Mehdi Karimi-Nasab
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Mehdi Karimi-Nasab has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
- E. Noorollahi
Department of Industrial Engineering, Iran University of Science and Technology
3 shared publications M. B. Aryanezhad
Department of Industrial Engineering, Iran University of Science and Engineering, Tehran, Iran
3 shared publicationsM. Modarres
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
3 shared publicationsS.M. Seyedhoseini
3 shared publications- Kamyar Sabri-Laghaie
Urmia University of Technology
2 shared publications M.B. Aryanezhad
Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
2 shared publications
Latest Publications
- 4 December 2022
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 10 (1)
A stochastic dynamic programming for maintenance planning of an emergency helicopter
- 4 December 2022
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 10 (1)
A stochastic dynamic programming for maintenance planning of an emergency helicopter
- 1 May 2019
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 185, 144-162
Random search algorithms for redundancy allocation problem of a queuing system with maintenance considerations
- 1 May 2019
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 185, 144-162
Random search algorithms for redundancy allocation problem of a queuing system with maintenance considerations
- 1 January 2017
- Published by Inderscience Publishers in European J. of Industrial Engineering
- Vol. 11 (4) , 425
A two-phase heuristic algorithm for designing reliable capacitated logistics networks under disruptions
This paper considers the reliable capacitated logistics network design problem (RCLNDP) with system disruptions, which is concerned with locating facilities, constructing transportation links, and allocating their capacities to customers in order to satisfy the demand with minimum expected total cost. Both the facilities and the transportation links are subject to random disruptions, and the expected total cost accounts for the costs of facility location, link construction, and flows in both normal and disrupted conditions. We model this problem as a two-stage stochastic program in which the decision maker establishes plans for facility location and link construction in the first stage (before disruptions are realised) and may choose link flows in the second stage. This is a large-scale mixed-integer optimisation problem and is therefore difficult to solve. Hence, we propose an efficient two-phase heuristic with three possible initial solution-generation methods. [Received 1 November 2015; Revised 3 March 2016; Revised 22 May 2016; Revised 8 June 2016; Accepted 10 June 2016]
- 1 January 2017
- Published by Inderscience Publishers in European J. of Industrial Engineering
- Vol. 11 (4) , 425
A two-phase heuristic algorithm for designing reliable capacitated logistics networks under disruptions
This paper considers the reliable capacitated logistics network design problem (RCLNDP) with system disruptions, which is concerned with locating facilities, constructing transportation links, and allocating their capacities to customers in order to satisfy the demand with minimum expected total cost. Both the facilities and the transportation links are subject to random disruptions, and the expected total cost accounts for the costs of facility location, link construction, and flows in both normal and disrupted conditions. We model this problem as a two-stage stochastic program in which the decision maker establishes plans for facility location and link construction in the first stage (before disruptions are realised) and may choose link flows in the second stage. This is a large-scale mixed-integer optimisation problem and is therefore difficult to solve. Hence, we propose an efficient two-phase heuristic with three possible initial solution-generation methods. [Received 1 November 2015; Revised 3 March 2016; Revised 22 May 2016; Revised 8 June 2016; Accepted 10 June 2016]
- 1 July 2015
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 85, 196-205
Lot sizing and job shop scheduling with compressible process times: A cut and branch approach
- 1 July 2015
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 85, 196-205
Lot sizing and job shop scheduling with compressible process times: A cut and branch approach
- 17 May 2015
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 81 (5-8) , 1139-1154
A group decision-making approach for supplier selection in configuration design: A case study
- 17 May 2015
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 81 (5-8) , 1139-1154
A group decision-making approach for supplier selection in configuration design: A case study
- 1 April 2015
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 35, 246-250
An inventory model with truncated exponential replenishment intervals and special sale offer
- 1 April 2015
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 35, 246-250
An inventory model with truncated exponential replenishment intervals and special sale offer
- 1 February 2015
- Published by Elsevier in Applied Soft Computing
- Vol. 27, 137-147
A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times
- 1 February 2015
- Published by Elsevier in Applied Soft Computing
- Vol. 27, 137-147
A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times
- 5 February 2014
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 28 (5) , 437-450
An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations
Real world final products have almost multilevel structures, where different items are assembled together according to predefined bill of materials. Also, each item must experience a set of processes before assembly according to a given precedence relation between the processes. This paper considers a hybrid flowshop with two stages for processing on items and assembling final products. The first stage is dedicated to processing on items and consists of some non-identical parallel machines. After finishing processing on the items on the first stage, assembly of items into final products starts at the second stage. The production manager desires to minimise the maximum completion time (i.e. makespan). Then, the problem is modelled as an integer linear program and is solved by Lingo. As the problem is NP-hard, an artificial bee colony algorithm along with a genetic algorithm is developed to obtain near-optimal solutions in reasonable run-times. Further, efficiency of the solution methods is examined on different problem instances.
- 5 February 2014
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 28 (5) , 437-450
An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations
Real world final products have almost multilevel structures, where different items are assembled together according to predefined bill of materials. Also, each item must experience a set of processes before assembly according to a given precedence relation between the processes. This paper considers a hybrid flowshop with two stages for processing on items and assembling final products. The first stage is dedicated to processing on items and consists of some non-identical parallel machines. After finishing processing on the items on the first stage, assembly of items into final products starts at the second stage. The production manager desires to minimise the maximum completion time (i.e. makespan). Then, the problem is modelled as an integer linear program and is solved by Lingo. As the problem is NP-hard, an artificial bee colony algorithm along with a genetic algorithm is developed to obtain near-optimal solutions in reasonable run-times. Further, efficiency of the solution methods is examined on different problem instances.
- 1 December 2013
- Published by Elsevier in European Journal of Operational Research
- Vol. 231 (3) , 598-616
Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach
- 1 December 2013
- Published by Elsevier in European Journal of Operational Research
- Vol. 231 (3) , 598-616
Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach
- 22 October 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 52 (8) , 2388-2421
Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection
This paper formulates a new imperfect production problem that generates defectives randomly. The production manager conducts total inspections to screen defectives (including reworkable and non-reworkable items) from non-defectives. But, the inspection is error-prone due to different sources. The model determines rates of main and rework processes, batch size and backlog. As the model is a nonlinear programme and it is difficult to obtain an algebraic closed-form solution, three randomised approximation algorithms are developed. Under certain conditions, the algorithms can find the global optimum in polynomial time. Finally numerical analyses are reported.
- 22 October 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 52 (8) , 2388-2421
Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection
This paper formulates a new imperfect production problem that generates defectives randomly. The production manager conducts total inspections to screen defectives (including reworkable and non-reworkable items) from non-defectives. But, the inspection is error-prone due to different sources. The model determines rates of main and rework processes, batch size and backlog. As the model is a nonlinear programme and it is difficult to obtain an algebraic closed-form solution, three randomised approximation algorithms are developed. Under certain conditions, the algorithms can find the global optimum in polynomial time. Finally numerical analyses are reported.