Deependra Neupane
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Deependra Neupane has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Sagar Kafle
Department of Agricultural Engineering, Purwanchal Campus, Institute of Engineering, Tribhuvan University, Dharan, Nepal
3 shared publications Dae Hyun Kim
2 shared publications- Nawaraj Poudel
Tribhuvan University Dharan Department of Electrical Engineering, Purwanchal Campus, Institute of Engineering Sub-metropolitan City, Ward no. 8, 56700, Sunsari District, Koshi Province, Nepal
2 shared publications - Nawraj Bhattarai
Department of Mechanical and Aerospace Engineering, Pulchowk Campus, Institute of Engineering, Tribhuvan University, Lalitpur 44600, Nepal
2 shared publications - Samundra Gurung
Department of Electrical and Electronics Engineering, Kathmandu University, Dhulikhel, NEPAL
2 shared publications - Bhola Paudel
Future Regions Research Centre, Ararat Jobs and Technology Precinct, Federation University, Mount Helen, Australia
1 shared publication
Latest Publications
- Open Access
- 3 December 2024
- Published by IntechOpen
Small-Signal Stability Analysis of Virtual Impedance Based Parallel Inverters
Maintaining voltage-frequency levels and balancing active and reactive power are significant issues in parallel inverters used in standalone electrical systems. Therefore, modelling and analysing parallel inverters has become crucial in developing appropriate control mechanisms to mitigate power-sharing and voltage-frequency issues in these systems. This study has developed a non-linear model of a parallel inverter consisting of a conventional Proportional Integral (PI) control with virtual impedance control. The equation system was linearised for zero initial conditions and steady-state conditions. The effect of load changes on the system was also studied. Additionally, eigenvalue and frequency response analyses were performed. The results of the study show that the developed non-linear model matches the electrical simulation performed in Simulink. The frequency dynamics and voltage profile of the system were improved by using virtual impedance control. The system’s damping increased by 2% for the most dominant pole, and the reactive power sharing also increased.
- 3 December 2024
- Published by IntechOpen
Open AccessSmall-Signal Stability Analysis of Virtual Impedance Based Parallel Inverters
Maintaining voltage-frequency levels and balancing active and reactive power are significant issues in parallel inverters used in standalone electrical systems. Therefore, modelling and analysing parallel inverters has become crucial in developing appropriate control mechanisms to mitigate power-sharing and voltage-frequency issues in these systems. This study has developed a non-linear model of a parallel inverter consisting of a conventional Proportional Integral (PI) control with virtual impedance control. The equation system was linearised for zero initial conditions and steady-state conditions. The effect of load changes on the system was also studied. Additionally, eigenvalue and frequency response analyses were performed. The results of the study show that the developed non-linear model matches the electrical simulation performed in Simulink. The frequency dynamics and voltage profile of the system were improved by using virtual impedance control. The system’s damping increased by 2% for the most dominant pole, and the reactive power sharing also increased.
- Open Access
- 18 January 2024
- Published by Oxford University Press (OUP) in International Journal of Low-Carbon Technologies
- Vol. 19, 1315-1322
Optimal generation expansion planning model for solar PV generation on Run of River-based hydro-based power system using binary genetic algorithm
This paper presents a binary genetic algorithm approach developed to solve the optimal generation expansion planning problem for solar photo-voltaic (PV) based Run of River (ROR) hydro generation systems. The results show that the methodology effectively solves mixed-integer, constrained nonlinear generation expansion problems. The model is then used to optimize the generation expansion problem for the electricity grid in the eastern region of Nepal, considering the under construction and planned solar PV and ROR-based hydropower plants. The optimal problem is formulated to determine the optimal number, location and type of power plant to fulfill the demand for the electricity grid of the eastern zone grid of Nepal. Results show that the total generation from the optimal sites combining hydro and solar sites is found to be about 26% of that of total energy in the Nepalese grid. However, the total demand in the system under consideration for the year is about 1352 GWh. With eliminating line losses, a surplus generation of about 1377 GWh has been found. This surplus can be used as power pooling with neighboring countries. The system has a surplus during the wet season but needs to be improved during the dry season. Hence, appropriate policies can be formulated for power banking and pooling to balance the demand–supply in the system.
- 18 January 2024
- Published by Oxford University Press (OUP) in International Journal of Low-Carbon Technologies
- Vol. 19, 1315-1322
Open AccessOptimal generation expansion planning model for solar PV generation on Run of River-based hydro-based power system using binary genetic algorithm
This paper presents a binary genetic algorithm approach developed to solve the optimal generation expansion planning problem for solar photo-voltaic (PV) based Run of River (ROR) hydro generation systems. The results show that the methodology effectively solves mixed-integer, constrained nonlinear generation expansion problems. The model is then used to optimize the generation expansion problem for the electricity grid in the eastern region of Nepal, considering the under construction and planned solar PV and ROR-based hydropower plants. The optimal problem is formulated to determine the optimal number, location and type of power plant to fulfill the demand for the electricity grid of the eastern zone grid of Nepal. Results show that the total generation from the optimal sites combining hydro and solar sites is found to be about 26% of that of total energy in the Nepalese grid. However, the total demand in the system under consideration for the year is about 1352 GWh. With eliminating line losses, a surplus generation of about 1377 GWh has been found. This surplus can be used as power pooling with neighboring countries. The system has a surplus during the wet season but needs to be improved during the dry season. Hence, appropriate policies can be formulated for power banking and pooling to balance the demand–supply in the system.
- 28 July 2023
- Published by Taylor & Francis in Electric Power Components and Systems
- Vol. 52 (7) , 1022-1038
Small-Signal Stability Modeling, Sensitivity Analysis, and Parameter Optimization of Improved Virtual Synchronous Machine Based Standalone Inverter
- 28 July 2023
- Published by Taylor & Francis in Electric Power Components and Systems
- Vol. 52 (7) , 1022-1038
Small-Signal Stability Modeling, Sensitivity Analysis, and Parameter Optimization of Improved Virtual Synchronous Machine Based Standalone Inverter
- 19 August 2022
- Published by Springer Nature in Journal of Control, Automation and Electrical Systems
- Vol. 34 (1) , 166-176
Power Sharing in Solar PV: Microhydro Hybrid System Using Power Angle Control Strategy
- 19 August 2022
- Published by Springer Nature in Journal of Control, Automation and Electrical Systems
- Vol. 34 (1) , 166-176
Power Sharing in Solar PV: Microhydro Hybrid System Using Power Angle Control Strategy
- Open Access
- 19 January 2022
- Published by Springer Nature in Research Square
Power Management in Solar PV - Microhydro Hybrid System Using Power Angle Control Strategy with Syncronverter
The most crucial control challenge in the hybrid-system is the frequency stability, especially when they are in the face of load-generation imbalance and numerous uncertainties. In this paper, the Syncronverter (SV) based on a micro hydropower System (MHPS) is proposed to handle the intermittent power output of Solar Photo-voltaic (SPV). The standalone microgrid is modeled in the MATLAB/Simulink environment. The power control form SV is performed using Power Angle Control(PAC) method. Several case studies are performed, and the simulation results show the dynamics of appropriate sharing of power for both the linear and nonlinear loads by the hybrid system. Both the frequency and Total Harmonic Distortion (THD) of load voltage kept within the standard limits. The application of SV shows a quick and smooth synchronization with micro-hydro. The change in irradiance level has been appropriately managed by power-sharing with micro-hydro to save the system from frequency imbalance during low light conditions. The power has been shared by providing an appropriate load angle between sources based on the irradiance level available at the time. Moreover, the dynamic response of voltage, power, and frequency of the system due to the induction motor load has also been studied.
- 19 January 2022
- Published by Springer Nature in Research Square
Open AccessPower Management in Solar PV - Microhydro Hybrid System Using Power Angle Control Strategy with Syncronverter
The most crucial control challenge in the hybrid-system is the frequency stability, especially when they are in the face of load-generation imbalance and numerous uncertainties. In this paper, the Syncronverter (SV) based on a micro hydropower System (MHPS) is proposed to handle the intermittent power output of Solar Photo-voltaic (SPV). The standalone microgrid is modeled in the MATLAB/Simulink environment. The power control form SV is performed using Power Angle Control(PAC) method. Several case studies are performed, and the simulation results show the dynamics of appropriate sharing of power for both the linear and nonlinear loads by the hybrid system. Both the frequency and Total Harmonic Distortion (THD) of load voltage kept within the standard limits. The application of SV shows a quick and smooth synchronization with micro-hydro. The change in irradiance level has been appropriately managed by power-sharing with micro-hydro to save the system from frequency imbalance during low light conditions. The power has been shared by providing an appropriate load angle between sources based on the irradiance level available at the time. Moreover, the dynamic response of voltage, power, and frequency of the system due to the induction motor load has also been studied.
- 1 January 2022
- Published by Elsevier in Renewable Energy
- Vol. 181, 278-291
Solar and wind energy potential assessment at provincial level in Nepal: Geospatial and economic analysis
- 1 January 2022
- Published by Elsevier in Renewable Energy
- Vol. 181, 278-291
Solar and wind energy potential assessment at provincial level in Nepal: Geospatial and economic analysis
- Open Access
- 20 October 2021
- Published by Oxford University Press (OUP) in International Journal of Low-Carbon Technologies
- Vol. 16 (4) , 1479-1491
Optimal sizing and financial analysis of a stand-alone SPV-micro-hydropower hybrid system considering generation uncertainty
Stand-alone hybrid energy systems are an enticing option for electrification in remote areas in several aspects such as grid extension difficulty, economic feasibility and reliability. The use of existing micro-hydropower (MHP) with other renewable resources in rural areas has not been well studied. Moreover, it is challenging to use mathematical optimization algorithms for these kinds of real-world problems, so the derivative-free algorithm is highly sought. In this paper, a methodology has been proposed to perform the optimal sizing, financial and generation uncertainty analysis of solar photovoltaic (SPV) based on an MHP that is proposed to handle the intermittent power output of the SPV. The analysis is performed in two cases: using storage and without storage. The optimal sizing is performed using the least present value cost and reliability constraint using different derivative-free algorithms. The storage-based hybrid system has been found to generate reliable electricity at minimal cost than without a storage-based one. This study would be helpful to propose electrification and existing micro-hydro reinforcement policies to provide reliable electricity in rural areas.
- 20 October 2021
- Published by Oxford University Press (OUP) in International Journal of Low-Carbon Technologies
- Vol. 16 (4) , 1479-1491
Open AccessOptimal sizing and financial analysis of a stand-alone SPV-micro-hydropower hybrid system considering generation uncertainty
Stand-alone hybrid energy systems are an enticing option for electrification in remote areas in several aspects such as grid extension difficulty, economic feasibility and reliability. The use of existing micro-hydropower (MHP) with other renewable resources in rural areas has not been well studied. Moreover, it is challenging to use mathematical optimization algorithms for these kinds of real-world problems, so the derivative-free algorithm is highly sought. In this paper, a methodology has been proposed to perform the optimal sizing, financial and generation uncertainty analysis of solar photovoltaic (SPV) based on an MHP that is proposed to handle the intermittent power output of the SPV. The analysis is performed in two cases: using storage and without storage. The optimal sizing is performed using the least present value cost and reliability constraint using different derivative-free algorithms. The storage-based hybrid system has been found to generate reliable electricity at minimal cost than without a storage-based one. This study would be helpful to propose electrification and existing micro-hydro reinforcement policies to provide reliable electricity in rural areas.
- 10 May 2021
- Published by Taylor & Francis in International Journal of Green Energy
- Vol. 18 (14) , 1469-1481
Techno-economic and environmental assessment of utilizing campus building rooftops for solar PV power generation
The academic institute, a huge consumer of energy, is still depending upon the grid and/or conventional fuel despite having potential areas of a solar PV installation. No such study has been reported in Nepal which has techno-economically discussed the potential use of academic institute rooftops for solar PV installation. In this study, we have investigated the techno-economic and environmental assessment of a 1 megawatt (MW) rooftop solar PV using PVsyst for Purwanchal Campus, Nepal. It has been estimated the plant will produce about 1,660 MWh of usable AC electricity annually and out of which 95% can be supplied to the grid. The remaining can fulfill the demand of the campus at sunshine hours. For this, a capital investment of about USD 961,404 is needed for the plant with an annual operating cost of USD 8,008. This project gives a 190% return of investment within its life of 25 years with a Levelized cost of energy (LCOE) of 0.069 USD/kWh. The performance ratio and payback period of the project are calculated at about 0.765 and 8.4 years, respectively. The system will produce about 97% less emission than that of diesel generator, which is currently being used for power backup. It is concluded that a 1 MW grid-connected solar PV system is feasible for the studied campus.
- 10 May 2021
- Published by Taylor & Francis in International Journal of Green Energy
- Vol. 18 (14) , 1469-1481
Techno-economic and environmental assessment of utilizing campus building rooftops for solar PV power generation
The academic institute, a huge consumer of energy, is still depending upon the grid and/or conventional fuel despite having potential areas of a solar PV installation. No such study has been reported in Nepal which has techno-economically discussed the potential use of academic institute rooftops for solar PV installation. In this study, we have investigated the techno-economic and environmental assessment of a 1 megawatt (MW) rooftop solar PV using PVsyst for Purwanchal Campus, Nepal. It has been estimated the plant will produce about 1,660 MWh of usable AC electricity annually and out of which 95% can be supplied to the grid. The remaining can fulfill the demand of the campus at sunshine hours. For this, a capital investment of about USD 961,404 is needed for the plant with an annual operating cost of USD 8,008. This project gives a 190% return of investment within its life of 25 years with a Levelized cost of energy (LCOE) of 0.069 USD/kWh. The performance ratio and payback period of the project are calculated at about 0.765 and 8.4 years, respectively. The system will produce about 97% less emission than that of diesel generator, which is currently being used for power backup. It is concluded that a 1 MW grid-connected solar PV system is feasible for the studied campus.