Ibrahim Olawale Muritala
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ibrahim Olawale Muritala has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Habeeb Bello-Salau
Department of Computer Engineering, Ahmadu Bello University, Zaria 810107, Nigeria
3 shared publications - Salisu Mohammed3 shared publications
Ahmed T. Salawudeen
2 shared publications- Adeiza James Onumanyi
Next Generation Enterprises and Institutions, Council for Scientific and Industrial Research (CSIR), Pretoria 0001, South Africa
1 shared publication E A Adedokun
1 shared publication- Hauwau Abdulrahman Aliyu1 shared publication
Latest Publications
- Open Access
- 28 August 2024
- Published by Elsevier in Franklin Open
- Vol. 8
Optimizing machine learning algorithms for diabetes data: A metaheuristic approach to balancing and tuning classifiers parameters
- 28 August 2024
- Published by Elsevier in Franklin Open
- Vol. 8
Open AccessOptimizing machine learning algorithms for diabetes data: A metaheuristic approach to balancing and tuning classifiers parameters
- Open Access
- 21 January 2024
- Published by Elsevier in Franklin Open
- Vol. 6
Moving Horizon Estimator for Space Vehicle Dynamics with Measurement Noise in Close Propinquity Operation
- 21 January 2024
- Published by Elsevier in Franklin Open
- Vol. 6
Open AccessMoving Horizon Estimator for Space Vehicle Dynamics with Measurement Noise in Close Propinquity Operation
- Open Access
- 9 September 2023
- Published by Elsevier in Franklin Open
- Vol. 4
The effect of an event-triggered controller on non-strict feedback system based on the single input interval type-2 fuzzy method
- 9 September 2023
- Published by Elsevier in Franklin Open
- Vol. 4
Open AccessThe effect of an event-triggered controller on non-strict feedback system based on the single input interval type-2 fuzzy method
- Open Access
- 9 August 2018
- Published by Universitas Muhammadiyah Malang in Kinetik: Game Technology, Information System, Computer Network, Computing, Electronics, and Control
- Vol. 3 (4) , 295-304
A Three Area Interconnected Power System Network Load Frequency Controller Simulator
This paper presents a MATLAB simulator of a three area interconnected power system of Thermal-Gas-Hydro. Nonlinearities intrinsic in the interconnected power system of communication delay, Generation Rate Constraint and Generation Dead Band were measured. Bat Inspired Algorithm was exploited to select the favourable parameters of the Model Predictive Controller and the Super Conducting Magnetic Energy Storage. Model Predictive Controller was the subordinate controller employed to minimalize the Area Control Error, Super Conducting Magnetic Energy Storage was the energy buffer to balance the load demand and the power generated. Integral Time Absolute Error was the performance metrics employed to minimize the Area Control Error. Parametric dissimilarity was tested on the inter-connected power system to observe the efficacy of the controller. Step load perturbation of was concurrently applied to the three-area inter-connected network, was introduced to the thermal generating unit, was introduced to the gas and hydro generating unit. Value of the tie-line was introduced to examine its effect on the frequency deviation. The results performed better when compared with Model Predictive Controller joined with Super Conducting Magnetic Energy Storage against the Model Predictive Controller without Super Conducting Magnetic Energy Storage in relations to settling time, overshoot and undershoot.
- 9 August 2018
- Published by Universitas Muhammadiyah Malang in Kinetik: Game Technology, Information System, Computer Network, Computing, Electronics, and Control
- Vol. 3 (4) , 295-304
Open AccessA Three Area Interconnected Power System Network Load Frequency Controller Simulator
This paper presents a MATLAB simulator of a three area interconnected power system of Thermal-Gas-Hydro. Nonlinearities intrinsic in the interconnected power system of communication delay, Generation Rate Constraint and Generation Dead Band were measured. Bat Inspired Algorithm was exploited to select the favourable parameters of the Model Predictive Controller and the Super Conducting Magnetic Energy Storage. Model Predictive Controller was the subordinate controller employed to minimalize the Area Control Error, Super Conducting Magnetic Energy Storage was the energy buffer to balance the load demand and the power generated. Integral Time Absolute Error was the performance metrics employed to minimize the Area Control Error. Parametric dissimilarity was tested on the inter-connected power system to observe the efficacy of the controller. Step load perturbation of was concurrently applied to the three-area inter-connected network, was introduced to the thermal generating unit, was introduced to the gas and hydro generating unit. Value of the tie-line was introduced to examine its effect on the frequency deviation. The results performed better when compared with Model Predictive Controller joined with Super Conducting Magnetic Energy Storage against the Model Predictive Controller without Super Conducting Magnetic Energy Storage in relations to settling time, overshoot and undershoot.