Marat Bitimbayev
Research Subjects
Marat Bitimbayev has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
- Kanay Rysbekov
Department of Metallurgy and Mineral Processing, Non-Profit Joint Stock Company (NJSC) Kazakh National Research Technical University Named K.I. Satbayev, Almaty 050013, Kazakhstan
2 shared publications - Marzhan Nurpeisova
Satbayev Univ, Engn Sci, Alma Ata, Kazakhstan
2 shared publications - Arstanbek Raimbekovich Abdiev
Kyrgyz State Technical University named after I. Razzakov
1 shared publication - Ayan Toktarov
Satbaev Univ, Dept Min, 41 Sanlak St, Alma Ata 59979, Kazakhstan
1 shared publication Azamat Matayev
1 shared publication- Bolatkhan Khussan
Abylkas Saginov Karaganda Technical University
1 shared publication
Latest Publications
- 30 December 2022
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 16 (4) , 87-95
Substantiation and development of innovative container technology for rock mass lifting from deep open pits
Purpose. The research purpose is to substantiate the rational parameters of innovative container technology for transporting mine rocks in open pits with account of technological advantages. Methods. The winding machine normal operation was determined by calculation performed. The container metal structure was designed in the environment of the Compass-3D software complex. The structural elements were tested for normal operation using computer modeling methods in the APM WinMachine 9.7 program, which gives the possibility to obtain the strength calculation values. Findings. The results of modeling the stresses on the wall of the container and the frame, as well as the yield strength are presented. The test calculation confirms the technical feasibility for operating the dragline-based mine winding machines. The influence of the container capacity on the performance of the winding machine has been determined and the dependence of the economic efficiency of the container technology introduction at the open pit depth has been revealed. Originality. For the first time, on the basis of computer modeling, the parameters of stress distribution on the container wall have been substantiated when performing a strength calculation. It has been determined that the maximum stress in the container wall is 117.52 N/mm2; the principal stress value is 83.85 N/mm2. The safety factor for yield strength is 1.8. The maximum load acting on the structure is 957.5 kgf, which does not exceed the calculated value. Practical implications. The practical importance is to improve mining efficiency, reduce the cost of transporting rocks and ensure automatic container unloading. The use of replaceable containers in open pits can significantly change the formation principles of shovels and transport complexes, increase their performance and the efficiency of shovels in the main processes.
- 30 December 2022
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 16 (4) , 87-95
Substantiation and development of innovative container technology for rock mass lifting from deep open pits
Purpose. The research purpose is to substantiate the rational parameters of innovative container technology for transporting mine rocks in open pits with account of technological advantages. Methods. The winding machine normal operation was determined by calculation performed. The container metal structure was designed in the environment of the Compass-3D software complex. The structural elements were tested for normal operation using computer modeling methods in the APM WinMachine 9.7 program, which gives the possibility to obtain the strength calculation values. Findings. The results of modeling the stresses on the wall of the container and the frame, as well as the yield strength are presented. The test calculation confirms the technical feasibility for operating the dragline-based mine winding machines. The influence of the container capacity on the performance of the winding machine has been determined and the dependence of the economic efficiency of the container technology introduction at the open pit depth has been revealed. Originality. For the first time, on the basis of computer modeling, the parameters of stress distribution on the container wall have been substantiated when performing a strength calculation. It has been determined that the maximum stress in the container wall is 117.52 N/mm2; the principal stress value is 83.85 N/mm2. The safety factor for yield strength is 1.8. The maximum load acting on the structure is 957.5 kgf, which does not exceed the calculated value. Practical implications. The practical importance is to improve mining efficiency, reduce the cost of transporting rocks and ensure automatic container unloading. The use of replaceable containers in open pits can significantly change the formation principles of shovels and transport complexes, increase their performance and the efficiency of shovels in the main processes.
- 30 June 2022
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 16 (2) , 64-72
Substantiation of mining systems for steeply dipping low-thickness ore bodies with controlled continuous stope extraction
Purpose. The solution to one of the important problems of the underground mining method is to substantiate cost-effective, technologically feasible and safe variants for mining steeply dipping low-thickness ore bodies. Methods. Mining systems are substantiated on the basis of a detailed analysis of the developed and existing experiential variants for mining steeply dipping ore bodies, identifying production and economic disadvantages, as well as their causes. Findings.As a result of the research, the pillar raise performance in the mining system with ore shrinkage has been substantiated. The main parameters of the proposed variants for mining systems with ore shrinkage, intended for expansion-type supports and borehole breaking, have been substantiated. A design has been developed of fastening the material-running raises (MRR) and ventilating raises (VR) on the working and ventilation horizons to ensure their performance in the mining system with ore shrinkage. Originality. For the first time, dependences of dilution and labour productivity on the ore body thickness and the type of ore breaking for blast-hole stoping and borehole breaking for a single and “twinned block” have been obtained. In addition, a certain dependence of the loading and delivery performance on the average fractional composition, as well as on the delivery distance, has been obtained. Practical implications. The research is characterized by scientific innovations created for the first time, which are able to ensure the efficiency and safety of mining operations, while creating the ability to manage the loss of minerals and dilution in the block, as well as reaching their calculated optimal ratio in order to achieve the most cost-effective production rate.
- 30 June 2022
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 16 (2) , 64-72
Substantiation of mining systems for steeply dipping low-thickness ore bodies with controlled continuous stope extraction
Purpose. The solution to one of the important problems of the underground mining method is to substantiate cost-effective, technologically feasible and safe variants for mining steeply dipping low-thickness ore bodies. Methods. Mining systems are substantiated on the basis of a detailed analysis of the developed and existing experiential variants for mining steeply dipping ore bodies, identifying production and economic disadvantages, as well as their causes. Findings.As a result of the research, the pillar raise performance in the mining system with ore shrinkage has been substantiated. The main parameters of the proposed variants for mining systems with ore shrinkage, intended for expansion-type supports and borehole breaking, have been substantiated. A design has been developed of fastening the material-running raises (MRR) and ventilating raises (VR) on the working and ventilation horizons to ensure their performance in the mining system with ore shrinkage. Originality. For the first time, dependences of dilution and labour productivity on the ore body thickness and the type of ore breaking for blast-hole stoping and borehole breaking for a single and “twinned block” have been obtained. In addition, a certain dependence of the loading and delivery performance on the average fractional composition, as well as on the delivery distance, has been obtained. Practical implications. The research is characterized by scientific innovations created for the first time, which are able to ensure the efficiency and safety of mining operations, while creating the ability to manage the loss of minerals and dilution in the block, as well as reaching their calculated optimal ratio in order to achieve the most cost-effective production rate.
- 1 January 2021
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6,p. 5-10
Forecast changes in the geodynamic regime of geological environment during large-scale subsoil development
Purpose. Developing the methods for forecasting changes in the geological environment based on integrated monitoring, which ensures industrial and environmental safety of Central Kazakhstan region. Methodology. Integrated approach was used in the work, including: study on mining and geological conditions, structural features of rocks and conducting mine surveying at mines on the basis of modern methods and means of geomonitoring developed by the authors. Findings. Methodology for integrated geodynamic monitoring system is developed. A new method of geodynamic polygon establishment is proposed. Study results were implemented at operating mining enterprises during implementation of projects Comprehensive monitoring of slow deformation processes of the earths surface during large-scale development of ore deposits in Central Kazakhstan and Development of innovative methods for forecasting and assessing the state of rock mass to prevent technogenic emergencies, and the results were used in the educational process of Satbayev University. Originality. As a result of the research work carried out, the following were created and introduced into production: - geodynamic polygon (GDP) of the area, established on the basis of the nodal method, combined with leveling, satellite and seismological points, allowing monitoring coverage of exploration and mining operations, as well as increasing efficiency of observations and reducing capital costs for mineral production; - developed constructions of permanent (ground and underground) forced centering points (FCP), which allow increasing productivity and observations accuracy; - method for photographing structural features of rock mass using a 3D laser scanner, which makes it possible to study elements of cracks occurrence and faults in rocks in sufficient detail; - composition of strengthening solution from mining waste to increase stability of disturbed sections of open cast benches was developed. The novelty of the developed methods and means is confirmed by RK patents for invention. Practical value. Obtained results can be used to improve the level of industrial safety at mines and minimize environmental risks caused by subsoil development.
- 1 January 2021
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6,p. 5-10
Forecast changes in the geodynamic regime of geological environment during large-scale subsoil development
Purpose. Developing the methods for forecasting changes in the geological environment based on integrated monitoring, which ensures industrial and environmental safety of Central Kazakhstan region. Methodology. Integrated approach was used in the work, including: study on mining and geological conditions, structural features of rocks and conducting mine surveying at mines on the basis of modern methods and means of geomonitoring developed by the authors. Findings. Methodology for integrated geodynamic monitoring system is developed. A new method of geodynamic polygon establishment is proposed. Study results were implemented at operating mining enterprises during implementation of projects Comprehensive monitoring of slow deformation processes of the earths surface during large-scale development of ore deposits in Central Kazakhstan and Development of innovative methods for forecasting and assessing the state of rock mass to prevent technogenic emergencies, and the results were used in the educational process of Satbayev University. Originality. As a result of the research work carried out, the following were created and introduced into production: - geodynamic polygon (GDP) of the area, established on the basis of the nodal method, combined with leveling, satellite and seismological points, allowing monitoring coverage of exploration and mining operations, as well as increasing efficiency of observations and reducing capital costs for mineral production; - developed constructions of permanent (ground and underground) forced centering points (FCP), which allow increasing productivity and observations accuracy; - method for photographing structural features of rock mass using a 3D laser scanner, which makes it possible to study elements of cracks occurrence and faults in rocks in sufficient detail; - composition of strengthening solution from mining waste to increase stability of disturbed sections of open cast benches was developed. The novelty of the developed methods and means is confirmed by RK patents for invention. Practical value. Obtained results can be used to improve the level of industrial safety at mines and minimize environmental risks caused by subsoil development.
- 1 January 2021
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 15 (2) , 25-34
Mathematical model to optimize drilling-and-blasting operations in the process of open-pit hard rock mining
Purpose is to determine a function of the reduced expenditures connected with drilling-and-blasting operations, loading and hauling operations, and rock fragmentation depending upon the cost of machine-shift of the applied facility, its operation modes, hardness of rock being blasted, cost of the used explosive, and rock fragmentation quality based upon the developed optimization mathematical model. Methods. Method of statistical evaluation of natural blockiness structure of the rock as well as quality of its fragmentation by means of explosive energy has been applied. Statistical studies have been carried out concerning the basic indices of rock fragmentation depending upon its largeness and block hardness. Purposely-designed experimental equipment has been applied for sampling analysis of the rock fracturing in the process of its drilling by means of rotary drilling rig. The abovementioned supported representativeness of the sampling. Findings. Statistical distributions of the rock blockiness structure in terms of each bar length involving its place within the drilling assembly as well as in terms of the well depth have been compiled. Visual comparison of experimental data and theoretical data has helped determine that the statistical distributions of natural blockiness structure of the rock have the closest correlation with gamma distribution which differential function has two positive parameters. Statistical dependence has been defined between drilling-and-blasting results and the total expenditures connected with hard rock mining. Originality. A concept of oversize crushing coefficient has been introduced; its statistical dependence upon the mined rock hardness and specific consumption of the applied explosive has been derived. An alternative has been proposed concerning changes in parameters of the differential function of the assumed gamma distribution relative to the predicted granulometric composition of rock mass. Practical implications. Economic and mathematical model has been developed involving a target function of the total expenditures connected with the listed operations as well as a set of constraints avoiding incorrect decisions. The optimization method makes it possible to control drilling-and-blasting parameters at each stage of hard rock mining.
- 1 January 2021
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 15 (2) , 25-34
Mathematical model to optimize drilling-and-blasting operations in the process of open-pit hard rock mining
Purpose is to determine a function of the reduced expenditures connected with drilling-and-blasting operations, loading and hauling operations, and rock fragmentation depending upon the cost of machine-shift of the applied facility, its operation modes, hardness of rock being blasted, cost of the used explosive, and rock fragmentation quality based upon the developed optimization mathematical model. Methods. Method of statistical evaluation of natural blockiness structure of the rock as well as quality of its fragmentation by means of explosive energy has been applied. Statistical studies have been carried out concerning the basic indices of rock fragmentation depending upon its largeness and block hardness. Purposely-designed experimental equipment has been applied for sampling analysis of the rock fracturing in the process of its drilling by means of rotary drilling rig. The abovementioned supported representativeness of the sampling. Findings. Statistical distributions of the rock blockiness structure in terms of each bar length involving its place within the drilling assembly as well as in terms of the well depth have been compiled. Visual comparison of experimental data and theoretical data has helped determine that the statistical distributions of natural blockiness structure of the rock have the closest correlation with gamma distribution which differential function has two positive parameters. Statistical dependence has been defined between drilling-and-blasting results and the total expenditures connected with hard rock mining. Originality. A concept of oversize crushing coefficient has been introduced; its statistical dependence upon the mined rock hardness and specific consumption of the applied explosive has been derived. An alternative has been proposed concerning changes in parameters of the differential function of the assumed gamma distribution relative to the predicted granulometric composition of rock mass. Practical implications. Economic and mathematical model has been developed involving a target function of the total expenditures connected with the listed operations as well as a set of constraints avoiding incorrect decisions. The optimization method makes it possible to control drilling-and-blasting parameters at each stage of hard rock mining.
- 15 December 2020
- Published by National Academy of Sciences of the Republic of Kazakshtan in Series of Geology and Technical Sciences
- Vol. 6 (444) , 194-202
GEODETIC SUBSTANTIATION OF THE SARYARKA COPPER ORE REGION
. Information about copper deposits of Kazakhstan, development of which is carried out in the Saryarka region and its role in the development of the mining industry are considered in the article. Geological, structural and tectonic features of the deposits are presented. Research results on improvement methods of studying and geomechanical processes management in the development of mineral resources are presented. It is shown that the problem of geomechanical processes management can be solved on the basis of methodology for rock condition geomonitoring considered in this article, which provides comprehensive accounting and analysis of all natural and technogenic factors, as well as use of control tools developed by the authors. The article presents technical solutions to ensure operational safety during the development of Saryarka region field reserves, which occur in difficult mining and geological conditions. Ore bodies of the deposit have different sizes and are located at different depths, therefore, seismic surveys are carried out. The geodetic network of provisional seismic surveys at the field has been substantiated. It is proposed to conduct surveys using modern geodetic instruments, such as satellite technologies, electronic, digital geodetic instruments. The geodetic survey methods proposed by the authors provide information on the bowels of the earth with a high degree of accuracy.
- 15 December 2020
- Published by National Academy of Sciences of the Republic of Kazakshtan in Series of Geology and Technical Sciences
- Vol. 6 (444) , 194-202
GEODETIC SUBSTANTIATION OF THE SARYARKA COPPER ORE REGION
. Information about copper deposits of Kazakhstan, development of which is carried out in the Saryarka region and its role in the development of the mining industry are considered in the article. Geological, structural and tectonic features of the deposits are presented. Research results on improvement methods of studying and geomechanical processes management in the development of mineral resources are presented. It is shown that the problem of geomechanical processes management can be solved on the basis of methodology for rock condition geomonitoring considered in this article, which provides comprehensive accounting and analysis of all natural and technogenic factors, as well as use of control tools developed by the authors. The article presents technical solutions to ensure operational safety during the development of Saryarka region field reserves, which occur in difficult mining and geological conditions. Ore bodies of the deposit have different sizes and are located at different depths, therefore, seismic surveys are carried out. The geodetic network of provisional seismic surveys at the field has been substantiated. It is proposed to conduct surveys using modern geodetic instruments, such as satellite technologies, electronic, digital geodetic instruments. The geodetic survey methods proposed by the authors provide information on the bowels of the earth with a high degree of accuracy.