Paweł Kubek
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Paweł Kubek has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Agnieszka Dziendziel
PSE Innowacje Sp Zoo, Warsaw, Poland
2 shared publications Beata Krupanek
Department of Measurement Science, Electronics and Control, Faculty of Electrical Engineering, Silesian University of Technology, 44-100 Gliwice, Poland
1 shared publicationDominik Duda
Politech Slaska, Inst Elektroenergetyki & Sterowania Ukladow, Gliwice, Poland
1 shared publicationHenryk Kocot
Politech Slaska, Katedra Elektroenergetyki & Sterowania Ukladow, ul Boleslawa Krzywoustego 2, PL-44100 Gliwice, Poland
1 shared publication- Henryk Kocot
Politech Slaska, Katedra Elektroenergetyki & Sterowan Ukladow, Ul Boleslawa Krzywoustego 2, PL-44100 Gliwice, Poland
1 shared publication Krzysztof Maźniewski
Politech Slaska, Inst Elektroenergetyki & Sterowania Ukladow, Gliwice, Poland
1 shared publication
Latest Publications
- Open Access
Sag and Tension Calculations for High-Voltage Overhead Line Conductors
Overhead lines are used to transmit electricity from where it is generated to the receiving stations. The correct design of an overhead line affects public safety, because it should ensure the required clearances between conductors and the ground and objects located in the space under the overhead line. The temperature of conductors in overhead lines depends on the load current and weather conditions, and affects the sag and tension of the conductors. Calculations of sags and tensions of overhead conductors can be performed using simplified calculation methods that do not consider insulator sets. In some situations, this approach may cause calculation errors. This article discusses algorithms for calculating overhead conductor tensions and sags in the tensioning sections of high-voltage overhead lines, accounting for and excluding insulator sets. The analysis is carried out for different lengths of tensioning sections and various thermal and mechanical states of the conductors.
Open AccessSag and Tension Calculations for High-Voltage Overhead Line Conductors
Overhead lines are used to transmit electricity from where it is generated to the receiving stations. The correct design of an overhead line affects public safety, because it should ensure the required clearances between conductors and the ground and objects located in the space under the overhead line. The temperature of conductors in overhead lines depends on the load current and weather conditions, and affects the sag and tension of the conductors. Calculations of sags and tensions of overhead conductors can be performed using simplified calculation methods that do not consider insulator sets. In some situations, this approach may cause calculation errors. This article discusses algorithms for calculating overhead conductor tensions and sags in the tensioning sections of high-voltage overhead lines, accounting for and excluding insulator sets. The analysis is carried out for different lengths of tensioning sections and various thermal and mechanical states of the conductors.
- 1 January 2022
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 98 (12) , 40-43
Scope and methodology for measuring the parameters of the equivalent scheme of overhead lines
Dokładność odwzorowania elementów sieci przesyłowej w postaci schematów zastępczych ma istotne znaczenie w ujęciu pracy systemu elektroenergetycznego. W artykule omówiono metodykę wyznaczania modelu matematycznego linii napowietrznej. Następnie przeprowadzono ocenę wyników pomiarów parametrów wzdłużnych linii napowietrznej prądu przemiennego 50 Hz w odniesieniu do parametrów wyznaczonych analitycznie.
- 1 January 2022
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 98 (12) , 40-43
Scope and methodology for measuring the parameters of the equivalent scheme of overhead lines
Dokładność odwzorowania elementów sieci przesyłowej w postaci schematów zastępczych ma istotne znaczenie w ujęciu pracy systemu elektroenergetycznego. W artykule omówiono metodykę wyznaczania modelu matematycznego linii napowietrznej. Następnie przeprowadzono ocenę wyników pomiarów parametrów wzdłużnych linii napowietrznej prądu przemiennego 50 Hz w odniesieniu do parametrów wyznaczonych analitycznie.
- 1 January 2022
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 98 (10) , 95-98
Analysis of the mechanics of conductors in overhead power lines with the use of computer calculation tools
Article discusses the algotithms used to calculate tensile forces and sags of conductors in high voltage overhead lines tensionig sections. Also presents a 'Ruling Span' method and a computational method which enables the mechanical analysis of overhead conductors, taking into account the parameters of the insulators sets.
- 1 January 2022
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 98 (10) , 95-98
Analysis of the mechanics of conductors in overhead power lines with the use of computer calculation tools
Article discusses the algotithms used to calculate tensile forces and sags of conductors in high voltage overhead lines tensionig sections. Also presents a 'Ruling Span' method and a computational method which enables the mechanical analysis of overhead conductors, taking into account the parameters of the insulators sets.
- Open Access
Construction and Modeling of Multi-Circuit Multi-Voltage HVAC Transmission Lines
A transmission network’s main objective is to continuously supply electrical energy to consumers. This article presents an analysis of the use of multi-circuit, multi-voltage overhead lines as a compromise between ensuring the system’s safe operation by increasing the transmission network capacity and managing the constraints related to its expansion. The considerations presented in this work include the construction of such lines, their operation, and modeling aspects. As part of the study, the potential for improving the environmental conditions around the lines is discussed in terms of the necessary area for their construction and the peak electromagnetic field strength in their vicinity. We also present a mechanical analysis of stress and sag coordination in the individual circuits of these lines. Then, we detail the method for determining the electrical parameters of multi-voltage lines’ series impedances and capacitance. Specific attention is given to the possibility of zero-sequence voltage that occurs in the systems despite the symmetric supply and load of circuits—especially in the circuits with the lowest voltages—that result from the line’s geometric asymmetry. We evaluate the impact of the line’s geometric asymmetry on the power system’s correct operation by determining the asymmetry factors. Finally, the accuracy of using a simplified symmetric model for lines with various geometric asymmetries is analyzed by studying the error of the short-circuit currents.
Open AccessConstruction and Modeling of Multi-Circuit Multi-Voltage HVAC Transmission Lines
A transmission network’s main objective is to continuously supply electrical energy to consumers. This article presents an analysis of the use of multi-circuit, multi-voltage overhead lines as a compromise between ensuring the system’s safe operation by increasing the transmission network capacity and managing the constraints related to its expansion. The considerations presented in this work include the construction of such lines, their operation, and modeling aspects. As part of the study, the potential for improving the environmental conditions around the lines is discussed in terms of the necessary area for their construction and the peak electromagnetic field strength in their vicinity. We also present a mechanical analysis of stress and sag coordination in the individual circuits of these lines. Then, we detail the method for determining the electrical parameters of multi-voltage lines’ series impedances and capacitance. Specific attention is given to the possibility of zero-sequence voltage that occurs in the systems despite the symmetric supply and load of circuits—especially in the circuits with the lowest voltages—that result from the line’s geometric asymmetry. We evaluate the impact of the line’s geometric asymmetry on the power system’s correct operation by determining the asymmetry factors. Finally, the accuracy of using a simplified symmetric model for lines with various geometric asymmetries is analyzed by studying the error of the short-circuit currents.
- Open Access
The Polish Practice of Probabilistic Approach in Power System Development Planning
Power systems can be analyzed using either a deterministic or a probabilistic approach. The deterministic analysis centers on studying the quantities and indicators that characterize the operating states of the power system under strictly defined conditions. However, the long-term horizon of planning analyses, the changes of marketing mechanisms, the development of renewable electricity sources, the leaving from large-scale generation, the growth of smart technology and the increase in consumer awareness make the development of transmission networks a non-deterministic problem. In this article, we propose a planning procedure that takes the probabilistic elements into account. This procedure was developed to take into account the high variability of power flows caused by the generation of renewable sources and international exchange. Such conditions of the power system operation forced a departure from deterministic planning. The new probabilistic approach uses the existing tools and experience gained during subsequent development projects. As part of the probabilistic approach, simulations were carried out using the Latin Hypercube Sampling and Two Point Estimation Method algorithms. These methods effectively reduce the computation time and, at the same time, give satisfactory results. The verification was carried out on a test grid model developed in accordance with the technical standards used in the Polish Power System. Effects were assessed using a deterministic and probabilistic approach. This analysis confirmed the practical possibility of using the probabilistic approach in planning the development of transmission network in Poland. When using a probabilistic approach to predict power flow, the criteria of technical acceptability for a given development variant and the manner in which the strategy is determined are of particular importance.
Open AccessThe Polish Practice of Probabilistic Approach in Power System Development Planning
Power systems can be analyzed using either a deterministic or a probabilistic approach. The deterministic analysis centers on studying the quantities and indicators that characterize the operating states of the power system under strictly defined conditions. However, the long-term horizon of planning analyses, the changes of marketing mechanisms, the development of renewable electricity sources, the leaving from large-scale generation, the growth of smart technology and the increase in consumer awareness make the development of transmission networks a non-deterministic problem. In this article, we propose a planning procedure that takes the probabilistic elements into account. This procedure was developed to take into account the high variability of power flows caused by the generation of renewable sources and international exchange. Such conditions of the power system operation forced a departure from deterministic planning. The new probabilistic approach uses the existing tools and experience gained during subsequent development projects. As part of the probabilistic approach, simulations were carried out using the Latin Hypercube Sampling and Two Point Estimation Method algorithms. These methods effectively reduce the computation time and, at the same time, give satisfactory results. The verification was carried out on a test grid model developed in accordance with the technical standards used in the Polish Power System. Effects were assessed using a deterministic and probabilistic approach. This analysis confirmed the practical possibility of using the probabilistic approach in planning the development of transmission network in Poland. When using a probabilistic approach to predict power flow, the criteria of technical acceptability for a given development variant and the manner in which the strategy is determined are of particular importance.
- 5 December 2018
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 1 (12) , 110-113
Wybrane aspekty wykorzystania elementów probabilistycznych w planowaniu rozwoju sieci przesyłowej
Wydawnictwo SIGMA-NOT wydaje czasopisma fachowe informuj?ce swoich czytelnik?w o najnowszych osi?gni?ciach naukowych i nowoczesnych rozwi?zaniach technicznych w Polsce i na ?wiecie, popularyzuje problemy techniczne oraz poszerza wiedz? i kultur? techniczn?.
- 5 December 2018
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 1 (12) , 110-113
Wybrane aspekty wykorzystania elementów probabilistycznych w planowaniu rozwoju sieci przesyłowej
Wydawnictwo SIGMA-NOT wydaje czasopisma fachowe informuj?ce swoich czytelnik?w o najnowszych osi?gni?ciach naukowych i nowoczesnych rozwi?zaniach technicznych w Polsce i na ?wiecie, popularyzuje problemy techniczne oraz poszerza wiedz? i kultur? techniczn?.