Hang Su
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hang Su has a total of 24 co-authors. Here are the top co-authors by number of shared publications:
- Kan Wang
National Time Service Center, Chinese Academy of Sciences, Xi’an, China
4 shared publications - Xuhai Yang
National Time Service Center, Chinese Academy of Sciences, Xi’an 710600, China
4 shared publications - Ahmed El-Mowafy
Curtin University
2 shared publications - Weijin Qin
National Time Service Center, Chinese Academy of Sciences, Xi’an 710600, People’s Republic of China
2 shared publications Xuhai Yang
National Time Service Center, CAS, Xi’an, People’s Republic of China
2 shared publicationsBaoqi Sun
National Time Service Center, CAS, Xi’an, People’s Republic of China
1 shared publication
Latest Publications
- Open Access
- 8 May 2026
- Published by IOP Publishing in Measurement Science and Technology
- Vol. 37 (19) , 196302
Orbit prediction with pre-planned maneuver accelerations using an adaptive IME strategy
The rapid growth of low Earth orbit mega-constellations increases the demand for accurate and computationally efficient orbit prediction in flight dynamics operations, particularly when maneuvers are scheduled for conjunction screening and mission planning. This study investigates an operator-oriented orbit prediction workflow that incorporates pre-planned maneuver accelerations through an adaptive interval of motion equation, T IME (IME) strategy. Maneuver-free tests are first conducted to examine the trade-off between prediction accuracy and computational cost for different fitting intervals and T IME values over a 24 h prediction interval. Results for Sentinel-1A show a clear accuracy plateau for T IME ⩽ 3 min. A T IME of 3 min combined with a 3 h fitting interval achieves the same 24 h prediction accuracy of 5.96 m as a 1 s T IME , while reducing runtime from nearly 21 min to about 8 s on the tested processor. Extending the fitting interval to 24 h further improves the 24 h prediction accuracy to 3.95 m, but reduces the 1 h accuracy from 0.09 m to 0.35 m. Additional maneuver-free tests on GRACE-C, Sentinel-3B, and Sentinel-6A show that the recommended T IME within the tested candidate set is closely related to orbital altitude. The maneuver-aware workflow is then evaluated on 74 Sentinel-1A maneuver events, including both single and consecutive maneuvers. For predictions starting at the first maneuver or 1 h before it, the method achieves about 5 m accuracy at 1 h prediction and around 60 m at 24 h prediction. Event-wise statistics show that adaptive T IME values often decrease to the sub-minute level for consecutive-maneuver cases, substantially increasing runtime, while the final 24 h prediction error is driven more by overall maneuver complexity than by the selected T IME alone. Overall, the results provide a practical reference for operator-oriented maneuver-aware prediction and for the selection of fitting intervals and T IME settings in real flight dynamics applications.
- 8 May 2026
- Published by IOP Publishing in Measurement Science and Technology
- Vol. 37 (19) , 196302
Open AccessOrbit prediction with pre-planned maneuver accelerations using an adaptive IME strategy
The rapid growth of low Earth orbit mega-constellations increases the demand for accurate and computationally efficient orbit prediction in flight dynamics operations, particularly when maneuvers are scheduled for conjunction screening and mission planning. This study investigates an operator-oriented orbit prediction workflow that incorporates pre-planned maneuver accelerations through an adaptive interval of motion equation, T IME (IME) strategy. Maneuver-free tests are first conducted to examine the trade-off between prediction accuracy and computational cost for different fitting intervals and T IME values over a 24 h prediction interval. Results for Sentinel-1A show a clear accuracy plateau for T IME ⩽ 3 min. A T IME of 3 min combined with a 3 h fitting interval achieves the same 24 h prediction accuracy of 5.96 m as a 1 s T IME , while reducing runtime from nearly 21 min to about 8 s on the tested processor. Extending the fitting interval to 24 h further improves the 24 h prediction accuracy to 3.95 m, but reduces the 1 h accuracy from 0.09 m to 0.35 m. Additional maneuver-free tests on GRACE-C, Sentinel-3B, and Sentinel-6A show that the recommended T IME within the tested candidate set is closely related to orbital altitude. The maneuver-aware workflow is then evaluated on 74 Sentinel-1A maneuver events, including both single and consecutive maneuvers. For predictions starting at the first maneuver or 1 h before it, the method achieves about 5 m accuracy at 1 h prediction and around 60 m at 24 h prediction. Event-wise statistics show that adaptive T IME values often decrease to the sub-minute level for consecutive-maneuver cases, substantially increasing runtime, while the final 24 h prediction error is driven more by overall maneuver complexity than by the selected T IME alone. Overall, the results provide a practical reference for operator-oriented maneuver-aware prediction and for the selection of fitting intervals and T IME settings in real flight dynamics applications.
- 20 November 2024
- Published by IOP Publishing in Physica Scripta
- Vol. 99 (12) , 125026
Analysis of the performance of the PPP-B2b satellite clock and its effects on time transfer
BDS-3 is capable of providing precise point positioning (PPP) services via B2b signals for the Asia–Pacific region. The performance of the satellite clock plays a dominant role in the transmission interval of B2b clock correction and PPP time transfer. In this work, first, the coverage of B2b signals is analysed, and the performance of the satellite clock is evaluated (including orbit accuracy, clock stability, clock accuracy and prediction accuracy). Second, the results of time transfer based on BDS-3 PPP-B2b are investigated. The values show that the orbit error of BDS-3 recovered from PPP-B2b is better than that of the GPS recovered from PPP-B2b. The stability of BDS-3 recovered from the PPP-B2b clock is superior to that of the GPS PPP-B2b clock. The stability of the BDS-3 clock is approximately 1∼2 e-13, 5∼9 e-14, and 3∼5 e-14 at 100 s, 1000 s, and 10000 s, respectively. No obvious discrepancy exists in the BDS-3 clocks of different types. The mean prediction accuracy of BDS-3 is 0.03 ns when the prediction time is up to 120 s, and the prediction accuracy of the GPS is 0.28 ns when the prediction time is merely 30 s. This result shows that it is possible to decrease the transmission interval of BDS-3 B2b clock correction and save much space. The time transfer based on BDS-3 PPP-B2b can subsequently achieve a 0.50 ns level. The frequency stability of the time link is approximately 9.25E-14, 2.42E-14, and 9.34E-15 at 100 s, 1000 s, and 10000 s, respectively. We can conclude that the BDS-3 PPP-B2b solution is reliable for time transfer.
- 20 November 2024
- Published by IOP Publishing in Physica Scripta
- Vol. 99 (12) , 125026
Analysis of the performance of the PPP-B2b satellite clock and its effects on time transfer
BDS-3 is capable of providing precise point positioning (PPP) services via B2b signals for the Asia–Pacific region. The performance of the satellite clock plays a dominant role in the transmission interval of B2b clock correction and PPP time transfer. In this work, first, the coverage of B2b signals is analysed, and the performance of the satellite clock is evaluated (including orbit accuracy, clock stability, clock accuracy and prediction accuracy). Second, the results of time transfer based on BDS-3 PPP-B2b are investigated. The values show that the orbit error of BDS-3 recovered from PPP-B2b is better than that of the GPS recovered from PPP-B2b. The stability of BDS-3 recovered from the PPP-B2b clock is superior to that of the GPS PPP-B2b clock. The stability of the BDS-3 clock is approximately 1∼2 e-13, 5∼9 e-14, and 3∼5 e-14 at 100 s, 1000 s, and 10000 s, respectively. No obvious discrepancy exists in the BDS-3 clocks of different types. The mean prediction accuracy of BDS-3 is 0.03 ns when the prediction time is up to 120 s, and the prediction accuracy of the GPS is 0.28 ns when the prediction time is merely 30 s. This result shows that it is possible to decrease the transmission interval of BDS-3 B2b clock correction and save much space. The time transfer based on BDS-3 PPP-B2b can subsequently achieve a 0.50 ns level. The frequency stability of the time link is approximately 9.25E-14, 2.42E-14, and 9.34E-15 at 100 s, 1000 s, and 10000 s, respectively. We can conclude that the BDS-3 PPP-B2b solution is reliable for time transfer.
- Open Access
- 27 November 2023
- Published by Elsevier in Measurement
- Vol. 224
Prediction and ephemeris fitting of LEO navigation satellites orbits computed at the antenna phase center
- 27 November 2023
- Published by Elsevier in Measurement
- Vol. 224
Open AccessPrediction and ephemeris fitting of LEO navigation satellites orbits computed at the antenna phase center
- Open Access
- 26 December 2022
- Published by MDPI AG in Remote Sensing
- Vol. 15 (1) , 133
Real-Time LEO Satellite Orbits Based on Batch Least-Squares Orbit Determination with Short-Term Orbit Prediction
The augmentation of the Global Navigation Satellite System (GNSS) by Low Earth Orbit (LEO) satellites is proposed as an effective method to improve the precision and shorten the convergence time of Precise Point Positioning (PPP). Serving as navigation satellites in the future, LEO satellites need to be provided with their high-accuracy orbits in real-time. This would potentially enable the high-accuracy real-time LEO satellite clock determination, and eventually facilitate the high-accuracy ground-based positioning. Studies have been performed to achieve such real-time orbits using a Kalman filter in both the kinematic and reduced-dynamic modes. Batch Least-Squares (BLS) adjustment delivers more stable orbits in near-real-time, as it performs better phase screening. However, it suffers from longer delays compared to the Kalman filter. With the LEO satellite orbit prediction strategies improved over time, this latency can be bridged by short-term orbit prediction. In this study, using real-time GNSS satellite products, the real-time LEO satellite orbits are obtained based on the batch least-squares adjustment and short-term prediction. LEO ephemeris parameters are generated within specific prediction time windows. Using real data from the 500 km GRACE C satellite and 810 km Sentinel-3B satellite, the near-real-time BLS Precise Orbit Determination (POD) results exhibit good accuracy with an Orbital User Range Error (OURE) of 2–4 cm using different real-time GNSS products. A range of delays of the BLS POD processes are assumed, based on tests performed on different processing machines, leading to various prediction windows, from 3–8 min to 12–17 min that correspond to the real-time usage. The orbital prediction errors are shown to be highly correlated with the orbital height and the prediction time. The computational efficiency thus becomes essential to reduce the prediction errors for a certain LEO satellite. For advanced processing units leading to a prediction window shorter or equal to 6–11 min, one can expect a total real-time orbital error budget of 3–5 cm, provided that an appropriate prediction strategy is applied and high-quality GNSS products are used. For a given fitting interval, the ephemeris fitting errors are generally related to the number of ephemeris parameters and the orbital height. Compared with the prediction errors, the ephemeris fitting errors do not play a significant role in the total error budget when using 22 ephemeris parameters.
- 26 December 2022
- Published by MDPI AG in Remote Sensing
- Vol. 15 (1) , 133
Open AccessReal-Time LEO Satellite Orbits Based on Batch Least-Squares Orbit Determination with Short-Term Orbit Prediction
The augmentation of the Global Navigation Satellite System (GNSS) by Low Earth Orbit (LEO) satellites is proposed as an effective method to improve the precision and shorten the convergence time of Precise Point Positioning (PPP). Serving as navigation satellites in the future, LEO satellites need to be provided with their high-accuracy orbits in real-time. This would potentially enable the high-accuracy real-time LEO satellite clock determination, and eventually facilitate the high-accuracy ground-based positioning. Studies have been performed to achieve such real-time orbits using a Kalman filter in both the kinematic and reduced-dynamic modes. Batch Least-Squares (BLS) adjustment delivers more stable orbits in near-real-time, as it performs better phase screening. However, it suffers from longer delays compared to the Kalman filter. With the LEO satellite orbit prediction strategies improved over time, this latency can be bridged by short-term orbit prediction. In this study, using real-time GNSS satellite products, the real-time LEO satellite orbits are obtained based on the batch least-squares adjustment and short-term prediction. LEO ephemeris parameters are generated within specific prediction time windows. Using real data from the 500 km GRACE C satellite and 810 km Sentinel-3B satellite, the near-real-time BLS Precise Orbit Determination (POD) results exhibit good accuracy with an Orbital User Range Error (OURE) of 2–4 cm using different real-time GNSS products. A range of delays of the BLS POD processes are assumed, based on tests performed on different processing machines, leading to various prediction windows, from 3–8 min to 12–17 min that correspond to the real-time usage. The orbital prediction errors are shown to be highly correlated with the orbital height and the prediction time. The computational efficiency thus becomes essential to reduce the prediction errors for a certain LEO satellite. For advanced processing units leading to a prediction window shorter or equal to 6–11 min, one can expect a total real-time orbital error budget of 3–5 cm, provided that an appropriate prediction strategy is applied and high-quality GNSS products are used. For a given fitting interval, the ephemeris fitting errors are generally related to the number of ephemeris parameters and the orbital height. Compared with the prediction errors, the ephemeris fitting errors do not play a significant role in the total error budget when using 22 ephemeris parameters.
- Open Access
- 8 November 2021
- Published by MDPI AG in Remote Sensing
- Vol. 13 (21) , 4490
Evaluation of Precipitable Water Vapor Retrieval from Homogeneously Reprocessed Long-Term GNSS Tropospheric Zenith Wet Delay, and Multi-Technique
Water vapor is one of the most important greenhouse gases in the world. There are many techniques that can measure water vapor directly or remotely. In this work, we first study the Global Positioning System (GPS)- and the Global Navigation Satellite System (GLONASS)-derived Zenith Wet Delay (ZWD) time series based on 11 years of the second reprocessing campaign of International Global Navigation Satellite Systems (GNSS) Service (IGS) using 320 globally distributed stations. The amount of measurement, the local environment, and the antenna radome are shown to be the main factors that affect the GNSS ZWDs and the corresponding a posteriori formal errors. Furthermore, antenna radome is able to effectively reduce the systematic bias of ZWDs and a posteriori formal errors between the GPS- and GLONASS-based solutions. With the development of the GLONASS, the ZWD differences between the GPS- and the GLONASS-based solutions have gradually decreased to sub-mm-level after GLONASS was fully operated. As the GPS-based Precipitable Water Vapor (PWV) is usually used as the reference to evaluate the other PWV products, the PWV consistency among several common techniques is evaluated, including GNSSs, spaceborne sensors, and numerical products from the European Center for Medium-Range Weather Forecasts (ECMWF). As an example of the results from a detailed comparison analysis, the long-term global analysis shows that the PWV obtained from the GNSS and the ECMWF have great intra-agreements. Based on the global distribution of the magnitude of the PWV and the PWV drift, most of the techniques showed superior agreement and proved their ability to do climate research. With a detailed study performed for the ZWDs and PWV on a long-term global scale, this contribution provides a useful supplement for future research on the GNSS ZWD and PWV.
- 8 November 2021
- Published by MDPI AG in Remote Sensing
- Vol. 13 (21) , 4490
Open AccessEvaluation of Precipitable Water Vapor Retrieval from Homogeneously Reprocessed Long-Term GNSS Tropospheric Zenith Wet Delay, and Multi-Technique
Water vapor is one of the most important greenhouse gases in the world. There are many techniques that can measure water vapor directly or remotely. In this work, we first study the Global Positioning System (GPS)- and the Global Navigation Satellite System (GLONASS)-derived Zenith Wet Delay (ZWD) time series based on 11 years of the second reprocessing campaign of International Global Navigation Satellite Systems (GNSS) Service (IGS) using 320 globally distributed stations. The amount of measurement, the local environment, and the antenna radome are shown to be the main factors that affect the GNSS ZWDs and the corresponding a posteriori formal errors. Furthermore, antenna radome is able to effectively reduce the systematic bias of ZWDs and a posteriori formal errors between the GPS- and GLONASS-based solutions. With the development of the GLONASS, the ZWD differences between the GPS- and the GLONASS-based solutions have gradually decreased to sub-mm-level after GLONASS was fully operated. As the GPS-based Precipitable Water Vapor (PWV) is usually used as the reference to evaluate the other PWV products, the PWV consistency among several common techniques is evaluated, including GNSSs, spaceborne sensors, and numerical products from the European Center for Medium-Range Weather Forecasts (ECMWF). As an example of the results from a detailed comparison analysis, the long-term global analysis shows that the PWV obtained from the GNSS and the ECMWF have great intra-agreements. Based on the global distribution of the magnitude of the PWV and the PWV drift, most of the techniques showed superior agreement and proved their ability to do climate research. With a detailed study performed for the ZWDs and PWV on a long-term global scale, this contribution provides a useful supplement for future research on the GNSS ZWD and PWV.
- Open Access
The Benefits of Receiver Clock Modelling in Satellite Timing
Satellite timing is an effective and convenient method that has been widely accepted in the time community. The key to satellite timing is obtaining a clean receiver clock offset. In this paper, instead of regarding the receiver clock offset as white noise, a two-state stochastic clock model involving three kinds of noise was conceived and used in PPP filter estimation. The influence of clock type and sampling time on satellite timing performance was first analysed. In addition, the kinematic scheme and static scheme were both investigated for meeting the demands of multi-occasional users. The values show that the model works well for both the kinematic scheme and static scheme; in contrast to that of the white noise model, the timing stability is enhanced at all the sampling times. For the six stations, especially when the averaging time is less than 1000 s, the average stability improvement values of the kinematic scheme are 75.53, 43.24, 75.00, 69.05, 40.57, and 25.45%, and the average improvement values of the static scheme are 65.49, 77.94, 56.71, 60.78, 64.41, and 39.41%. Furthermore, the enhancement magnitude is related to clock type. For a high-stability clock, the improvement of the kinematic scheme is greater than that of the static scheme, whereas for a low-stability clock, the improvement of the kinematic scheme is less than that of the static scheme.
Open AccessThe Benefits of Receiver Clock Modelling in Satellite Timing
Satellite timing is an effective and convenient method that has been widely accepted in the time community. The key to satellite timing is obtaining a clean receiver clock offset. In this paper, instead of regarding the receiver clock offset as white noise, a two-state stochastic clock model involving three kinds of noise was conceived and used in PPP filter estimation. The influence of clock type and sampling time on satellite timing performance was first analysed. In addition, the kinematic scheme and static scheme were both investigated for meeting the demands of multi-occasional users. The values show that the model works well for both the kinematic scheme and static scheme; in contrast to that of the white noise model, the timing stability is enhanced at all the sampling times. For the six stations, especially when the averaging time is less than 1000 s, the average stability improvement values of the kinematic scheme are 75.53, 43.24, 75.00, 69.05, 40.57, and 25.45%, and the average improvement values of the static scheme are 65.49, 77.94, 56.71, 60.78, 64.41, and 39.41%. Furthermore, the enhancement magnitude is related to clock type. For a high-stability clock, the improvement of the kinematic scheme is greater than that of the static scheme, whereas for a low-stability clock, the improvement of the kinematic scheme is less than that of the static scheme.
- 30 May 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Ultrasonics, Ferroelectrics, and Frequency Control
- Vol. 65 (8) , 1475-1486
An Improved Protocol for Performing Two-Way Satellite Time and Frequency Transfer Using a Satellite in an Inclined Geo-Synchronous Orbit
Two-way satellite time and frequency transfer (TWSTFT) using satellites in inclined geo-synchronous orbit (IGSO) is fundamentally more difficult than using satellites in geostationary orbit (GEO), due to the fact that IGSO satellites are constantly moving relative to a ground station, which brings in large residual effects. In this paper, we designed a protocol and an algorithm to correct several factors that affect the precision of TWSTFT using IGSO satellites. We used two ground stations, each equipped with sending and receiving channels, to conduct real-time measurements of the distance and the speed of an IGSO satellite, and data collected were used to make appropriate corrections. We tested this concept by conducting TWSTFT experiments using an IGSO satellite (BEIDOU I1-S), and compared the results with that obtained using a GEO satellite (CHINASAT 12). Indeed, the individual components that contribute to the residual effects of TWSTFT measurements using the IGSO satellite were several orders of magnitude greater than that of the GEO satellite. By using our modified protocol, TWSTFT results with an IGSO satellite were well accorded with that of using a GEO satellite; the standard deviation of residuals was less than 0.4 ns, well within the limit for the measurement uncertainty of TWSTFT. Therefore, we have expanded the use of IGSO satellites for TWSTFT. In principle, it should also be applicable to medium earth orbit and other satellites.
- 30 May 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Ultrasonics, Ferroelectrics, and Frequency Control
- Vol. 65 (8) , 1475-1486
An Improved Protocol for Performing Two-Way Satellite Time and Frequency Transfer Using a Satellite in an Inclined Geo-Synchronous Orbit
Two-way satellite time and frequency transfer (TWSTFT) using satellites in inclined geo-synchronous orbit (IGSO) is fundamentally more difficult than using satellites in geostationary orbit (GEO), due to the fact that IGSO satellites are constantly moving relative to a ground station, which brings in large residual effects. In this paper, we designed a protocol and an algorithm to correct several factors that affect the precision of TWSTFT using IGSO satellites. We used two ground stations, each equipped with sending and receiving channels, to conduct real-time measurements of the distance and the speed of an IGSO satellite, and data collected were used to make appropriate corrections. We tested this concept by conducting TWSTFT experiments using an IGSO satellite (BEIDOU I1-S), and compared the results with that obtained using a GEO satellite (CHINASAT 12). Indeed, the individual components that contribute to the residual effects of TWSTFT measurements using the IGSO satellite were several orders of magnitude greater than that of the GEO satellite. By using our modified protocol, TWSTFT results with an IGSO satellite were well accorded with that of using a GEO satellite; the standard deviation of residuals was less than 0.4 ns, well within the limit for the measurement uncertainty of TWSTFT. Therefore, we have expanded the use of IGSO satellites for TWSTFT. In principle, it should also be applicable to medium earth orbit and other satellites.