Zhuxiao Tian
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Zhuxiao Tian has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
Dongxiao Niu
North China Electric Power University
1 shared publication- Luyao Peng
School of Economics and Management, North China Electric Power University, Beijing 102206, China
1 shared publication - Shipeng Zheng
School of Economics and Management, North China Electric Power University, Beijing 102206, China
1 shared publication Shiping Geng
North China Electric Power University
1 shared publication- Shiping Geng
North China Electric Power University
1 shared publication - Xiaomin Xu
School of Economics and Management, North China Electric Power University, Beijing 102206, China
1 shared publication
Latest Publications
- Open Access
- 13 December 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (24) , 13746
Research on Substation Project Cost Prediction Based on Sparrow Search Algorithm Optimized BP Neural Network
The prediction of power grid engineering cost is the basis of fine management of power grid engineering, and accurate prediction of substation engineering cost can effectively ensure the fine operation of engineering funds. With the continuous expansion of the engineering system, the influencing factors and data dimensions of substation project investment are gradually diversified and complex, which further increases the uncertainty and complexity of substation project cost. Based on the concept of substation engineering data space, this paper investigates the influencing factors and constructs the static total investment intelligent prediction model of substation engineering. The emerging swarm intelligence algorithm, sparrow search algorithm (SSA), is used to optimize the parameters of the BP neural network to improve the prediction accuracy and convergence speed of neural network. In order to test the validity of the model, an example analysis is carried out based on the data of a provincial substation project. It was found that the SSA-BP can effectively improve the prediction accuracy and provide new methods and approaches for practical application and research.
- 13 December 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (24) , 13746
Open AccessResearch on Substation Project Cost Prediction Based on Sparrow Search Algorithm Optimized BP Neural Network
The prediction of power grid engineering cost is the basis of fine management of power grid engineering, and accurate prediction of substation engineering cost can effectively ensure the fine operation of engineering funds. With the continuous expansion of the engineering system, the influencing factors and data dimensions of substation project investment are gradually diversified and complex, which further increases the uncertainty and complexity of substation project cost. Based on the concept of substation engineering data space, this paper investigates the influencing factors and constructs the static total investment intelligent prediction model of substation engineering. The emerging swarm intelligence algorithm, sparrow search algorithm (SSA), is used to optimize the parameters of the BP neural network to improve the prediction accuracy and convergence speed of neural network. In order to test the validity of the model, an example analysis is carried out based on the data of a provincial substation project. It was found that the SSA-BP can effectively improve the prediction accuracy and provide new methods and approaches for practical application and research.
- 10 March 2021
- Published by Springer Nature
- p. 84-91
Prediction of Time-Delay GM (1, N) Cost Trend of Power Grid Engineering Based on Macro-environmental Impact
- 10 March 2021
- Published by Springer Nature
- p. 84-91
Prediction of Time-Delay GM (1, N) Cost Trend of Power Grid Engineering Based on Macro-environmental Impact