DTDeni Ahmad Taufik

Deni Ahmad Taufik

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Deni Ahmad Taufik has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Value Stream Mapping (VSM) Implementation as an Effort to Reduce Delays in the Procurement Process at PT DI

    by Deni Ahmad Taufik, Indra Maulana Fahturizal

    PT DI is an oil and gas company, to support its production a good procurement process is needed. Procurement is an activity to get goods and services in a transparent, effective, and efficient. Based on data in 2017, there is 148 procurement with a value of less than 2.5 billion carried out by PT DI, from that data there are 43% of the procurement completed exceeding the predetermined initial target. Based on data in 2017, the procurement of A4100000121 has the highest delay rate of 32 days, therefore it is necessary to identify waste as an effort to reduce the time delay. The method used is Value Stream Mapping, this method is used to identify processes that contain waste so that existing waste can be removed. Based on the results of the study there was a decrease in time between Current State VSM and Future State VSM with a total time at Current State VSM of 39425 minutes and Future State VSM of 23085 minutes so that the time was decreased by 16340 minutes


  • Open Access

    Integrasi Linear Regression dan Aggregate Planning untuk Perencanaan dan Pengendalian Produksi Leaf Spring Hino OW 190/200 di Industri Komponen Otomotif

    by Deni Ahmad Taufik, Indra Setiawan, Muhammad Wahid, Abdul Rochim, Muhammad Tosin

    Production planning and control in a manufacturing company involves all production activities from raw material requirements to finished products. The Jakarta Automotive Components Industry is engaged in manufacturing which produces leaf spring products that are sent to several regular customers, namely the Automotive Assembly Industry. Leaf spring Hino OW 190/200 is the type of spring ordered and shipped to PT. HMMI. Based on data for the January-December 2019 period, the demand for Hino OW 190/200 leaf spring has fluctuated quite significantly. The purpose of this study was to plan and control the production process of Leaf Spring Hino OW 190/200. Forecasting for the next 12 periods is based on demand plots from the previous 12 periods, calculating the Aggregate production plan, determining the Master Production Schedule (MPS), calculating raw material requirements using the Hybrid and Lot for Lot methods. The results showed that to support the smooth production, it can be seen that the production planning for forecasting calculations using the Linear Regression method generates a model Y=319,575+3,723X. Calculation of the need for main raw materials and components in 2020 uses the Hybrid and Lot for Lot method, which is 256,182.88 kg, much smaller than the company's calculations based on 2019 data, namely 259,827.40 kg.


  • Open Access

    Balanced Scorecard: Literature Review and Implementation in Organization

    by Deni Ahmad Taufik, Humiras Hardi Purba, Hasbullah Hasbullah

    The balanced scorecard is a formal management technique for developing, implementing, and managing business strategies. It isn't easy to ascertain the technique's success. Most of the literature on its implementation is put out by those with a vested interest in its success as a commercial product. Much has been written about barriers to strategy implementation but not specifically to implementing a balanced scorecard. The literature review in this paper shows that studies on BSC implementation in corporate organizations focus on improving organizational performance, assisting in decision making, assisting in component selection, evaluating production and learning and sustainable growth. This paper provides benefits for further research to add to the literature and understanding of the implementation of the Balanced Scorecard in any organization.


  • Open Access

    PDCA Cycle Method implementation in Industries: A Systematic Literature Review

    by Deni Ahmad Taufik

    The industry's development increasingly makes businesses competitive by increasing technical knowledge and improving systems, both internally and externally. The PDCA (Plan, Do, Check, Action) cycle is a quality management system used as a continuous improvement tool widely used in industries. The PDCA is a continuous improvement tool that is widely used in industries. The PDCA cycle begins with small to check possible effects on systems and eventually progresses to larger and more specific improvements. The implementation of the PDCA method results in solving the problems of qualitative and quantitative data problems that have been widely applied in industries for continuous improvement and as a work pattern in improving a process or system in an organization and increasing productivity. The methodology used in this research is the literature review research paper was published in 2010-2020. The literature review describes the relationship between thinking and gaps in theoretical and practical thinking about applying the PDCA method and the successful implementation in industries as a contribution to further research.