Keaton A. Wheeler
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Keaton A. Wheeler has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Mohamed Elsamahy
University of Saskatchewan, Saskatoon, Canada
1 shared publication - Sherif Omar Faried
Department of Electrical and Computer Engineering, University of Saskatchewan, Saskatoon, SK, Canada
1 shared publication
Latest Publications
- 24 August 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 33 (2) , 981-991
A Novel Reclosing Scheme for Mitigation of Distributed Generation Effects on Overcurrent Protection
This paper proposes a novel scheme to mitigate DG effects on existing fuse-recloser protection in radial distribution networks. The proposed scheme employs a control unit, variable load bank and dedicated recloser at the point of common coupling (PCC). It detects the increase in the DG terminal current producing a tripping signal when it exceeds a preset value. It also receives a fault detection signal from the head-end recloser via a fast communication channel; hence disconnects the DG unit from the system and connects a transfer impedance at the PCC to operate the DG unit at its pre-fault load sharing condition. This allows the DG unit to maintain operation at the pre-fault level with no need for immediate shut down. As a result, faster reconnection of the DG unit to the system is guaranteed after successful reclosing. The transfer impedance is selected from a variable load-bank and is a function of the pre-fault load sharing condition; therefore, a sensitivity survey was performed to cover all possible system operating conditions and its corresponding transfer impedances. Multiple in-depth time domain simulations are conducted to ascertain the efficiency of the proposed scheme in mitigating the impact of DG sources on existing overcurrent protection infrastructure. Time domain simulations have been conducted using a typical distribution network in the EMTP-RV software environment for validation purposes.
- 24 August 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 33 (2) , 981-991
A Novel Reclosing Scheme for Mitigation of Distributed Generation Effects on Overcurrent Protection
This paper proposes a novel scheme to mitigate DG effects on existing fuse-recloser protection in radial distribution networks. The proposed scheme employs a control unit, variable load bank and dedicated recloser at the point of common coupling (PCC). It detects the increase in the DG terminal current producing a tripping signal when it exceeds a preset value. It also receives a fault detection signal from the head-end recloser via a fast communication channel; hence disconnects the DG unit from the system and connects a transfer impedance at the PCC to operate the DG unit at its pre-fault load sharing condition. This allows the DG unit to maintain operation at the pre-fault level with no need for immediate shut down. As a result, faster reconnection of the DG unit to the system is guaranteed after successful reclosing. The transfer impedance is selected from a variable load-bank and is a function of the pre-fault load sharing condition; therefore, a sensitivity survey was performed to cover all possible system operating conditions and its corresponding transfer impedances. Multiple in-depth time domain simulations are conducted to ascertain the efficiency of the proposed scheme in mitigating the impact of DG sources on existing overcurrent protection infrastructure. Time domain simulations have been conducted using a typical distribution network in the EMTP-RV software environment for validation purposes.