QXQingyu Xu

Qingyu Xu

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Qingyu Xu has a total of 35 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • System-level impacts of voluntary carbon-free electricity procurement strategies

    by Qingyu Xu, Wilson Ricks, Aneesha Manocha, Neha Patankar, Jesse D. Jenkins


  • A Computationally Efficient Benders Decomposition for Energy Systems Planning Problems with Detailed Operations and Time-Coupling Constraints

    by Anna Jacobson, Filippo Pecci, Nestor Sepulveda, Qingyu Xu, Jesse Jenkins

    Energy systems planning models identify least-cost strategies for expansion and operation of energy systems and provide decision support for investment, planning, regulation, and policy. Most are formulated as linear programming (LP) or mixed integer linear programming (MILP) problems. Despite the relative efficiency and maturity of LP and MILP solvers, large scale problems are often intractable without abstractions that impact quality of results and generalizability of findings. We consider a macro-energy systems planning problem with detailed operations and policy constraints and formulate a computationally efficient Benders decomposition separating investments from operations and decoupling operational timesteps using budgeting variables in the master model. This novel approach enables parallelization of operational subproblems and permits modeling of relevant constraints coupling decisions across time periods (e.g., policy constraints) within a decomposed framework. Runtime scales linearly with temporal resolution; tests demonstrate substantial runtime improvement for all MILP formulations and for some LP formulations depending on problem size relative to analogous monolithic models solved with state-of-the-art commercial solvers. Our algorithm is applicable to planning problems in other domains (e.g., water, transportation networks, production processes) and can solve large-scale problems otherwise intractable. We show that the increased resolution enabled by this algorithm mitigates structural uncertainty, improving recommendation accuracy. Funding: Funding for this work was provided by the Princeton Carbon Mitigation Initiative (funded by a gift from BP) and the Princeton Zero-carbon Technology Consortium (funded by gifts from GE, Google, ClearPath, and Breakthrough Energy). Supplemental Material: The e-companion is available at https://doi.org/10.1287/ijoo.2023.0005 .


  • Top Cited Papers
    Open Access

    Minimizing emissions from grid-based hydrogen production in the United States

    by Wilson Ricks, Qingyu Xu, Jesse D Jenkins

    Low-carbon hydrogen could be an important component of a net-zero carbon economy, helping to mitigate emissions in a number of hard-to-abate sectors. The United States recently introduced an escalating production tax credit (PTC) to incentivize production of hydrogen meeting increasingly stringent embodied emissions thresholds. Hydrogen produced via electrolysis can qualify for the full subsidy under current federal accounting standards if the input electricity is generated by carbon-free resources, but may fail to do so if emitting resources are present in the generation mix. While use of behind-the-meter carbon-free electricity inputs can guarantee compliance with this standard, the PTC could also be structured to allow producers using grid-supplied electricity to qualify subject to certain clean energy procurement requirements. Herein we use electricity system capacity expansion modeling to quantitatively assess the impact of grid-connected electrolysis on the evolution of the power sector in the western United States through 2030 under multiple possible implementations of the clean hydrogen PTC. We find that subsidized grid-connected hydrogen production has the potential to induce additional emissions at effective rates worse than those of conventional, fossil-based hydrogen production pathways. Emissions can be minimized by requiring grid-based hydrogen producers to match 100% of their electricity consumption on an hourly basis with physically deliverable, ‘additional’ clean generation, which ensures effective emissions rates equivalent to electrolysis exclusively supplied by behind-the-meter carbon-free generation. While these requirements cannot eliminate indirect emissions caused by competition for limited clean resources, which we find to be a persistent result of large hydrogen production subsidies, they consistently outperform alternative approaches relying on relaxed time matching or marginal emissions accounting. Added hydrogen production costs from enforcing an hourly matching requirement rather than no requirements are less than $1 kg−1, and can be near zero if clean, firm electricity resources are available for procurement.


  • Open Access

    System-Level Impacts of 24/7 Carbon-Free Electricity Procurement

    by Qingyu Xu, Aneesha Manocha, Neha Patankar, Jesse Jenkins

    This study enhances a capacity expansion planning model to study the system-level impact of voluntary procurement of a portfolio of carbon-free electricity within the same grid region to match the demand of participating commercial and industrial (C&I) customers on an hourly basis, known as 24/7 carbon-free electricity procurement or hourly matching. For comparison, we also model scenarios where the same participants procure CFE to meet 100% of electricity demand on an annual volumetric basis, a common practice today we refer to as volumetric matching. Results show that the attributional carbon dioxide (CO2) emissions of 24/7 CFE participants employing hourly matching is significantly lower than 100% volumetric matching due to better alignment between participants' electricity consumption and CFE generation. Given a high CFE target, hourly CFE procurement can also drive greater system-level CO2 emissions reductions. Hourly 24/7 CFE procurement drives early deployment of advanced, 'clean firm' resources, such as natural gas power plants with carbon capture and storage and long-duration energy storage. While hourly matching delivers greater impact, it also comes at a more significant cost premium ($13/MWh - $30/MWh higher) than volumetric matching. This cost premium is lower when a full portfolio of clean firm resources is available and can be further reduced by targeting less than 100% hourly matching.


  • Open Access

    Using probabilistic solar power forecasts to inform flexible ramp product procurement for the California ISO

    by Benjamin F. Hobbs, Jie Zhang, Hendrik F. Hamann, Carlo Siebenschuh, Rui Zhang, Binghui Li, Ibrahim Krad, Venkat Krishnan, Evangelia Spyrou, Yijiao Wang, et al.


  • Coordinated Ramping Product and Regulation Reserve Procurements in CAISO and MISO using Multi-Scale Probabilistic Solar Power Forecasts (Pro2R)

    by Benjamin F Hobbs, Yijiao Wang, Qingyu Xu, Shu Zhang, Hendrik F. Hamann, Rui Zhang, Carlo Siebenschuh, Jie Zhang, Binghui Li, Li He, et al.

    How can probabilistic solar forecasts lower costs and improve reliability for independent system operator (ISO) markets? We tackle this question in three steps (Fig. 1). First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty in those forecasts to error distributions for net load ramps for the California ISO (CAISO) using statistical and machine learning methods. Projected net load errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Finally, a multi-period look-ahead production cost model quantifies how conditional ramp requirements can a) decrease operating costs by lowering requirements compared to often conservative unconditional methods, and b) reduce generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. In addition to the products just described (quantification of solar uncertainty, its translation into requirements for ramp capability product, and quantification of the benefits of more accurate ramp requirements), this project also developed a visualization system that alerts system operators of ramp and uncertainty conditions within the network based on solar forecasts. The system is calledmore » Resource Forecast and Ramp Visualization for Situational Awareness (RaVIS). These four products represent significant advances in the state-of-the-art of probabilistic solar forecasting, development of weather-informed reserve requirements, production costing methods for estimating the benefits of more accurate reserve requirements, and visualization of system status, respectively. Yet the products are also practical and can be immediately implemented, potentially enabling system operators to save millions of dollars in ramp product procurement costs per year. « less


  • Crediting Variable Renewable Energy and Energy Storage in Capacity Markets: Effects of Unit Commitment and Storage Operation

    by Shen Wang, Ningkun Zheng, Cynthia D. Bothwell, Qingyu Xu, Saamrat Kasina, Benjamin F. Hobbs

    As more variable renewable energy (VRE) and energy storage (ES) facilities are installed, accurate quantification of their contributions to system adequacy becomes crucial. We propose a definition of capacity credit (CC) for valuing adequacy contributions of these resources based on their marginal capability to reduce expected unserved energy. We show that such marginal credits can incentivize system-optimal investments in markets with installed capacity requirements and energy price caps. We simulated such markets using a LP-based capacity expansion planning model with convexified unit commitment (UC) constraints and ES. The impacts of UC and ES on capacity credits are investigated. Furthermore, we analyze technology and system cost distortions resulting from implementing inaccurate CCs in the capacity market. The results show that ignoring UC constraints can overestimate the CCs for VRE and ES. Building ES increases the CCs of VRE resources with higher capacity factors and a negative correlation with load. Assigning the wrong credit to VRE can significantly distort resource mixes and system cost. Implementing the proposed CCs can, in theory, eliminate those distortions and achieve the same overall optimum as a theoretical market without energy price caps.


  • Open Access

    Value of model enhancements: quantifying the benefit of improved transmission planning models

    by Qingyu Xu, Benjamin F. Hobbs

    A framework to quantify the value of model enhancements (VOMEs) in transmission planning models is proposed and applied to a case study of the large‐scale, long‐term planning of the Western Electricity Coordinating Council (WECC) system. The VOME, which is closely related to the concept of the value of information from decision analysis, quantifies the probability‐weighted improvement in the system performance resulting from changes in decisions that result from model enhancements. The WECC case study shows that it is practical to quantify VOME and illustrates the type of insights that can be obtained. The values of four types of model enhancements are compared. The results show major benefits from considering long‐run uncertainty using multiple scenarios of technology, policy, and economics; these benefits are as much as 14% of total benefits of new transmission built in the first ten years. However, less benefit is obtained from more temporal granularity, more complex network representations, and inclusion of unit commitment constraints and costs. This framework can be applied to quantify the VOMEs in any planning context, such as integrated resource planning.