OVOleksandr Voitenko

Oleksandr Voitenko

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Oleksandr Voitenko has a total of 25 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    The model of adaptive information content distribution in multichannel systems

    by Oleksandr Voitenko, Artem Yurechko

    The study's relevance stems from the shift in digital content delivery from a single website to a set of heterogeneous channels (web, mobile applications, digital signage, partner APIs, e-mail), each with its own restrictions on formats, payload size, text length, and language. Headless content management systems (CMS) decouple the content repository from presentation and expose content through APIs. Still, they leave the choice of a channel- and context-appropriate representation to the consuming application, which in practice leads to over-delivery, violation of channel constraints and duplicated authoring. This study aims to develop a model for adaptive distribution of information content in multichannel systems built on a headless CMS and to evaluate it experimentally. The model is defined as a tuple of content units, channels with capability profiles, delivery contexts, representation variants, a system of admissibility conditions and an adaptation function that selects, for each delivery, the admissible representation maximising a weighted utility of relevance, completeness, payload and estimated transfer time; a fallback representation guarantees delivery when no admissible variant exists. The methods used are set-theoretic modelling, algorithm design and a controlled computational experiment. The model was implemented as an adaptation layer between the REST API of the open-source headless CMS Strapi v5 and five channel simulators, and evaluated on a deterministic synthetic corpus of 300 localised content units in three delivery scenarios (desktop, mobile, mixed), 2000 deliveries each, against a static one-representation-per-channel baseline. The scientific result is a formalised adaptation model whose selection is driven jointly by channel profile and delivery context rather than by channel alone. Experimentally, the adaptive model eliminated constraint violations (from 41–50% for the static baseline to 0%), reduced mean payload per delivery by 30–54 times and the 95th percentile of delivery latency by 37–145 times, at the cost of a decrease in content completeness of 8–15 percentage points and a median adaptation overhead below 0.1 ms per request. The practical value lies in deploying the adaptation layer on top of any API-first CMS without changing content authoring, and in the reproducible experimental setup released with the article. Further research should focus on learning the utility weights from user interaction data and validating the model on production traffic.

  • Open Access

    Methods and tools for project management of developing intelligent information systems for airfare monitoring

    by Yevhen Kutniak, Oleksandr Timinskyi, Oleksandr Voitenko

    The task of project management for creating an information system for monitoring changes in air ticket prices as a data-driven product with a machine learning component is considered. The relevance of the study is due to the high dynamics of airline pricing, the dispersion of price information among numerous sources, and the underdevelopment of the proactive monitoring and price forecasting segment in the Ukrainian and European markets, which makes independent price monitoring difficult for the average user. The developed solutions will allow Ukrainian consumers to prepare for the resumption of air transportation after the end of the war. The purpose of the study is to develop a model for managing such a project and a set of project management tools that take into account the specifics of data accumulation and the research nature of training predictive models. To achieve this goal, a systemic analysis of the subject area, a comparative analysis of IT project management methodologies, a SWOT analysis, the work breakdown structure method (WBS), and the logical framework approach (LFA) were used. The choice of a hybrid management methodology is justified, combining Scrum as the main development framework, CRISP-DM elements for the data and model lifecycle, Kanban for the support phase, as well as ISO 31000 and MSF for risk management. The classic three-phase Scrum structure is expanded to four phases (initialization, planning, development, support and development), reflecting the specifics of a data-driven product, with an emphasis on the early start of the data collection subsystem as a critical prerequisite for training predictive models. On this basis, a hierarchical WBS is built according to the product principle, which decomposes work into functional modules of the system down to the level of work packages. The SWOT analysis reveals the strengths and weaknesses of the project, opportunities and threats of the external environment, and the principles of effective management are substantiated. Using LFA, the subject area is formalized by building a problem tree. Prospects for further research are related to the development and validation of a predictive model of price dynamics on real data and the transition to more complex ML algorithms.

  • Open Access

    Business process models for counter-turbulent portfolio management in a general contracting organization

    by Oleksandr Voitenko, Valerii Hudov

    This article analyzes research on project management, project portfolio management, and risk management. It identifies a previously unsolved part of the scientific problem. Within the type of “management processes”, a set of processes for counter-turbulent management of construction project portfolios by a general contracting organization is proposed (11 such processes are identified: 1. Negotiations with the customer on the performance of the general contracting function. 2. Formation of a construction project portfolio. 3. Determination of the responsibility structure for managing the construction project portfolio. 4. Determination of subcontractors by the general contracting construction organization. 5. Monitoring the implementation of the construction project portfolio. 6. Improvement of models, methods and IT tools for monitoring the construction project portfolio. 7. Improvement of the quality management system for managing the construction project portfolio. 8. Implementation of counterturbulent management of the construction project portfolio. 9. Assessment of the effectiveness of the counter-turbulent management system for the construction project portfolio. 10. Review of the composition of the construction project portfolio. 11. Determination of motivation for the successful implementation of the construction project portfolio.). An analysis of the applicability of models and methods of artificial intelligence and emotional intelligence (separately and together) for the proposed set of processes was conducted. The processes for which the highest AI applicability index, EI applicability index, and AI+EI combination applicability index were determined. The processes for which the lowest and highest total values of the proposed indicators were observed were also identified. Process 2 “Formation of a construction project portfolio”, process 8 “Implementation of counter-turbulent management of a construction project portfolio” and process 9 “Evaluation of the effectiveness of the counter-turbulent management system of a construction project portfolio” were considered. Models of such processes were proposed and described in the BPMN 2.0 business process description notation. Within the framework of the process description, a model of weighted AI-EI portfolio composition assessment and a business process model of counter-turbulent portfolio management in a general contracting organization are proposed. Conclusions from the conducted research are formulated.


  • Open Access

    Substantiation of a project management methodology for the modernization of the traffic control management system in territorial communities during post-war reconstruction

    by Olena Verenych, Oleksandr Voitenko, Ihor Vasyliev

    One of the key tasks of the post-war reconstruction of Ukrainian territorial communities is the modernization of traffic control. This is driven by the need to address a range of peacetime transport challenges that have been compounded by the consequences of armed aggression: destroyed infrastructure, disrupted logistics and resource shortages. Effective traffic control management requires the use of advanced information technologies that support rapid, high-quality managerial decision-making in critical situations, including during periods of armed aggression. Within the framework of traffic control modernization, this necessitates the concurrent modernization of the traffic control management system itself, in terms of its capability to deploy and operate these technologies. However, the modernization of traffic control is a complex socio-technical project characterized by high uncertainty and risks, the likelihood of which increases significantly under martial law and conditions of armed aggression, potentially leading to schedule overruns and suboptimal decisions related to the implementation of traffic control modernization. Therefore, the substantiated selection of a project management methodology that systematically takes into account the specific features of managing projects for modernizing traffic control management systems in territorial communities under the conditions of Ukraine’s post-war recovery is of critical importance. The purpose of the paper is to analyse existing methodologies and substantiate the choice of one that reflects the specific nature of traffic control modernization projects in a post-war reconstruction context. The literature review demonstrates a shift towards hybrid and syncretic models that combine predictive (“hard”) and agile (“flexible”) approaches. Given the infrastructural and information-intensive nature of traffic control modernization projects, the application of a syncretic approach is justified. A Waterfall–Scrumban hybrid methodology is proposed. It applies the traditional Waterfall model to stages with well-defined requirements (analysis, design and approval), while the agile Scrumban framework (a convergence of Scrum and Kanban) is used for the iterative implementation, testing and integration of digital modules that require adaptability. This combination structures innovation, enables adaptation to evolving security conditions and enhances overall controllability of the project. The model also establishes a multi-level risk management system: Waterfall supports strategic planning, whereas Scrumban is responsible for tactical monitoring and response. The proposed approach enables the effective integration of physical infrastructure deployment with the rollout of digital innovations. Its key advantage lies in its capacity to respond appropriately to the challenges and threats of martial law and post-war reconstruction, thereby ensuring the effectiveness, resilience and transparency of the projects.

  • Open Access

    Project portfolio management: development directions in the relationship between artificial intelligence tools and team emotional intelligence

    by Oleksandr Voitenko, Valerii Hudov, Валерій Гудов

    The article analyzes research on project and portfolio management, as well as known standards and methodologies, in the context of their possible use for the development of the proposed AEI (Artificial and Emotional Intelligence) portfolio management approach. Modern directions for the development of portfolio management are identified – a systematic approach to multi-project management, a hierarchical set of project activity artifacts, the presence of regulations for portfolio management processes, the use of specialized IT tools for managing project portfolios, the use of elements of artificial intelligence to perform individual tasks of project portfolio management, portfolio management by a separate team of specialists, the use of creative portfolio management technologies and models and methods for developing portfolio management competencies in portfolio team members, and the introduction of stricter requirements for construction project portfolios in Ukraine, which are being implemented during the war caused by russian aggression against Ukraine. A previously unsolved part of the scientific problem has been identified – the creation of models and methods for managing a portfolio of construction projects based on the use of elements of artificial intelligence in decision support tools and emotional intelligence of the portfolio management team. AEI portfolio management has been proposed – cross-portfolio artificial-emotional intelligence management for use in construction project-oriented organizations. The elements that can be laid down as the basis of such an approach have been characterized: classical methodologies and standards for portfolio management, flexible Agile methodology, elements of artificial intelligence for use in project-oriented IT technologies, emotional intelligence of portfolio management team members, cross-portfolio corporate standard for project activity management The main features of such elements are highlighted and their suitability for use in the specified context is assessed. Taking into account the specifics of the proposed approach, the portfolio management classification is expanded for the further development of such classifications, new classification features are proposed (using emotional intelligence, using a combination of artificial intelligence portfolio management tools and emotional intelligence of the team, using a dominant approach to integrating the project management system in the organization) and types of portfolios according to such features. A mosaic model of AEI portfolio management is proposed, a description of this model in set form is given. A SWOT analysis of the proposed AEI portfolio management approach is conducted, its strengths and weaknesses are highlighted, as well as opportunities and threats that may arise when using it. A conclusion is made regarding the high potential of its effectiveness. Areas of further research in the chosen direction are formulated. Conclusions from the conducted research are formulated.

  • Open Access

    Assessment of the impact of project team members on the communications system

    by Vladyslav Kontsevyi, Oleksandr Voitenko, Владислав Концевий

    This article presents a comprehensive approach to assessing the impact of project team members on the communication system within a digital environment. The relevance of this study stems from the increasing prevalence of virtual and hybrid teams in contemporary organizations, where communication effectiveness relies significantly not only on technical resources but also on the behavioral attributes of the participants. The study identifies that individuals can act as disruptive factors, affecting the quality of team interaction and information flow. To identify and quantify this influence, the FIRO-B model was employed, which allows for the determination of each team member's interpersonal orientation across three key dimensions: inclusion, control, and affection. These characteristics were further analyzed in conjunction with an assessment of eight areas of destructive influence: technological barriers, resistance to change, negativity, micromanagement, misinformation, lack of cooperation, dominance in communications, and time disruption. Formulas for calculating the individual indicator of current influence and the relative influence on the communication system have been developed, incorporating an inverse relationship with the level of leadership skills. The practical implementation is realized through a web application built on the Flask framework. The description details the architecture of the software solution, which includes server logic, a user interface, a database, an authorization module, and a system for visualizing results. The application enables the input of individual team member indicators, automatically calculates their level of influence on the communication environment, and displays the results in tables and graphs. For data processing and analysis, integration with SQLite/PostgreSQL databases is implemented, along with the capability to export results and automate the collection of input information using Microsoft Forms and Power Automate. The developed tool allows project managers to promptly identify behavioral risks, evaluate the effectiveness of the communication structure, and make informed management decisions regarding team composition.

  • Open Access

    Approaches to assessing the sustainability of territorial communi-ties

    by Olena Verenych, Yevheniia Boiko, Oleksandr Voitenko

    The article is devoted to exploring approaches and identifying sustainable development indicators for territorial communities. The ability to apply sustainable development principles in managerial decision-making regarding the development of territorial communities requires the establishment of priorities or goals for sustainable development. These priorities, in turn, must be based on criteria that can be measured and assessed. Currently, sustainable development approaches are among the fundamental ones in preparing funding proposals for territorial communities or evaluating them from the perspective of potential investors. However, even though certain territorial communities actively use the defined term when preparing proposals or presenting the community to the public, few can accurately determine which specific indicators need to be calculated. In the practice of managing a territorial community, various indicator systems are widely used to assess the state of a particular sphere of activity (or development direction) of the community from a chosen perspective (which underpins the formation of the indicator system). An analysis of the literature revealed that there are sufficient approaches offering suggestions for defining indicators that can characterize the sustainable development of a community. The article proposes using the Bellagio principles to develop an approach for quantitative calculations. It also suggests the application of mathematical methods to calculate certain indicators. The proposed approach includes, taking into account sectoral characteristics, groups of indicators for ensuring the livelihood of the population, territorial development, and entrepreneurial development, as well as indicators reflecting the social and environmental responsibility of the territorial community. This set of indicators can be used as criteria for substantiating managerial decisions in territorial communities


  • Open Access

    Implementation of a project-based approach in modernizing a municipal enterprise for traffic control during post-war community reconstruction

    by Oleksandr Voitenko, Ihor Vasyliev, Ігор Васильєв

    With the onset of military aggression against Ukraine, territorial communities have faced direct and indirect impacts of hostilities across various spheres of life, including transportation mobility. During wartime, this has profoundly negative implications, as it, firstly, hampers the ability to fully address issues related to national defense and the resilience of communities to wartime threats and challenges, and secondly, leaves unresolved the peacetime mobility challenges. In such circumstances, it becomes essential to adapt mobility to the conditions of wartime and the post-war reconstruction of communities based on principles of sustainability, taking into account potential threats and challenges associated with the consequences of hostilities. This applies both to communities that had already begun transitioning their transportation systems towards "peaceful" sustainable mobility before the war and to those where no measures for sustainable mobility were implemented in the pre-war period. One method to ensure the transition of communities to mobility adapted to wartime conditions and reconstruction involves the use of less capital-intensive and shorter-term measures (compared to rigid strategies). These "soft measures" for mobility development include traffic control. The development and implementation of traffic control measures, as a means of exerting managerial influence on the "Road Conditions – Traffic Flows" system during wartime and community reconstruction, require the collection, processing, and analysis of large volumes of data on road conditions and traffic flows. The speed and quality of these processes directly influence the effectiveness of managerial decisions and their alignment with situations arising from the impacts of hostilities on the territorial community. Implementing this approach is possible only through the digitalization of traffic control management processes, which necessitates the modernization of the controlling system and its key component – the enterprise responsible for executing managerial decisions related to traffic control. The complexity of this task demands a comprehensive and systemic application of a project-based approach to the modernization of the enterprise.

  • Open Access

    Infrastructure projects of road traffic management: management methodology selection

    by Sergiy Bushuyev, Lydmila Tereikovska, Oleksandr Voitenko, Сергій Бушуєв, Олена Веренич, Людмила Терейковська

    The implementation of projects in traffic organization requires the selection of a necessary methodology that will contribute to its success. Most commonly, traffic organization refers to the management of traffic flows, but this is not entirely accurate. Traffic organization is defined as a set of measures aimed at ensuring safety and comfort conditions for traffic. Given the modern context and trends, we can talk about supporting the principles of sustainable development and ensuring national defense capability and security. Such activity consists of several stages, some of which can be implemented as a chain of sequential steps, while others can be introduced step by step with feedback and the implementation of current improvements. The proposed research results focused on selecting the necessary methodology for implementing infrastructure projects on traffic organization, taking into account the subject area. Based on a detailed analysis of the subject area and existing project management methods, approaches, principles, and frameworks, a syncretic approach was proposed for implementing these projects. This approach includes the use of a waterfall model and a combination of Scrum principles and Kanban agile development methods. The research is one of the initial outcomes of the scientific research project 'Methodology of Project Management for Modernization of Traffic Organization in the Military and Post-War Reconstruction of Territorial Communities,' registered under number 0123U101943, and is funded by the state budget of Ukraine. The results of this research will form the basis for further studies related to the exploration of the fundamental principles of sustainable development in the context of traffic organization and the development of a project management methodology for the modernization of traffic organization in the military and the post-war reconstruction of territorial communities.