FMFrans Mulders

Frans Mulders

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Frans Mulders has a total of 39 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Stress development and possible fault reactivation in and around producing gas reservoirs

    by F.M.M. Mulders

    Many gas fields are being produced in the northern Netherlands. Gas production causes changes in the in situ effective stress field, eventually leading to fault reactivation and induced seismicity. Induced seismicity has become a growing problem in the Netherlands in the past two decades. In order to obtain more fundamental insight in the mechanisms of induced seismicity, gas reservoirs are modelled using the finite element method. The geomechanical models are representative for most of the Rotliegend gas fields in the Netherlands. The influence of several key parameters on stress development and fault slip on a normal fault intersecting a disk-shaped gas reservoir are studied. Three significant parameters are presented in this paper:Young’s modulus and Poisson’s ratio of the surrounding rock and fault orientation in a 3D anisotropic tectonic stress field. For the modelled conditions, incorporating an extensional stress regime, it could be concluded that a surrounding rock which is relatively stiff in relation to the reservoir rock promotes both normal and reverse fault slip. A fault with a strike direction parallel to the largest horizontal tectonic stress incorporates the most critical stress development during gas depletion. Strike-slip does at most hardly contribute to the calculated fault slip.

  • From 3D Seismic Inversion to Drilling Engineering: A Multidisciplinary Approach to Resolve Wellbore Stability Issues Offshore West Madura

    by F. Mulders, R. Lemanczyk, K. Johnstone, S. Spencer, E. Castillo, Y. Sorrentino, A. McDonald, A. Mawira, D. Rubyanto, A. Nugraha Khadafi

    The drilling of wells offshore West Madura, East Java, can be challenging. The geological structure of the area often requires drilling at high deviations with large stepouts, through formations consisting of carbonates, shales and sands. As a result, wellbore stability issues are frequently encountered, such as total mud losses, stuck pipe, loss of bottom hole assemblies and associated sidetracking, leading to non-productive drilling time and unnecessary costs. In order to lower the associated risks the operator commissioned a geomechanics study, to identify the root causes of the wellbore stability issues, and provide recommendations for improved drilling of future development wells. Numerous wells had been drilled within the area of interest over more than three decades, resulting in a large variation in the availability and quality of data. Recently acquired 3D seismic data were also available. Therefore, a multidisciplinary approach was employed with geomechanics at its core, accompanied by well log conditioning, generation of synthesized shear sonic logs, simultaneous seismic inversion, and drilling engineering. The integration of the different disciplines ensured the development of robust 1D and 3D geomechanical models, which were applied to develop mud weight recommendations for the planned development wells. Firstly, a 1D geomechanical model was constructed. Two recently drilled wells had excellent data sets: extended leakoff and minifrac test results showed very consistent fracture closure pressures. This, combined with the presence of borehole breakouts and direct rock strength measurements on core, allowed the determination of the minimum and maximum horizontal stresses with only small ranges of uncertainty. The 1D geomechanical model was further calibrated by a detailed comparison with critically reviewed drilling incidents. Simultaneously, well logs were conditioned and pseudologs were created, which were used for 3D simultaneous seismic inversion, from which rock property volumes (P-impedance, S-impedance, and Vp/Vs) were derived in turn. Gardner’s relationship was used to transform the seismic velocity data to a density volume. The 1D geomechanical model was subsequently combined with the 3D seismic data via a structural model grid, resulting in a full 3D geomechanical model containing cubes of pore pressure, principal insitu stresses, elastic rock properties and rock strength. Finally, wellbore stability analyses were performed for the planned development wells, including a quantitative risk assessment to gauge the impact of uncertainties in various key variables on the overall potential drilling success. Well deviation and azimuth sometimes showed a counterintuitive effect on recommended mud weights, as illustrated by stereonet plots. A key factor in the execution of this project was the integration of data and expertise in petrophysics, seismic inversion, geomechanics and drilling engineering over a relatively short timeframe to deliver a technically robust set of mud weight windows, which, combined with recommendations based on a detailed review of passed drilling practices, should enable the successful drilling of the wells in this very challenging environment.


  • Integrated Sand Management Strategy Development: Kinabalu Field

    by Colin Alexander McPhee, Craig McKenzie Webster, Gill Daniels, Christopher Reed, Frans Mulders, Craig Howat, Alan Britton

    The mature Kinabalu oilfield is currently producing 18,000 bopd from a peak of 40,000 bopd in 1998. Field rejuvenation plans include drilling and completing new infill and development wells from both the existing platform and a new platform. Most platform wells are currently producing sand and none have been completed with sand control. Although current levels are less than 10 pptb, sand production has caused erosion issues and lost production due to the need for regular separator clean outs on the existing platform. Sand production is therefore a key risk factor for both existing well integrity and new well completion design. An integrated, practical and pragmatic sand management strategy was developed founded on establishing the causes of sand production, predicting the conditions for sand failure, and ranking both passive and active sand control options. 1D geomechanical models were built from field, core and well data. The sand failure analytical model was initially calibrated against existing well sand production records, then run for the proposed new wells to assess the potential for sand production over the remaining field life. The model was also used to evaluate passive alternatives to active sand exclusion completions. Modelling supported field observations that sand production is closely linked to reservoir depth, completion style, well inclination and, most importantly, depletion level – sand production is unlikely at initial pressure conditions but is triggered by depletion. The sand failure analyses were embedded in an objective screening protocol which was developed to rank sand control options. This considers existing and proposed well completion architecture, facilities design/limitations, and recognises inherent data uncertainties. This systematic methodology allows a consistent, objective and transparent view of benefits and risks across the different sand control system aspects. Key selection criteria were utilised rather than arbitrary decisions based on limited and often unaudited data. The process ensured a best practice, fit for purpose, and structured sand management solution. As the current levels of sand production remain low, and in response to the challenges associated with remedial or retro-fitting sand control, optimised surface sand management will continue to be the preferred solution for all existing wells. Improved bean up procedures have already reduced sand production at well start up after a shut down. Sand production in most new infill and development wells is predicted to be manageable. In the higher risk wells, targeting shallower or weaker sands, installing sand control would be the default position. Yet re-thinking the completion design, optimising surface sand management procedures, managing drawdown and BHFP levels, and taking advantage of favourable stress vectors through oriented perforation can extend the sand free well operating envelopes over life of well production and depletion conditions, reducing or deferring the need for sand control in all but the highest sanding risk reservoirs. The first infill well to be completed with oriented perforations in Kinabalu produced at 2500 bopd on test with minimal levels of sand. Installing downhole pressure gauges in infill wells have improved BHFP control within the critical well pressure operational envelope from the sand failure model. To date the wells have shown significantly lower sand production than historically seen on Kinabalu production wells. Background: Field Details: The Kinabalu oil field, located 55 km west-north-west of Labuan, Malaysia, consists of three separate accumulations: Kinabalu Main, Deep, and East (Fig. 1). The bulk of the reserves are in the multiple stacked shoreface Miocene sands (F, J, K, L, M, and O) in Kinabalu Main.


  • Developing an Integrated Sand Management Strategy for Kinabalu Field, Offshore Malaysia

    by Colin Alexander McPhee, Craig Webster, Gillian Daniels, Christopher Reed, Frans M.M. Mulders, Craig Howat, Alan Britton

    The Kinabalu oilfield is currently producing 14,000 bopd from a peak of 40,000 bopd in 1998. Present field rejuvenation plans include drilling and completing new infill and development wells from both an existing and a new platform. Most platform wells are currently producing sand and none have been completed with sand control. Sand production has caused erosion issues and lost production due to the need for regular separator clean outs, and is a key risk factor for both existing well integrity and new well completion design. A multi-disciplinary team was tasked with determining the causes of sand production, and to develop a fit for purpose sand management strategy for this mature, brownfield redevelopment. A coupled geomechanical/sand failure model was employed to assess sand failure, and to evaluate alternatives to sand exclusion completions. The model was calibrated using existing well sand production data, then run for the proposed new wells to assess the potential for sand production over the remaining field life. The model confirmed that sand production is closely linked to reservoir depth, completion type, well inclination and, most importantly, depletion level. An objective screening process was developed to rank sand control options. This considers existing and proposed well completion architecture, facilities design/limitations, and recognises inherent data uncertainties. The systematic sand management methodology allows a consistent, objective and transparent view of benefits and risks across the different system aspects. Key selection criteria were utilised rather than arbitrary decisions based on limited and often unaudited data. The process ensured a best practice, fit for purpose, and structured sand management solution. In light of the currently low levels of sand production and the challenges associated with remedial or retro-fitting sand control, optimised surface sand management will continue to be the preferred solution for all existing wells. Predicted sand production in most new wells is manageable. Some wells targeting shallower or weaker sands would normally be sand control candidates, but re-thinking the completion design, optimising surface sand management procedures, managing drawdown and BHFP levels, and taking advantage of favourable stress vectors through oriented perforation can extend the sand free well operating envelopes over life of well production and depletion conditions, reducing or deferring the need for sand control in all but the highest sanding risk reservoirs. Background Field Details and Sand Production History In 2012, Talisman entered into a production sharing contract to further develop the Kinabalu oil field, located 55 km west-north-west of Labuan, Malaysia (Fig. 1). The field was discovered in 1989 and was appraised by 5 wells, prior to embarking on the field development plan in 1998. The field consists of three separate accumulations: Kinabalu Main, Deep, and East (Fig. 2). The bulk of the reserves are in the multiple stacked shoreface Miocene sands (F, J, K, L, M, and O ) in Kinabalu Main. These sands comprise poorly stratified fine to medium grained, moderately to well sorted sandstones with good porosity and permeability; laminated sands with medium porosity and permeability; and bioturbated sandstones comprising fine to very fine, moderate to poorly sorted sands with poor porosity and permeability. The field started commercial production in late 1997 and reached a peak of 40,000 bopd at the end of 1998. Currently (June 2014) the field is producing around 14,000 bopd. Most of the oil reservoirs have depleted much faster than expected due to limited aquifer support, although Kinabalu East is at virgin reservoir pressure.


  • Open Access

    Monitoring the CO2 injection site: K12-B

    by Vincent Vandeweijer, Bert van der Meer, Cor Hofstee, Frans Mulders, Daan D’hOore, Hilbrand Graven


  • CO2 Storage and Enhanced Gas Recovery at K12-B

    by V. P. Vandeweijer, L. G. H. Van der Meer, C. Hofstee, D. D’hOore, F. Mulders


  • The feasibility of effective and safe carbon dioxide storage in the De Lier gas field

    by C. Hofstee, F. Seeberger, B. Orlic, F. Mulders, F. van Bergen, R. Bisschop


  • CO2 Injection in the nearly depleted K12-B North Sea gas field

    by Rob Arts, Bert van der Meer, Cor Hofstee, Frans Mulders, Daar D’hoore, Kees Geel And Pascal Winthaegen


  • Correlation between hydrocarbon reservoir properties and induced seismicity in the Netherlands

    by R.M.H.E. Van Eijs, F.M.M. Mulders, M. Nepveu, C.J. Kenter, B.C. Scheffers