Boming Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Boming Zhang has a total of 50 co-authors. Here are the top co-authors by number of shared publications:
- Wenchuan Wu
Tsinghua University
15 shared publications - Hongbin Sun
Tsinghua University
10 shared publications - Qinglai Guo
Tsinghua University
5 shared publications - Bin Wang
Department of Electrical Engineering, Tsinghua University, Beijing, China
3 shared publications - Xue Tai
Electrical Engineering, Tsinghua University, Beijing, Beijing China
3 shared publications - Zihao Li
Electrical Engineering, Tsinghua University, 12442 Beijing, Beijing China 100086
3 shared publications
Latest Publications
- 7 August 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 36 (2) , 948-960
A Reliability-Constrained Expansion Planning Model for Mesh Distribution Networks
To achieve high reliability, the urban distribution networks are mesh-constructed and radial-operated, in which the outage load can be restored to adjacent feeders via tie-lines after faults. Conventionally, iterative optimization-simulation methods and heuristics are adopted for distribution network planning, which cannot guarantee global optimality. Besides, existing reliability-constrained planning model cannot explicitly assess the reliability indices for mesh distribution networks, so the resulted plan scheme may be overly invested. In this paper, we propose a novel multistage expansion planning model for mesh distribution networks, in which reliability assessment is explicitly implemented as constraints. The different investment/reliability preferences for buses are also customized. Specifically, post-fault load restoration between feeders through tie-lines is modeled as a case of post-fault network reconfiguration. The planning model is then cast as an instance of mixed-integer linear programming and can be effectively solved by off-the-shelf solvers. We use a 54-node system to test the performance of proposed model. Simulation results show the effectiveness and flexibility of this methodology.
- 7 August 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 36 (2) , 948-960
A Reliability-Constrained Expansion Planning Model for Mesh Distribution Networks
To achieve high reliability, the urban distribution networks are mesh-constructed and radial-operated, in which the outage load can be restored to adjacent feeders via tie-lines after faults. Conventionally, iterative optimization-simulation methods and heuristics are adopted for distribution network planning, which cannot guarantee global optimality. Besides, existing reliability-constrained planning model cannot explicitly assess the reliability indices for mesh distribution networks, so the resulted plan scheme may be overly invested. In this paper, we propose a novel multistage expansion planning model for mesh distribution networks, in which reliability assessment is explicitly implemented as constraints. The different investment/reliability preferences for buses are also customized. Specifically, post-fault load restoration between feeders through tie-lines is modeled as a case of post-fault network reconfiguration. The planning model is then cast as an instance of mixed-integer linear programming and can be effectively solved by off-the-shelf solvers. We use a 54-node system to test the performance of proposed model. Simulation results show the effectiveness and flexibility of this methodology.
- 17 March 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 35 (5) , 3991-4004
Optimization Model-Based Reliability Assessment for Distribution Networks Considering Detailed Placement of Circuit Breakers and Switches
Requirements of economic and reliability criteria are often stressed simultaneously in operating and planning models for distribution systems. However, conventional reliability evaluation algorithms are hard to be integrated to these optimization models analytically. Recently, several optimization model-based reliability assessment methods have been proposed, which can be embedded into such models. However, the detailed placement and actions of circuit breakers and switches are ignored or oversimplified in these methods, leading to an inconsistency with the real world situation. Thus, we propose a new optimization model-based reliability assessment method that fully considers detailed placement and actions of circuit breakers and switches in distribution networks. Based on fictitious fault flows, strategies for tripping circuit breakers to cut fault current, operating switches to isolate the fault and processing post-fault network reconfiguration are linearly modeled as constraints. Besides, this model can be easily embedded into operating and planning models of distribution networks. Case studies on 54-node, 85-node, 137-node and 417-node distribution networks show the scalability and efficiency of the proposed model.
- 17 March 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 35 (5) , 3991-4004
Optimization Model-Based Reliability Assessment for Distribution Networks Considering Detailed Placement of Circuit Breakers and Switches
Requirements of economic and reliability criteria are often stressed simultaneously in operating and planning models for distribution systems. However, conventional reliability evaluation algorithms are hard to be integrated to these optimization models analytically. Recently, several optimization model-based reliability assessment methods have been proposed, which can be embedded into such models. However, the detailed placement and actions of circuit breakers and switches are ignored or oversimplified in these methods, leading to an inconsistency with the real world situation. Thus, we propose a new optimization model-based reliability assessment method that fully considers detailed placement and actions of circuit breakers and switches in distribution networks. Based on fictitious fault flows, strategies for tripping circuit breakers to cut fault current, operating switches to isolate the fault and processing post-fault network reconfiguration are linearly modeled as constraints. Besides, this model can be easily embedded into operating and planning models of distribution networks. Case studies on 54-node, 85-node, 137-node and 417-node distribution networks show the scalability and efficiency of the proposed model.
- Top Cited Papers
- 21 August 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 35 (2) , 1457-1467
Analytical Reliability Assessment Method for Complex Distribution Networks Considering Post-Fault Network Reconfiguration
Analytical methods for evaluating the reliability of simple and radial distribution networks have been well established. Since these analytical methods cannot consider post-fault load transfer between feeders, the reliability indices are significantly underestimated for mesh-constructed distribution networks. To accommodate various application scenarios, Monte-Carlo simulations are widely used for complex distribution networks and heavy computation burden is involved. In this paper, we propose a novel linear programming model which includes precisely assessing reliability and considers post-fault network reconfiguration strategies involving operational constraints. Moreover, this model also can formulate the influences of demand variations, uncertainty of distributed generations and protection failures on the reliability indices. Numerical simulations show that the proposed model yields the same results as the simulation-based algorithm. Specifically, the system average interruption duration indices are reduced when considering post-fault network reconfiguration strategies in all tested systems. Moreover, the proposed model is suitable for inclusion in reliability-constrained operational and planning optimization models for power distribution systems.
- 21 August 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 35 (2) , 1457-1467
Top Cited PapersAnalytical Reliability Assessment Method for Complex Distribution Networks Considering Post-Fault Network Reconfiguration
Analytical methods for evaluating the reliability of simple and radial distribution networks have been well established. Since these analytical methods cannot consider post-fault load transfer between feeders, the reliability indices are significantly underestimated for mesh-constructed distribution networks. To accommodate various application scenarios, Monte-Carlo simulations are widely used for complex distribution networks and heavy computation burden is involved. In this paper, we propose a novel linear programming model which includes precisely assessing reliability and considers post-fault network reconfiguration strategies involving operational constraints. Moreover, this model also can formulate the influences of demand variations, uncertainty of distributed generations and protection failures on the reliability indices. Numerical simulations show that the proposed model yields the same results as the simulation-based algorithm. Specifically, the system average interruption duration indices are reduced when considering post-fault network reconfiguration strategies in all tested systems. Moreover, the proposed model is suitable for inclusion in reliability-constrained operational and planning optimization models for power distribution systems.
- 22 May 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 11 (3) , 1118-1127
Joint Commitment of Generation Units and Heat Exchange Stations for Combined Heat and Power Systems
The combined heat and power (CHP) system introduces a higher efficiency in energy conversion and consumption. By exploiting the flexibility of district heating systems (DHSs), the joint operation of heat and power systems can improve the overall system flexibility, reduce renewable energy curtailment, and decrease system operating costs. In a typical district heating system, the heat exchange station (HES) is a key component which can help adjust the heat distribution among heat loads. In this paper, a joint hourly commitment of generation units and heat exchange stations is proposed. The district heating system model is presented in which thermal storage and inertia of pipelines and heat loads are characterized. In addition, an approximation is applied to the heat exchange station model, making the overall joint commitment problem tractable. Numerical simulations are carried out, which demonstrate that the proposed joint commitment solution can introduce additional benefits in reducing wind power curtailment and system operation cost.
- 22 May 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 11 (3) , 1118-1127
Joint Commitment of Generation Units and Heat Exchange Stations for Combined Heat and Power Systems
The combined heat and power (CHP) system introduces a higher efficiency in energy conversion and consumption. By exploiting the flexibility of district heating systems (DHSs), the joint operation of heat and power systems can improve the overall system flexibility, reduce renewable energy curtailment, and decrease system operating costs. In a typical district heating system, the heat exchange station (HES) is a key component which can help adjust the heat distribution among heat loads. In this paper, a joint hourly commitment of generation units and heat exchange stations is proposed. The district heating system model is presented in which thermal storage and inertia of pipelines and heat loads are characterized. In addition, an approximation is applied to the heat exchange station model, making the overall joint commitment problem tractable. Numerical simulations are carried out, which demonstrate that the proposed joint commitment solution can introduce additional benefits in reducing wind power curtailment and system operation cost.
- 17 August 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 10 (3) , 1319-1329
Robust Voltage Control Strategy for Hybrid AC/DC Sending-Side Systems to Prevent Cascading Trip Failures
Line-commutated-converter-based high-voltage- direct-current (LCC-HVDC) is an important and attractive method of transmitting large-scale integrated wind power. However, the contin-gencies induced by LCC-HVDCs and nearby areas usually lead to an overvoltage problem in hybrid AC/DC sending-side systems, which may result in severe cascading trip problems. Therefore, a robust voltage control strategy for hybrid AC/DC sending-side systems is proposed in this paper to prevent cascading trip failures and accommodate more wind power. The proposed strategies address the voltage control complexity of LCC-HVDCs and converter stations, appropriately formulate the different locally fast-response switching strategies of filter banks and different control modes of the LCC-HVDCs in the automatic voltage control (AVC) system. To compute the formulated problem efficiently and quickly for online application, a method of transforming the robust optimization problem and the Benders decomposition method are introduced. Based on case studies, the computational efficiency and accuracy of the proposed method are determined using operational data for the TianShan District in the Northwest China Power Grid.
- 17 August 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 10 (3) , 1319-1329
Robust Voltage Control Strategy for Hybrid AC/DC Sending-Side Systems to Prevent Cascading Trip Failures
Line-commutated-converter-based high-voltage- direct-current (LCC-HVDC) is an important and attractive method of transmitting large-scale integrated wind power. However, the contin-gencies induced by LCC-HVDCs and nearby areas usually lead to an overvoltage problem in hybrid AC/DC sending-side systems, which may result in severe cascading trip problems. Therefore, a robust voltage control strategy for hybrid AC/DC sending-side systems is proposed in this paper to prevent cascading trip failures and accommodate more wind power. The proposed strategies address the voltage control complexity of LCC-HVDCs and converter stations, appropriately formulate the different locally fast-response switching strategies of filter banks and different control modes of the LCC-HVDCs in the automatic voltage control (AVC) system. To compute the formulated problem efficiently and quickly for online application, a method of transforming the robust optimization problem and the Benders decomposition method are introduced. Based on case studies, the computational efficiency and accuracy of the proposed method are determined using operational data for the TianShan District in the Northwest China Power Grid.
- 19 September 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 9 (2) , 651-663
Robust Capacity Assessment of Distributed Generation in Unbalanced Distribution Networks Incorporating ANM Techniques
To settle a large-scale integration of renewable distributed generations (DGs), it requires to assess the maximal DG hosting capacity of active distribution networks (ADNs). For fully exploiting the ability of ADNs to accommodate DG, this paper proposes a robust comprehensive DG capacity assessment method considering three-phase power flow modelling and active network management (ANM) techniques. The two-stage adjustable robust optimization is employed to tackle the uncertainties of load demands and DG outputs. With our method, system planners can obtain the maximum penetration level of DGs with their optimal sizing and sitting decisions. Meanwhile, the robust optimal ANM schemes can be generated for each operation time period, including network reconfiguration, on-load-tap-changers regulation, and reactive power compensation. In addition, a three-step optimization algorithm is proposed to enhance the accuracy of DG capacity assessment results. The optimality and robustness of our method are validated via numerical tests on an unbalanced IEEE 33-bus distribution system.
- 19 September 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 9 (2) , 651-663
Robust Capacity Assessment of Distributed Generation in Unbalanced Distribution Networks Incorporating ANM Techniques
To settle a large-scale integration of renewable distributed generations (DGs), it requires to assess the maximal DG hosting capacity of active distribution networks (ADNs). For fully exploiting the ability of ADNs to accommodate DG, this paper proposes a robust comprehensive DG capacity assessment method considering three-phase power flow modelling and active network management (ANM) techniques. The two-stage adjustable robust optimization is employed to tackle the uncertainties of load demands and DG outputs. With our method, system planners can obtain the maximum penetration level of DGs with their optimal sizing and sitting decisions. Meanwhile, the robust optimal ANM schemes can be generated for each operation time period, including network reconfiguration, on-load-tap-changers regulation, and reactive power compensation. In addition, a three-step optimization algorithm is proposed to enhance the accuracy of DG capacity assessment results. The optimality and robustness of our method are validated via numerical tests on an unbalanced IEEE 33-bus distribution system.
- Open Access
- 1 January 2017
- Published by Institution of Engineering and Technology (IET) in The Journal of Engineering
- Vol. 2017 (13) , 812-815
Discussion of positive fraction vector fitting for frequency‐dependent network equivalents
The positive fraction vector fitting (PFVF) is a special method to guarantee the passivity of rational models such as frequency‐dependent network equivalents. It involves constraints that enforce each fraction of the rational model to be passive, which are much stricter than the original passive requirements. PFVF lacks theoretical foundation but works well in practise. This study explains the rationality of PFVF by revealing important features of rational models that the complex‐pole fractions corresponding to dominant resonance peaks can be adjusted passive through a minor change. The numerical case corroborates the theoretical analysis.
- 1 January 2017
- Published by Institution of Engineering and Technology (IET) in The Journal of Engineering
- Vol. 2017 (13) , 812-815
Open AccessDiscussion of positive fraction vector fitting for frequency‐dependent network equivalents
The positive fraction vector fitting (PFVF) is a special method to guarantee the passivity of rational models such as frequency‐dependent network equivalents. It involves constraints that enforce each fraction of the rational model to be passive, which are much stricter than the original passive requirements. PFVF lacks theoretical foundation but works well in practise. This study explains the rationality of PFVF by revealing important features of rational models that the complex‐pole fractions corresponding to dominant resonance peaks can be adjusted passive through a minor change. The numerical case corroborates the theoretical analysis.
- Open Access
- 22 July 2016
- Published by Springer Nature in Journal of Modern Power Systems and Clean Energy
- Vol. 4 (4) , 680-689
Transient outage model considering corrective and preventive maintenance
- 22 July 2016
- Published by Springer Nature in Journal of Modern Power Systems and Clean Energy
- Vol. 4 (4) , 680-689
Open AccessTransient outage model considering corrective and preventive maintenance
- Open Access
- 23 March 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 7 (3) , 1306-1316
Autonomous Voltage Security Regions to Prevent Cascading Trip Faults in Wind Turbine Generators
Cascading trip faults in large-scale wind power centralized integration areas bring new challenges to the secure operation of power systems. In order to deal with the complexity of voltage security regions and the computation difficulty, this paper proposes an autonomous voltage security region (AVSR) for each wind farm and the point of common coupling (PCC) substation, whose voltage can be controlled in a decoupled way. The computation of the AVSR can be completed using a stepwise search method exchanging voltage and power information between the control center and the wind farms. At each wind farm, an AVSR is determined to guarantee the normal operation of each wind turbine generator (WTG), while in the control center, each region is designed in order to guarantee secure operation both under normal conditions and after an N-1 contingency. A real system in Northern China was used to carry out case studies to verify the effectiveness of the AVSRs proposed, and good performance was demonstrated using the Monte Carlo method.
- 23 March 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 7 (3) , 1306-1316
Open AccessAutonomous Voltage Security Regions to Prevent Cascading Trip Faults in Wind Turbine Generators
Cascading trip faults in large-scale wind power centralized integration areas bring new challenges to the secure operation of power systems. In order to deal with the complexity of voltage security regions and the computation difficulty, this paper proposes an autonomous voltage security region (AVSR) for each wind farm and the point of common coupling (PCC) substation, whose voltage can be controlled in a decoupled way. The computation of the AVSR can be completed using a stepwise search method exchanging voltage and power information between the control center and the wind farms. At each wind farm, an AVSR is determined to guarantee the normal operation of each wind turbine generator (WTG), while in the control center, each region is designed in order to guarantee secure operation both under normal conditions and after an N-1 contingency. A real system in Northern China was used to carry out case studies to verify the effectiveness of the AVSRs proposed, and good performance was demonstrated using the Monte Carlo method.