Moray Kidd
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Moray Kidd has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Akilu Yunusa-Kaltungo
University of Manchester
1 shared publication - E. Naylor
Consultant-Fluids Fraser Nash Consultancy Ltd., Cayman House, First Avenue, Centrum 100, Burton-upon-Trent, Staffordshire DE14 2WN, UK
1 shared publication - Frederick Appoh
Department of Mechanical, Aerospace and Civil Engineering, The University of Manchester, Manchester, U.K.
1 shared publication - G. Tasker
EDF Energy, West Burton Power Station, Retford, Nottinghamshire DN22 9BL, UK
1 shared publication - Jyoti Kumar Sinha
Dynamics Laboratory, The Department of Mechanical and Aerospace Engineering, The University of Manchester, Manchester M13 9PL, UK
1 shared publication - Wolfgang Hahn
Coal, Gas and Renewables, EDF Energy, Barnwood UK
1 shared publication
Latest Publications
- Open Access
- 11 May 2021
- Published by Springer Nature in Urban Rail Transit
- Vol. 7 (2) , 139-157
Practical Demonstration of a Hybrid Model for Optimising the Reliability, Risk, and Maintenance of Rolling Stock Subsystem
Railway transport system (RTS) failures exert enormous strain on end-users and operators owing to in-service reliability failure. Despite the extensive research on improving the reliability of RTS, such as signalling, tracks, and infrastructure, few attempts have been made to develop an effective optimisation model for improving the reliability, and maintenance of rolling stock subsystems. In this paper, a new hybrid model that integrates reliability, risk, and maintenance techniques is proposed to facilitate engineering failure and asset management decision analysis. The upstream segment of the model consists of risk and reliability techniques for bottom-up and top-down failure analysis using failure mode effects and criticality analysis and fault tree analysis, respectively. The downstream segment consists of a (1) decision-making grid (DMG) for the appropriate allocation of maintenance strategies using a decision map and (2) group decision-making analysis for selecting appropriate improvement options for subsystems allocated to the worst region of the DMG map using the multi-criteria pairwise comparison features of the analytical hierarchy process. The hybrid model was illustrated through a case study for replacing an unreliable pneumatic brake unit (PBU) using operational data from a UK-based train operator where the frequency of failures and delay minutes exceeded the operator’s original target by 300% and 900%, respectively. The results indicate that the novel hybrid model can effectively analyse and identify a new PBU subsystem that meets the operator’s reliability, risk, and maintenance requirements.
- 11 May 2021
- Published by Springer Nature in Urban Rail Transit
- Vol. 7 (2) , 139-157
Open AccessPractical Demonstration of a Hybrid Model for Optimising the Reliability, Risk, and Maintenance of Rolling Stock Subsystem
Railway transport system (RTS) failures exert enormous strain on end-users and operators owing to in-service reliability failure. Despite the extensive research on improving the reliability of RTS, such as signalling, tracks, and infrastructure, few attempts have been made to develop an effective optimisation model for improving the reliability, and maintenance of rolling stock subsystems. In this paper, a new hybrid model that integrates reliability, risk, and maintenance techniques is proposed to facilitate engineering failure and asset management decision analysis. The upstream segment of the model consists of risk and reliability techniques for bottom-up and top-down failure analysis using failure mode effects and criticality analysis and fault tree analysis, respectively. The downstream segment consists of a (1) decision-making grid (DMG) for the appropriate allocation of maintenance strategies using a decision map and (2) group decision-making analysis for selecting appropriate improvement options for subsystems allocated to the worst region of the DMG map using the multi-criteria pairwise comparison features of the analytical hierarchy process. The hybrid model was illustrated through a case study for replacing an unreliable pneumatic brake unit (PBU) using operational data from a UK-based train operator where the frequency of failures and delay minutes exceeded the operator’s original target by 300% and 900%, respectively. The results indicate that the novel hybrid model can effectively analyse and identify a new PBU subsystem that meets the operator’s reliability, risk, and maintenance requirements.
- 11 February 2014
- Published by ASME International in Journal of Engineering for Gas Turbines and Power
- Vol. 136 (6) , 062504
Crack Initiation in 14% Cr Low Pressure Turbine Blade Steel
The impact of multiple erosion pits and crack initiation was investigated for a 500 megawatt (MW) steam turbine unit with three low pressure (LP) rotors on the steam end and generator end of the stage L0 blades. These units have been subjected to two-shifting operation and have been retrofitted with new high pressure (HP) turbine units over the life history of the turbines. Droplet erosion damage was exacerbated by operating conditions causing multiple crack initiation sites concentrated above the root platform. A method of accumulated damage was employed using pit counting and the number of cycles referenced back to turbine revolutions in line with the accumulated damage model developed from the damage function analysis and Palmgren–Miner approaches. The number of rotational cycles were calculated from the starts and running hours for pre- and post-retrofit scenarios and compared and correlated to the number of pits formed during the completed cycles. The macro crack size represented the critical crack size or a damage number of one. It was found that there was a significant shift in the number of rotations before and after the HP turbine retrofit to achieve a damage rate of one. An accumulated damage model was developed for the post HP turbine retrofit and the LP turbine last stage blades fitted from new, based on the empirical evidence from the analysis. Assessments on the erosion distribution in the zoned areas revealed evidence of cracking, manifesting 18 mm away from the highest probability distribution with a standard deviation of 2 mm. The area where cracking first initiated on multiple samples was found to coincide with the mechanical change in the section blending in with the blade trailing edge. The damage model was implemented on a ive running plant and successfully applied over a period of two years using the most conservative approach, based on the lower bound values.
- 11 February 2014
- Published by ASME International in Journal of Engineering for Gas Turbines and Power
- Vol. 136 (6) , 062504
Crack Initiation in 14% Cr Low Pressure Turbine Blade Steel
The impact of multiple erosion pits and crack initiation was investigated for a 500 megawatt (MW) steam turbine unit with three low pressure (LP) rotors on the steam end and generator end of the stage L0 blades. These units have been subjected to two-shifting operation and have been retrofitted with new high pressure (HP) turbine units over the life history of the turbines. Droplet erosion damage was exacerbated by operating conditions causing multiple crack initiation sites concentrated above the root platform. A method of accumulated damage was employed using pit counting and the number of cycles referenced back to turbine revolutions in line with the accumulated damage model developed from the damage function analysis and Palmgren–Miner approaches. The number of rotational cycles were calculated from the starts and running hours for pre- and post-retrofit scenarios and compared and correlated to the number of pits formed during the completed cycles. The macro crack size represented the critical crack size or a damage number of one. It was found that there was a significant shift in the number of rotations before and after the HP turbine retrofit to achieve a damage rate of one. An accumulated damage model was developed for the post HP turbine retrofit and the LP turbine last stage blades fitted from new, based on the empirical evidence from the analysis. Assessments on the erosion distribution in the zoned areas revealed evidence of cracking, manifesting 18 mm away from the highest probability distribution with a standard deviation of 2 mm. The area where cracking first initiated on multiple samples was found to coincide with the mechanical change in the section blending in with the blade trailing edge. The damage model was implemented on a ive running plant and successfully applied over a period of two years using the most conservative approach, based on the lower bound values.