Luiz Augusto G. Franzese
Research Subjects
Research Interests
Luiz Augusto G. Franzese has a total of 76 co-authors. Here are the top co-authors by number of shared publications:
Marcelo Moretti Fioroni
Paragon Decision Science, Rua Arminda, 93 - 5th floor, Vila Olímpia, São Paulo - SP, 04551-010, BRAZIL
11 shared publications- Isac Reis Santana
Paragon Decision Science, Rua Arminda, 93 - 5th floor, Vila Olímpia, São Paulo - SP, 04551-010, BRAZIL
5 shared publications M.M. Fioroni
3 shared publications- Rui Carlos Botter
Department of Naval and Ocean Engineering, University of São Paulo, São Paulo 05508-010, Brazil
3 shared publications - Caio Eduardo Zanin
Paragon Tecnologia R. Clodomiro Amazonas, 1435 - 50 and. São Paulo, SP 04537 012, BRAZIL
2 shared publications - Daniel de Oliveira Mota
Universidade de São Paulo, Brasil
2 shared publications
Latest Publications
- 31 March 2021
- Published by Emerald Publishing in Journal of Humanitarian Logistics and Supply Chain Management
- Vol. 11 (3) , 481-492
Managing funerary systems in the pandemic: lessons learned and an application of a scenario simulation in São Paulo City, Brazil
Purpose: This study, a practice forum article, aims to presents the lessons learned and the development of a discrete event simulation model to support the funerary system management of São Paulo City, Brazil, during the COVID-19 pandemic.Design/methodology/approach: A discrete event simulation model was developed by the authors as soon as the pandemic affected the city of São Paulo, Brazil. Based on the model, several scenarios with varying minimum, median and peak demands (i.e. the number of deaths) were tested and evaluated. The lessons learned from the scenario analysis and implementation of the decision-making of the city government of São Paulo are discussed in this article.Findings: The lessons learned about the coordination, inventory management and other operational characteristics in funerary logistics during the pandemic are shared with a model, which quantifies the demand for vehicles, coffins, graves and teams in the cemeteries in different simulated scenarios.Practical implications: The São Paulo State Civil Defense used this information during the pandemic to prepare the funerary system of the municipality.Social implications: The study presents methods to mitigate the sanitary, environmental and psychosocial problems related to the funerary system.Originality/value: Studies on funerary systems are scarce. This study presents the results that supported the dimensioning of the funerary system during the pandemic and operational lessons about the logistics to support decision-making in future events.
- 31 March 2021
- Published by Emerald Publishing in Journal of Humanitarian Logistics and Supply Chain Management
- Vol. 11 (3) , 481-492
Managing funerary systems in the pandemic: lessons learned and an application of a scenario simulation in São Paulo City, Brazil
Purpose: This study, a practice forum article, aims to presents the lessons learned and the development of a discrete event simulation model to support the funerary system management of São Paulo City, Brazil, during the COVID-19 pandemic.Design/methodology/approach: A discrete event simulation model was developed by the authors as soon as the pandemic affected the city of São Paulo, Brazil. Based on the model, several scenarios with varying minimum, median and peak demands (i.e. the number of deaths) were tested and evaluated. The lessons learned from the scenario analysis and implementation of the decision-making of the city government of São Paulo are discussed in this article.Findings: The lessons learned about the coordination, inventory management and other operational characteristics in funerary logistics during the pandemic are shared with a model, which quantifies the demand for vehicles, coffins, graves and teams in the cemeteries in different simulated scenarios.Practical implications: The São Paulo State Civil Defense used this information during the pandemic to prepare the funerary system of the municipality.Social implications: The study presents methods to mitigate the sanitary, environmental and psychosocial problems related to the funerary system.Originality/value: Studies on funerary systems are scarce. This study presents the results that supported the dimensioning of the funerary system during the pandemic and operational lessons about the logistics to support decision-making in future events.
- 1 December 2015
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1936-1947
From farm to port: Simulation of the grain logistics in Brazil
This paper presents a study about soybean and corn multimodal transportation and storage, from farm to port, considering the resources, locations and interferences. The harvest seasonality, climatic changes, road conditions, truck availability and warehouse options configure a very complex system with dozen of options. A simulation model was developed to evaluate and discover the better option under some future expected scenarios. Train, barges and ships were also considered as part of the logistic process. A localization study was made to feed the model with the best warehouse locations from the logistic point of view, and the model helped to choose which locations should be adopted. The simulation considering the complete chain provided a very precise and insightful answer about the system performance, guiding the future investments in the process.
- 1 December 2015
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1936-1947
From farm to port: Simulation of the grain logistics in Brazil
This paper presents a study about soybean and corn multimodal transportation and storage, from farm to port, considering the resources, locations and interferences. The harvest seasonality, climatic changes, road conditions, truck availability and warehouse options configure a very complex system with dozen of options. A simulation model was developed to evaluate and discover the better option under some future expected scenarios. Train, barges and ships were also considered as part of the logistic process. A localization study was made to feed the model with the best warehouse locations from the logistic point of view, and the model helped to choose which locations should be adopted. The simulation considering the complete chain provided a very precise and insightful answer about the system performance, guiding the future investments in the process.
- Open Access
- 1 December 2014
- Published by FapUNIFESP (SciELO) in Rem: Revista Escola de Minas
- Vol. 67 (4) , 447-454
Logistic evaluation of an underground mine using simulation
This paper describes a logistic study about an underground gold mine, belonging to AngloGold Ashanti, where four different layout options could be applied to the tunnels, and also different transportation strategies. Each evaluated layout had its own configuration for shaft and truck fleets. The study was made individually for each year of the mine operation life, determining the necessary transportation capacity to achieve the planned production for that year. Due to the very restrictive traffic options in the tunnels, a framework was developed to represent the tunnels and traffic rules in a discrete-event simulation model. The results pointed the scenario with the lowest necessary transportation capacity to achieve the planned production.
- 1 December 2014
- Published by FapUNIFESP (SciELO) in Rem: Revista Escola de Minas
- Vol. 67 (4) , 447-454
Open AccessLogistic evaluation of an underground mine using simulation
This paper describes a logistic study about an underground gold mine, belonging to AngloGold Ashanti, where four different layout options could be applied to the tunnels, and also different transportation strategies. Each evaluated layout had its own configuration for shaft and truck fleets. The study was made individually for each year of the mine operation life, determining the necessary transportation capacity to achieve the planned production for that year. Due to the very restrictive traffic options in the tunnels, a framework was developed to represent the tunnels and traffic rules in a discrete-event simulation model. The results pointed the scenario with the lowest necessary transportation capacity to achieve the planned production.
- Open Access
- 1 December 2014
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1855-1865
Logistic evaluation of an underground mine using simulation
This paper describes a logistic study about an underground gold mine, belonging to AngloGold Ashanti, where four different layout options could be applied to the tunnels, and also different transportation strategies. Each evaluated layout had its own configuration for shaft and truck fleet. The study was made individually for each year of the mine operation life, determining the necessary transportation capacity to achieve the planned production at that year. Due to the very restrictive traffic options in the tunnels, a framework was developed to represent the tunnels and traffic rules in a discrete-event simulation model. The results identified the scenario with the lowest necessary transportation capacity to achieve the planned production.
- 1 December 2014
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1855-1865
Open AccessLogistic evaluation of an underground mine using simulation
This paper describes a logistic study about an underground gold mine, belonging to AngloGold Ashanti, where four different layout options could be applied to the tunnels, and also different transportation strategies. Each evaluated layout had its own configuration for shaft and truck fleet. The study was made individually for each year of the mine operation life, determining the necessary transportation capacity to achieve the planned production at that year. Due to the very restrictive traffic options in the tunnels, a framework was developed to represent the tunnels and traffic rules in a discrete-event simulation model. The results identified the scenario with the lowest necessary transportation capacity to achieve the planned production.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 2854-2865
Construction planning simulation at GRU airport
Many complex construction schedules are still being planned nowadays with deterministic project schedule tools such as MS Project, with deterministic estimates, lack of focus on event conflicts and no queuing estimates. This paper presents a discrete-event simulation approach for a soil replacement project of great importance to the Brazilian government. This was part of the expansion work at GRU Airport, the greatest and most important of the country, and was being carried by the Brazilian Army. The airport should be ready for the increasing demand expected for World Cup in 2014 and Olympics in 2016. The study started with the original deterministic schedule, and considered several external factors, like traffic, rain seasons and providers capacity. After evaluating many scenarios and identifying some bottlenecks, the best scenario was found, with a due date sooner than initially planned.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 2854-2865
Construction planning simulation at GRU airport
Many complex construction schedules are still being planned nowadays with deterministic project schedule tools such as MS Project, with deterministic estimates, lack of focus on event conflicts and no queuing estimates. This paper presents a discrete-event simulation approach for a soil replacement project of great importance to the Brazilian government. This was part of the expansion work at GRU Airport, the greatest and most important of the country, and was being carried by the Brazilian Army. The airport should be ready for the increasing demand expected for World Cup in 2014 and Olympics in 2016. The study started with the original deterministic schedule, and considered several external factors, like traffic, rain seasons and providers capacity. After evaluating many scenarios and identifying some bottlenecks, the best scenario was found, with a due date sooner than initially planned.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 3510-3521
Modeling the sugar cane logistics from farm to mill
A continuous and discrete system gets distinct approach from modelers, since both have very particular characteristics. Some simulation tools are specialized in one system or another, but the great majority focuses on discrete modeling. However, there are many hybrid systems where a continuous process interfaces with discrete. Despite being possible to model both systems with particular modeling tools, they have to be properly connected. An example of hybrid system is the ethanol production chain, where the transport of the raw material sugar cane has important interactions between the main components of the chain, where there is exchange of equipment, transport and interface of continuous systems with discrete, and vice versa. This study presents the algorithms and techniques used to model the logistics operations of the Alcohol/Sugar producer Raízen, developed using the SIMIO simulation tool.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 3510-3521
Modeling the sugar cane logistics from farm to mill
A continuous and discrete system gets distinct approach from modelers, since both have very particular characteristics. Some simulation tools are specialized in one system or another, but the great majority focuses on discrete modeling. However, there are many hybrid systems where a continuous process interfaces with discrete. Despite being possible to model both systems with particular modeling tools, they have to be properly connected. An example of hybrid system is the ethanol production chain, where the transport of the raw material sugar cane has important interactions between the main components of the chain, where there is exchange of equipment, transport and interface of continuous systems with discrete, and vice versa. This study presents the algorithms and techniques used to model the logistics operations of the Alcohol/Sugar producer Raízen, developed using the SIMIO simulation tool.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3533-3543
Signal-oriented railroad simulation
Railroad simulation is always challenging to modelers, since this kind of system has physical restrictions that cannot be ignored or deeply simplified without losing precision. The great difficulty on modeling the railroad behavior lies on the train movement, specially on single lines. This paper describes the experience of modeling a railway line used for coal transportation in Colombia, used by one of the largest open-pit coal mining companies in the world, and the most important in the country: Carbones del Cerrejón. After experiencing and analyzing different options, the model was built with a signal-oriented decision process, where all train movements are allowed or restricted by the line signals. This approach made possible to represent every specific decision regarding the train movements in different sections of the line, using a simple local, instead of a global complex intelligence. It has proven to be very precise, fitting the real system with small error, and allowed several experiments to support decisions at Cerrejón.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3533-3543
Signal-oriented railroad simulation
Railroad simulation is always challenging to modelers, since this kind of system has physical restrictions that cannot be ignored or deeply simplified without losing precision. The great difficulty on modeling the railroad behavior lies on the train movement, specially on single lines. This paper describes the experience of modeling a railway line used for coal transportation in Colombia, used by one of the largest open-pit coal mining companies in the world, and the most important in the country: Carbones del Cerrejón. After experiencing and analyzing different options, the model was built with a signal-oriented decision process, where all train movements are allowed or restricted by the line signals. This approach made possible to represent every specific decision regarding the train movements in different sections of the line, using a simple local, instead of a global complex intelligence. It has proven to be very precise, fitting the real system with small error, and allowed several experiments to support decisions at Cerrejón.
- 1 December 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Maintenance framework to address the interaction of components using simulation
Maintenance has been a constant concern in industries. This paper intends to address the maintenance plan in a complex system. Based on the beneficiation plant of Minas Rio Project, the model proposed takes into consideration the consequences of the maintenance schedule in the whole production. In this production chain, a complex structure called “State Control” is used to simulate the information flow throughout the equipment. The visibility of the complete system under a maintenance perspective allows the decision maker to propose plans, test them and minimize losses, generating new strategies to the production and maintenance system. The application of Arena Professional (Distributed by Rockwell Automation) to develop the project allows the identification of bottlenecks, and expected production per year. The results obtained in the studied scenarios allowed identifying the bottlenecks and change the strategies of maintenance, to enable the beneficiation plant achieve the nominal productivity.
- 1 December 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Maintenance framework to address the interaction of components using simulation
Maintenance has been a constant concern in industries. This paper intends to address the maintenance plan in a complex system. Based on the beneficiation plant of Minas Rio Project, the model proposed takes into consideration the consequences of the maintenance schedule in the whole production. In this production chain, a complex structure called “State Control” is used to simulate the information flow throughout the equipment. The visibility of the complete system under a maintenance perspective allows the decision maker to propose plans, test them and minimize losses, generating new strategies to the production and maintenance system. The application of Arena Professional (Distributed by Rockwell Automation) to develop the project allows the identification of bottlenecks, and expected production per year. The results obtained in the studied scenarios allowed identifying the bottlenecks and change the strategies of maintenance, to enable the beneficiation plant achieve the nominal productivity.
- 1 December 2010
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 1990-1997
Matching production planning and ship arrival scheduling by simulation
There are several challenges involving the representation of an ore loading port system using a simulation package. This kind of port handles bulk material, much more adequately represented by continuous flow than discrete flow, as in opposite to the case of a container-handling port. This paper addresses specifically the impact of meeting product mix requirements in the delivery and the ship arrival schedules. A method to model this feature is presented. Also, the modeling approach of these aspects is presented, and the experimentation in the case of Porto do Açu, located at Rio de Janeiro, is performed to check the method's efficiency.
- 1 December 2010
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 1990-1997
Matching production planning and ship arrival scheduling by simulation
There are several challenges involving the representation of an ore loading port system using a simulation package. This kind of port handles bulk material, much more adequately represented by continuous flow than discrete flow, as in opposite to the case of a container-handling port. This paper addresses specifically the impact of meeting product mix requirements in the delivery and the ship arrival schedules. A method to model this feature is presented. Also, the modeling approach of these aspects is presented, and the experimentation in the case of Porto do Açu, located at Rio de Janeiro, is performed to check the method's efficiency.
- 1 December 2009
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 3055-3065
Operational simulation model of the raw material handling in an integrated steel making plant
This article is focused on the design and implementation of an operational simulation model (OSM) of the handling of raw material in an integrated steel making plant, considering operations of receiving, unloading, stocking, handling and supplying the different raw materials related to the production process with an operational perspective. The aim of this focus is to help in the decision making of the team controlling the ore inventory. Based on the methodological structure developed by Coelho (2008), this OSM showed that most of the valid concepts for simulations with a strategic focus do not present relevance from an operational point of view. The advantage of the OSM is the fact that it is not random or stochastic, but deterministic, while exhibiting behaviour considered satisfactory by management and steelyard team alike.
- 1 December 2009
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 3055-3065
Operational simulation model of the raw material handling in an integrated steel making plant
This article is focused on the design and implementation of an operational simulation model (OSM) of the handling of raw material in an integrated steel making plant, considering operations of receiving, unloading, stocking, handling and supplying the different raw materials related to the production process with an operational perspective. The aim of this focus is to help in the decision making of the team controlling the ore inventory. Based on the methodological structure developed by Coelho (2008), this OSM showed that most of the valid concepts for simulations with a strategic focus do not present relevance from an operational point of view. The advantage of the OSM is the fact that it is not random or stochastic, but deterministic, while exhibiting behaviour considered satisfactory by management and steelyard team alike.