KSKrisanthi Seneviratne

Krisanthi Seneviratne

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Krisanthi Seneviratne has a total of 19 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    The ethical implementation gap in AI-driven disaster risk reduction: empirical evidence from Australia’s multi-sector analysis

    by Jude Nilantha Randeniya, Krisanthi Seneviratne, Sameera Wijesiri Pathirana, Richard Haigh, Dilanthi Amaratunga, Srinath Perera

    Context: While artificial intelligence offers transformative potential for disaster risk reduction, its ethical deployment raises critical concerns when life-critical decisions depend on algorithmic systems with varying levels of accessibility across responsible organizations. This study quantifies AI adoption disparities across Australian DRR stakeholders and identifies institutional factors driving the adoption gap between innovation and operational deployment. A mixed-methods approach combined systematic review of 217 global AI-DRR publications (1999–2024) with qualitative analysis of 14 Australian organizations across government, academic, and NGO/private sectors (February-March 2025). Semi-structured interviews and document analysis examined AI technique adoption, data integration, and downscaling applications, with implementation levels systematically coded on a 1–5 scale following an inter-coder validated protocol. Government agencies demonstrate lower AI adoption (mean score 2.1/5) compared to academic institutions (4.0/5) and NGO/private organizations (3.4/5), representing a 47.5% adoption gap between government and academic sectors (Cohen’s d ≈ 2.0, indicating large practical difference despite small sample size). While academic institutions deploy advanced techniques including GANs and hybrid AI-physics models achieving 45% accuracy improvements, government agencies remain anchored to traditional systems like ACCESS with minimal AI integration. Critical barriers include procurement constraints (18–24-month cycles), computational limitations (10x below requirements), and regulatory mandates for explainable decisions. Academic innovations in AI-based downscaling, improving spatial resolution from 60 km to 10 km, remain inaccessible to operational agencies due to absence of knowledge transfer mechanisms. The study reveals an ethical adoption disparity where organizations with greatest responsibility for community safety show lowest AI adoption, creating accountability voids and equity concerns in disaster protection. This misalignment raises fundamental ethical questions about algorithmic justice, distributive justice, and procedural fairness in public safety contexts. Bridging this gap requires ethical governance frameworks addressing transparency, accountability, and equitable access to life-saving technologies, alongside institutional reforms enabling cross-sector knowledge transfer.

  • Stakeholder Interactions in Procurement and Management of Building Services

    by Sachindra Hewavitharana, Srinath Perera, Xiaohua Jin, Krisanthi Seneviratne, Keivan Bamdad

  • Open Access

    Unlocking the Possibilities of Blockchain in Procurement and Management of Building Services Systems

    by Sachindra Hewavitharana, Srinath Perera, Xiaohua Jin, Krisanthi Seneviratne, Keivan Bamdad

    Building Services Systems (BSS) are fundamental to ensure a comfortable and safe living environment in buildings. These systems involve significant stakeholder engagement, lengthy lifecycles, and substantial financial investments, necessitating a systematic Procurement and Management (PM) approach to handle their inherent complexity. While Blockchain Technology (BT) has been proposed for various construction applications, its potential in BSS remains unexplored. This paper addresses this gap by identifying issues in the PM of BSS, categorizing them according to the RIBA Plan of Work 2020, and proposing a BT-based framework to resolve these issues. A scoping review method was conducted using Scopus and Web of Science databases. A critical review of 102 carefully selected publications revealed the top 30 PM-related issues, including six recurring issues across all stages; over-involvement of stakeholders, lack of trust, difficulty in exchanging data, lack of transparency, lack of collaboration and delays in approvals. 11 key features of BT were identified; accountability, proper history records, high audibility, integrity, anonymity, disintermediation, easy data extraction, verification, distributed shareability, immutability, and security. A conceptual framework was developed, mapping the identified issues against BT features to demonstrate how BT can address the PM issues in BSS. This framework guides the development of a prototype for implementing BT in the PM of BSS in future research stages.


  • A Review of procurement and management of building services systems: complexities and technology adoption

    by S. Hewavitharana, S. Perera, X. Jin, K. Seneviratne, K. Bamdad

    Rapid advancements in digitalisation are reshaping the global supply chains and revolutionising traditional procurement and management practices. Within the construction industry, the procurement and management of building services systems present greater complexities compared to other construction elements. This study aims to identify these complexities and explore the potential of emerging technologies to address them. A scoping literature review of 32 peer-reviewed articles was conducted to identify the complexities in the procurement and management of building services systems from different perspectives and to identify applicable digital technologies. The findings reveal that complexities span across collaboration, approvals, design requirements, technical calculations, life cycle, communication, regulatory requirements, maintenance, cost, technical skills, etc. Technologies such as Building Information Modelling (BIM), Blockchain, Data Analytics and Artificial Intelligence (AI), Digital Twin and IoT, and Building Management Systems have been widely adopted to address these complexities. This identification urges the necessity of a systematic and technology-integrated approach to the procurement and management of building services systems. The findings from this research assist construction professionals in selecting appropriate technologies aligned with the specific requirements and phases of building services procurement and management.

  • Open Access

    Application of Blockchain in Procurement and Management of Building Services: A Critical and Systematic Review

    by Sachindra Hewavitharana, Srinath Perera, Xiaohua Jin, Krisanthi Seneviratne, Keivan Bamdad

    Building services systems are essential for creating a comfortable and safe living environment in buildings. These are complex systems with high stakeholder involvement, a lengthy lifecycle, and high financial costs. This leads to building services systems having complex procurement and management (P&M) requirements which create a multitude of challenges. Blockchain technology has emerged as a revolutionary digital technology under “Procurement 4.0”. The purpose of this paper is to investigate the applicability of blockchain technology for systematic procurement and management of building services. The science mapping method was used to systematically and quantitatively analyse 102 publications related to bibliographic records retrieved from Scopus and the Web of Science databases. This includes content analysis of the existing issues, current trends of technologies, and applicability of blockchain in the P&M of building services. The results of the bibliometric analysis indicate that publications had grown significantly faster in 2021 related to the P&M of building services with new technologies while there is a minimal collaboration of countries, organisations and authors in publishing research in this area. Further, it is observed that Building Information Modelling (BIM) is the main technology utilised in general P&M. As a result of content analysis, a total of 28 issues that affect the performance of procurement and management of building services are identified. The paper critically evaluates blockchain technology in terms of peer-to-peer networks, hashing algorithms, public key cryptography, consensus mechanisms, smart contracts, and distributed ledger. It indicates that blockchain provides a perfect match for resolving these issues. The findings of the research will open a path to apply blockchain technology in building services. The study offers a readily available point of reference for practitioners, policymakers and research and development bodies.


  • Open Access

    Use of Social Media in Disaster Management: Challenges and Strategies

    by Krisanthi Seneviratne, Malka Nadeeshani, Sepani Senaratne, Srinath Perera

    Studies on social media (SM) and disaster management (DM) have mainly focused on the adaptation, application, and use of SM in each stage of DM. With the widespread availability and use of SM, the effective utilisation of SM in DM is impeded by various challenges but not yet comprehensively researched. Therefore, this paper aims to identify the challenges as well as the strategies to overcome the challenges and categorises them into a classified model. This study adopts a systematic literature review to present and analyse the challenges and strategies for using SM in DM. Utilising prominent databases, 72 publications were carefully selected and analysed qualitatively using content analysis. The findings revealed four key challenges to its users: the spread of misinformation; insufficient human resources to manage SM use; the lack of trust in information and authorities; and the poor information quality and content of messages. This study identified several strategies to overcome challenges, which can be classified into three sectors of the SM community: individuals, organisations, and SM companies. These findings contribute to enhancing the effective utilisation of SM in DM by community practitioners. Furthermore, this study provides insight into the current status of knowledge and identifies the research gaps around SM in DM for future research.


  • Open Access

    Use of Social Media in Disaster Management: Challenges and Strategies

    by Krisanthi Seneviratne, Malka Nadeeshani, Sepani Senaratne, Srinath Perera

    Studies on social media (SM) and disaster management (DM) have mainly focused on the adap-tation, application and use of SM in each stage of DM. With the widespread availability and use of SM, the effective utilisation of SM in DM is impeded by various challenges, but not yet com-prehensively researched. Therefore, this paper aims to identify the challenges, as well as the strategies to overcome the challenges and categorises them into a classified model. The study adopts a systematic literature review to present and analyse the challenges and strategies for us-ing SM in DM. Utilising prominent databases, 72 publications were carefully selected and ana-lysed qualitatively using content analysis. The findings revealed four key challenges to its users: spread of misinformation; insufficient human resources to manage SM use; lack of trust in infor-mation and authorities; and, poor information quality and content of messages. The study identi-fied several strategies to overcome challenges, which can be classified into three sectors of the SM community: individuals, organisations, and SM companies. These findings contribute to enhanc-ing the effective utilisation of SM in DM by community practitioners. Furthermore, this study provides insight into the current status of knowledge and identifies the research gaps around SM in DM for future research.


  • Good practices in COVID-19 risk reduction adopted by Australian construction enterprises

    by Krisanthi Seneviratne, Srinath Perera, Buddhini Ginigaddara, Xiaohua Jin, Liyaning Tang, Robert Osei Kyei

    Purpose: This research investigated the impacts of COVID-19 on construction enterprises and good practices adopted by the enterprises in reducing COVID-19 risks. The Sendai Framework (TSF) is widely accepted as a strategic roadmap to reduce disaster risks throughout the life cycle of a disaster. As such, with the aim of enhancing the resilience of Australian construction enterprises, the identified good practices were mapped with TSF priorities to consolidate COVID-19 risk reduction practices that can be adopted by Australian construction enterprises.Design/methodology/approach: Case study research approach was used, and three case studies were conducted with small, medium and large construction enterprises. Small, medium and large enterprises were selected based on the Australian Bureau of Statistics classification of the business size. Data were collected through semi-structured interviews conducted with three executive members from the three enterprises. Data were analysed using content analysis.Findings: The study found that construction enterprises faced demand and supply side impacts. Infrastructure projects, funded by public sector clients and larger enterprises were least affected. Investments and demand for residential and other building projects were reduced by private sector clients, affecting small and medium enterprises. Findings also show that the construction enterprises adopted good practices in identifying, managing, investing on resilience and recovery that align with TSF priorities. All three enterprises agreed on some common good practices on risk identification, risk management and effective recovery. Different views were shared on investments related to disaster resilience.Practical implications: This study contributes to mitigate the COVID-19 impacts on construction enterprises and subsequent economic and social impacts.Originality/value: This research found how Australian construction enterprises survived during COVID-19. The study adopted TSF to construction and COVID-19 context while consolidating COVID-19 risk reduction practices.


  • Open Access

    Developing a Parametric Cash Flow Forecasting Model for Complex Infrastructure Projects: A Comparative Study

    by Mahir Msawil, Faris Elghaish, Krisanthi Seneviratne, Stephen McIlwaine

    Forecasting the cash flow for infrastructure projects has not received much attention in the existing models. Moreover, disregarding the cost flow behaviour and proposing models that entail a relatively high dimensionality of inputs have been the main drawbacks of the existing models. This study proposes a heuristic cash flow forecasting (CFF) model for infrastructure projects, and it explores the underlying behaviour of the cost flow. The proposed model was validated by adopting a case study approach,the actual cost flow datasets were mined from a verified data system. The results invalidated the employment of a dominant heuristic rule with regard to a cost-flow-time relationship in infrastructure projects. On the other hand, a mathematical parameter-based comparison between the trends analysed from previous studies revealed that the cost flows of infrastructure projects procured through a design-bid-build (D-B-B) route behaved in a similar manner to building projects procured through a construction management route. This research contributes to the body of knowledge providing a method to enable infrastructure contractors to accurately forecast the required working capital through adding a new dimension for project classification by coining the term “the quaternary flow percentage”. In addition, this study indicates the importance of identifying the impact of root risks on the individual cost flow components rather than on the aggregated cost flow, which is a recommendation for future research.


  • Disputes in time bar provisions for contractors’ claims in standard form of contracts

    by Krisanthi Seneviratne, Gladstan Vimal Michael

    The time bar clause facilitates informing the Engineer (Contract Administrator) in a timely manner of the occurrence of events that may result in delayed completion and/or incur additional costs. Such notices allow parties to mitigate any potential impacts in terms of time and/or cost. Nevertheless, the time bar clause forfeits a contractor’s claim, if the notice of claim is not submitted within the stipulated time in the contract, giving rise to numerous disputes. The purpose of this study is to identify the disputes surrounding the time bar clause in the FIDIC 1999 Red Book, which is an internationally used Standard Form of Contract (SFoC) for building and engineering works designed by the employer. After identifying the sources of disputes and modifications to the standard provisions via a comprehensive literature review, the researchers conducted an online questionnaire survey with 61 construction contract professionals (employers, contract consultants and contractors) and semi-structured interviews with four contract specialists to determine the level of agreement with the identified sources of disputes and modifications to standard provisions. Sources of disputes and modifications were ranked based on the Relative Agreement Index (RAI) from the survey. Interviews were qualitatively analyzed to identify agreement/disagreement and the reasons for the agreement/disagreement.