prohibit mining and charge these loads at a higher electricity rate; however, these solution methods are not feasible and applicable in many countries. This paper presents an energy efficiency program to persuade the customers to mine cryptocurrency using high‐efficient cryptocurrency mining devices (CMDs), including informative, regulation, and financial policy instruments. This energy efficiency approach suggests a standard, if implemented, would ban the application of inefficient CMDs, and would encourage the cryptocurrency miners to improve the profitability of their business with high‐efficient CMDs through a penalty‐reward strategy. The performance of this energy efficiency program is studied through an analysis of data gathered from different CMDs used in Iran. The effectiveness of this suggested program is proved through its sufficient incentives for miners using high‐efficient CMDs.


  • Open Access

    Advanced distribution transformer asset management embracing its relocation: A cost saving approach

    by Kamyar Azimi Hosseini, Mehran Hajiaghapour‐Moghimi, Ehsan Hajipour, Mehdi Vakilian

    Change in customers' consumption patterns due to the introduction of new electricity consuming technologies into human consumption practices has impacted the existing optimal loading profile of the grid facilities. Although some MV/LV distribution transformers (DTs) are operating under a light load profile, this does not guarantee that they are in a healthy condition, since necessary maintenance procedures are required. On the other hand, many unplanned overloading conditions occur on the other DTs and causes accelerated failures which contributes to very high operational costs. This paper presents the outcome of a study on how the planned DTs relocation can save asset managers against their huge DTs replacement costs developed due to the highly overloaded DTs failures in a utility, and how it will improve the overall reliability of the DTs. A mixed‐integer linear programming (MILP) solution is proposed to formulate the introduced economic relocation‐based asset management (AM) framework while minimizing total cost (TC) of the network. The results show that incorporating relocation techniques into the AM formulation ends in reduction of the distribution network TC and a decrease in asset failure rates if compared with application of traditional techniques.


  • A TOU-IBT Pricing Strategy to Manage the Cryptocurrency Micro-Miners

    by Mehran Hajiaghapour-Moghimi, Kamyar Azimi Hosseini, Ehsan Hajipour, Mehdi Vakilian

    Cryptocurrency mining device (CMD) is a plug-and-play device installed by any low-voltage customer to convert electrical energy to digital money. Recently, the significant increase in the price of digital currencies has persuaded residential customers in many countries to employ CMDs to obtain quick and easy profit. However, these rapidly evolving loads can cause a substantial increase in the coincident peak load of distribution networks. Therefore, it can threaten the safe and reliable operation of the network. A straightforward way to restrict the penetration rate of these home-based miners is to increase the electricity price such that this business becomes unprofitable; however, this solution affects the national regulations and is not practical in many countries. This paper proposes a practical electricity pricing strategy to manage the operation of cryptocurrency mining loads appropriately. This pricing strategy can change the miner’ threat to an opportunity to sell more electrical energy during the off-peak hours to these loads and to maximize the profit of the utility. The proposed strategy is studied using the load profile dataset obtained from the measurements of Tehran Electricity Distribution Company, and its effectiveness is demonstrated.


  • Open Access

    Distribution transformer relocation problem: an integer programming solution

    by Kamyar Azimi Hosseini, Mehran Hajiaghapour‐Moghimi, Ehsan Hajipour, Mehdi Vakilian

    The short‐term expansion planning of the private utilities, as well as the emerging technologies such as photovoltaic panels (PVs), plug‐in hybrid electric vehicles (PHEVs), cryptocurrency mining, and storage elements spread, make the long‐term load estimation of distribution transformers (DTs) noticeably imprecise. In response, the number of overload and underload transformers is growing in recent years. The utilities normally analyse the loading of their DTs annually to determine the DTs, which should be replaced. It is a common practice for utilities to relocate these DTs to reduce the investment needed to purchase new transformers. Therefore, the utility needs a systematic algorithm to determine the optimal schedule to relocate/replace the DTs with minimum required time and cost. This paper introduces a two‐stage procedure to obtain the optimal schedule to replace DTs. In the proposed algorithm, the maximum permitted number of work‐hours per day for field workers is considered, which converts the problem to a daily‐task based optimisation problem. Also, an useful life investigation of the in‐service DTs is considered in the relocation problem. A real case study in Qom province, Iran, has been studied to prove the effectiveness of the proposed algorithm.