Jacobus Daniel van der Walt
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jacobus Daniel van der Walt has a total of 26 co-authors. Here are the top co-authors by number of shared publications:
- Eric Scheepbouwer
Univ. of Canterbury
6 shared publications - Tirth Patel
Department of Civil and Natural Resources Engineering, University of Canterbury, Christchurch 8041, New Zealand
5 shared publications Brian Guo
University of Canterbury
3 shared publicationsEric Scheepbouwer
University of Canterbury
3 shared publications- Brian H. W. Guo
University of Canterbury
2 shared publications - Nicola Winter
University of Canterbury
2 shared publications
Latest Publications
- 1 February 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 19 (1)
Institutional Legitimacy and Standard-Form Construction Contracts: Governance Lessons from NZS 3910
Standard-form construction contracts shape more than project risk, they embed governance expectations into procurement systems. Using NZS 3910 as a case study, this paper examines whether a standard contract remains legitimate when the state both authors and predominantly uses it. NZS 3910, the dominant construction contract in New Zealand, is maintained within a state-aligned standards regime and widely used by public entities. This dual role raises concerns about neutrality, trust, and institutional legitimacy. Drawing on doctrinal analysis of New Zealand case law and comparative review of governance models in FIDIC, NEC, and US federal procurement, the paper shows that recent procedural reforms do not resolve the deeper issue of stewardship alignment. The analysis distinguishes structural legitimacy, achieved through independent oversight, from contingent legitimacy grounded in professional conduct. By framing NZS 3910 as governance infrastructure rather than merely a drafting instrument, the paper highlights the institutional stakes of standard-setting in public procurement.
- 1 February 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 19 (1)
Institutional Legitimacy and Standard-Form Construction Contracts: Governance Lessons from NZS 3910
Standard-form construction contracts shape more than project risk, they embed governance expectations into procurement systems. Using NZS 3910 as a case study, this paper examines whether a standard contract remains legitimate when the state both authors and predominantly uses it. NZS 3910, the dominant construction contract in New Zealand, is maintained within a state-aligned standards regime and widely used by public entities. This dual role raises concerns about neutrality, trust, and institutional legitimacy. Drawing on doctrinal analysis of New Zealand case law and comparative review of governance models in FIDIC, NEC, and US federal procurement, the paper shows that recent procedural reforms do not resolve the deeper issue of stewardship alignment. The analysis distinguishes structural legitimacy, achieved through independent oversight, from contingent legitimacy grounded in professional conduct. By framing NZS 3910 as governance infrastructure rather than merely a drafting instrument, the paper highlights the institutional stakes of standard-setting in public procurement.
- Open Access
- 23 October 2026
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- p. 1-25
A system dynamics approach to evaluating the effects of maintenance budget fluctuations on asset condition
- 23 October 2026
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- p. 1-25
Open AccessA system dynamics approach to evaluating the effects of maintenance budget fluctuations on asset condition
- Open Access
- 21 July 2026
- Published by Taylor & Francis in Australasian Journal of Engineering Education
- p. 1-16
Investigating the use of decision logs to preserve institutional knowledge in student-led programmes
1. Student-led organisations have the advantage of being able to stay relevant and evolve as student culture and behaviour evolve over time. An example of this is the student-led Centre for the Enh...
- 21 July 2026
- Published by Taylor & Francis in Australasian Journal of Engineering Education
- p. 1-16
Open AccessInvestigating the use of decision logs to preserve institutional knowledge in student-led programmes
1. Student-led organisations have the advantage of being able to stay relevant and evolve as student culture and behaviour evolve over time. An example of this is the student-led Centre for the Enh...
- 3 April 2026
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 43 (2) , 73-76
Interconnectedness of transportation infrastructure decisions
Transportation infrastructure constitutes the fundamental backbone of global economic development, social connectivity, and urban sustainable operation, serving as a pivotal system that underpins c...
- 3 April 2026
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 43 (2) , 73-76
Interconnectedness of transportation infrastructure decisions
Transportation infrastructure constitutes the fundamental backbone of global economic development, social connectivity, and urban sustainable operation, serving as a pivotal system that underpins c...
- 15 December 2025
- Published by Wiley in Journal of Critical Infrastructure Policy
- Vol. 7 (1)
Uncertainty in the New Zealand Pipeline of Public Infrastructure Work
A pipeline of public infrastructure work is defined as being all the current and upcoming infrastructure projects managed by local and central government. In New Zealand, infrastructure stakeholders have emphasized the need for greater certainty in the pipeline of government‐funded projects. Uncertainty in the flow of future public infrastructure work impedes stakeholder investment, drives up delivery costs, and limits future industry capacity. However, the specific sources of uncertainty in the pipeline of work are not well understood. This study employs systems thinking to identify key factors of pipeline uncertainty, such as funding, timelines, and project priorities, and their effects on stakeholder decisions and industry capacity. A mixed methods approach was utilized in which a content analysis identified the factors and impacts of pipeline uncertainty. Then, a case study examined 441 New Zealand government‐funded projects to validate the content analysis results and demonstrate the impact in the industry. The findings revealed that project timing is the most frequently identified factor of uncertainty associated with a pipeline of work, followed by project funding. The results aligned with industry concern that fluctuating project pipelines disrupt strategic planning and lead to inefficiencies in resource allocation. This study contributes to infrastructure planning research by adopting a holistic systems perspective, emphasizing the need for integrated, long‐term government investment planning to reduce uncertainty and improve sector performance.
- 15 December 2025
- Published by Wiley in Journal of Critical Infrastructure Policy
- Vol. 7 (1)
Uncertainty in the New Zealand Pipeline of Public Infrastructure Work
A pipeline of public infrastructure work is defined as being all the current and upcoming infrastructure projects managed by local and central government. In New Zealand, infrastructure stakeholders have emphasized the need for greater certainty in the pipeline of government‐funded projects. Uncertainty in the flow of future public infrastructure work impedes stakeholder investment, drives up delivery costs, and limits future industry capacity. However, the specific sources of uncertainty in the pipeline of work are not well understood. This study employs systems thinking to identify key factors of pipeline uncertainty, such as funding, timelines, and project priorities, and their effects on stakeholder decisions and industry capacity. A mixed methods approach was utilized in which a content analysis identified the factors and impacts of pipeline uncertainty. Then, a case study examined 441 New Zealand government‐funded projects to validate the content analysis results and demonstrate the impact in the industry. The findings revealed that project timing is the most frequently identified factor of uncertainty associated with a pipeline of work, followed by project funding. The results aligned with industry concern that fluctuating project pipelines disrupt strategic planning and lead to inefficiencies in resource allocation. This study contributes to infrastructure planning research by adopting a holistic systems perspective, emphasizing the need for integrated, long‐term government investment planning to reduce uncertainty and improve sector performance.
- Open Access
- 26 September 2025
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 32 (13) , 362-383
Managing client-contractors’ working relationship in construction projects: a holistic approach
Purpose: The client-contractor relationship is pivotal in construction projects, as the contractor is responsible for executing the client’s vision while managing the operational aspects of construction. A successful client-contractor relationship can facilitate resource allocation, streamline decision-making, and enhance project performance. However, clients typically aim for projects to be completed on time, within budget and at a high quality, while contractors often focus on minimising risks and maximising profit. This divergence in priorities can lead to disputes over issues such as cost overruns, delays, and variations in project scope. This fundamental misalignment often results in adversarial relationships rather than collaborative partnerships, ultimately impeding project efficiency and sometimes leading to prolonged legal disputes. This paper, therefore, aims to address these specific practical issues by focusing on the relationship between client and contractor and provides recommendations to manage this relationship effectively. Design/methodology/approach: Along with a thorough review of the literature, semi-structured interviews were conducted with experienced practitioners in the Norwegian construction industry. A total of 22 interviews were carried out with key professionals, including project managers and contract specialists, representing diverse organisational roles from the client side, consultants and contractors. This diverse participant pool was intentionally selected to gain a comprehensive, multi-stakeholder perspective on industry practices and challenges. The interviews were conducted either in-person or via video conferencing, each lasting roughly one hour, and followed a standardised interview guide while allowing flexibility for open-ended discussion. The majority of participants had over 10 years of professional experience in project-based environments, while three individuals had between 5 and 10 years of experience as project managers. Participants were selected using purposive sampling to ensure relevance and depth of insight, and all interviews were recorded, transcribed verbatim and analysed using thematic analysis to identify recurring patterns and viewpoints. Findings: The findings of this study underscore the importance of structured and multifaceted relationship management practices between clients and contractors in achieving successful project outcomes within the construction industry. Relationship management strategies at both the organisational and project team levels are essential to fostering collaboration, communication, and effective resource use among diverse stakeholders. The emphasis on communication management is shown to be instrumental in establishing trust and facilitating transparency across project teams. Similarly, information-sharing protocols and risk management frameworks allow for collaborative handling of risks, ultimately enhancing resilience and accountability in project delivery. Research limitations/implications: Participants in this study, both the clients and contractors, were all within Norwegian organisations. Although they had several experiences working on construction projects locally and internationally, their response was mainly influenced by their culture, mindsets and Norwegian construction norms and standards. Further research is recommended to explore the perceptions of experts in the construction industry from different countries with diverse cultures and standards. Practical implications: This study makes theoretical and practical contributions to the construction engineering and management body of knowledge by classifying relationship management practices at both the organisational and project team levels. This study offers a structured framework that provides practitioners and researchers with actionable insights into enhancing collaboration and communication in complex environments. Additionally, this paper adds depth to existing literature by highlighting the role of behavioural and interpersonal factors. These insights contribute to a more holistic understanding of relationship management in construction projects and set a foundation for further research into how these strategies can be tailored to different project contexts. Originality/value: To bring a better perspective on the relationship between clients and contractors, a holistic approach is utilised in this study to ensure that factors from all relevant perspectives are considered, understood and dealt with. The holistic approach enabled the development of a conceptual model, which provides a method to yield more insightful and relevant findings, given the complexity of managing the relationship between client and contractor.
- 26 September 2025
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 32 (13) , 362-383
Open AccessManaging client-contractors’ working relationship in construction projects: a holistic approach
Purpose: The client-contractor relationship is pivotal in construction projects, as the contractor is responsible for executing the client’s vision while managing the operational aspects of construction. A successful client-contractor relationship can facilitate resource allocation, streamline decision-making, and enhance project performance. However, clients typically aim for projects to be completed on time, within budget and at a high quality, while contractors often focus on minimising risks and maximising profit. This divergence in priorities can lead to disputes over issues such as cost overruns, delays, and variations in project scope. This fundamental misalignment often results in adversarial relationships rather than collaborative partnerships, ultimately impeding project efficiency and sometimes leading to prolonged legal disputes. This paper, therefore, aims to address these specific practical issues by focusing on the relationship between client and contractor and provides recommendations to manage this relationship effectively. Design/methodology/approach: Along with a thorough review of the literature, semi-structured interviews were conducted with experienced practitioners in the Norwegian construction industry. A total of 22 interviews were carried out with key professionals, including project managers and contract specialists, representing diverse organisational roles from the client side, consultants and contractors. This diverse participant pool was intentionally selected to gain a comprehensive, multi-stakeholder perspective on industry practices and challenges. The interviews were conducted either in-person or via video conferencing, each lasting roughly one hour, and followed a standardised interview guide while allowing flexibility for open-ended discussion. The majority of participants had over 10 years of professional experience in project-based environments, while three individuals had between 5 and 10 years of experience as project managers. Participants were selected using purposive sampling to ensure relevance and depth of insight, and all interviews were recorded, transcribed verbatim and analysed using thematic analysis to identify recurring patterns and viewpoints. Findings: The findings of this study underscore the importance of structured and multifaceted relationship management practices between clients and contractors in achieving successful project outcomes within the construction industry. Relationship management strategies at both the organisational and project team levels are essential to fostering collaboration, communication, and effective resource use among diverse stakeholders. The emphasis on communication management is shown to be instrumental in establishing trust and facilitating transparency across project teams. Similarly, information-sharing protocols and risk management frameworks allow for collaborative handling of risks, ultimately enhancing resilience and accountability in project delivery. Research limitations/implications: Participants in this study, both the clients and contractors, were all within Norwegian organisations. Although they had several experiences working on construction projects locally and internationally, their response was mainly influenced by their culture, mindsets and Norwegian construction norms and standards. Further research is recommended to explore the perceptions of experts in the construction industry from different countries with diverse cultures and standards. Practical implications: This study makes theoretical and practical contributions to the construction engineering and management body of knowledge by classifying relationship management practices at both the organisational and project team levels. This study offers a structured framework that provides practitioners and researchers with actionable insights into enhancing collaboration and communication in complex environments. Additionally, this paper adds depth to existing literature by highlighting the role of behavioural and interpersonal factors. These insights contribute to a more holistic understanding of relationship management in construction projects and set a foundation for further research into how these strategies can be tailored to different project contexts. Originality/value: To bring a better perspective on the relationship between clients and contractors, a holistic approach is utilised in this study to ensure that factors from all relevant perspectives are considered, understood and dealt with. The holistic approach enabled the development of a conceptual model, which provides a method to yield more insightful and relevant findings, given the complexity of managing the relationship between client and contractor.
- 2 July 2025
- Published by Springer Nature
- p. 163-175
Enhancing Construction Capacity with an Integrated Ontology-Driven Approach
- 2 July 2025
- Published by Springer Nature
- p. 163-175
Enhancing Construction Capacity with an Integrated Ontology-Driven Approach
- Open Access
- 19 June 2025
- Published by Purdue University (bepress) in CIB Conferences
- Vol. 1 (1) , 325
Proactive Risk Identification in New Zealand Infrastructure Projects: A Machine Learning Approach to Classifying Project Risk
In the construction industry, proactive identification and management of challenges such as delays, budget constraints, and regulatory hurdles are essential for effective risk management and successful project delivery. Traditional methods, relying on manual analysis and expert judgment, are often time-consuming, inconsistent, and subjective. This study proposes a data-driven framework to automate the identification and classification of challenges within project descriptions using Natural Language Processing (NLP) and machine learning (ML) techniques. Utilizing the Pacificon dataset, comprising 254,923 infrastructure projects across New Zealand, the study defines challenge categories through regular expressions and implements a machine learning pipeline with TfidfVectorizer and Logistic Regression. The framework achieves a cross-validation mean accuracy of 74.6%, demonstrating robustness and reliability. Experimental results highlight strong performance in categories like regulatory hurdles and budget constraints while identifying areas for improvement, such as environmental factors. By automating challenge identification, the framework reduces reliance on manual risk assessments, enhances consistency, and enables early intervention for improved project management outcomes. This research contributes to the digital transformation of construction risk management, offering scalable, data-driven solutions aligned with industry demands for efficiency and precision in managing project complexities.
- 19 June 2025
- Published by Purdue University (bepress) in CIB Conferences
- Vol. 1 (1) , 325
Open AccessProactive Risk Identification in New Zealand Infrastructure Projects: A Machine Learning Approach to Classifying Project Risk
In the construction industry, proactive identification and management of challenges such as delays, budget constraints, and regulatory hurdles are essential for effective risk management and successful project delivery. Traditional methods, relying on manual analysis and expert judgment, are often time-consuming, inconsistent, and subjective. This study proposes a data-driven framework to automate the identification and classification of challenges within project descriptions using Natural Language Processing (NLP) and machine learning (ML) techniques. Utilizing the Pacificon dataset, comprising 254,923 infrastructure projects across New Zealand, the study defines challenge categories through regular expressions and implements a machine learning pipeline with TfidfVectorizer and Logistic Regression. The framework achieves a cross-validation mean accuracy of 74.6%, demonstrating robustness and reliability. Experimental results highlight strong performance in categories like regulatory hurdles and budget constraints while identifying areas for improvement, such as environmental factors. By automating challenge identification, the framework reduces reliance on manual risk assessments, enhances consistency, and enables early intervention for improved project management outcomes. This research contributes to the digital transformation of construction risk management, offering scalable, data-driven solutions aligned with industry demands for efficiency and precision in managing project complexities.
- Open Access
- 1 January 2025
- Published by Wiley in Advances in Civil Engineering
- Vol. 2025 (1)
Roadway Culvert Asset Management: Systematic Review and Future Research Directions
Culverts are essential for the sustainability and safety of transportation infrastructure. Despite their significance, they are often insufficiently managed, leading to significant socioeconomic and environmental repercussions. This systematic review critically evaluates the current state of roadway culvert asset management (RCAM), focusing on inspection technologies, factors influencing culvert deterioration, and predictive models for condition forecasting. Using the Preferred Reporting Items for Systematic Reviews and Meta‐Analyses (PRISMA) methodology, this review synthesizes findings from 86 key studies published between 1988 and 2023, sourced from Scopus, ScienceDirect, and Google Scholar. By employing scientometric mapping research trends and keyword relationships within RCAM are determined. The review identifies critical limitations in existing practices, including a predominant reliance on labor‐intensive and subjective inspections, and the absence of real‐time data integration in predictive models. These gaps lead to delayed interventions, escalating risks of costly infrastructure failures, such as roadway collapses. The integration of cost‐effective advanced sensor technologies and machine learning algorithms for real‐time monitoring and predictive analytics emerges as a transformative solution. This study underscores the urgent need to adopt these technologies in RCAM to enhance infrastructure sustainability, reduce maintenance costs, and mitigate catastrophic failures.
- 1 January 2025
- Published by Wiley in Advances in Civil Engineering
- Vol. 2025 (1)
Open AccessRoadway Culvert Asset Management: Systematic Review and Future Research Directions
Culverts are essential for the sustainability and safety of transportation infrastructure. Despite their significance, they are often insufficiently managed, leading to significant socioeconomic and environmental repercussions. This systematic review critically evaluates the current state of roadway culvert asset management (RCAM), focusing on inspection technologies, factors influencing culvert deterioration, and predictive models for condition forecasting. Using the Preferred Reporting Items for Systematic Reviews and Meta‐Analyses (PRISMA) methodology, this review synthesizes findings from 86 key studies published between 1988 and 2023, sourced from Scopus, ScienceDirect, and Google Scholar. By employing scientometric mapping research trends and keyword relationships within RCAM are determined. The review identifies critical limitations in existing practices, including a predominant reliance on labor‐intensive and subjective inspections, and the absence of real‐time data integration in predictive models. These gaps lead to delayed interventions, escalating risks of costly infrastructure failures, such as roadway collapses. The integration of cost‐effective advanced sensor technologies and machine learning algorithms for real‐time monitoring and predictive analytics emerges as a transformative solution. This study underscores the urgent need to adopt these technologies in RCAM to enhance infrastructure sustainability, reduce maintenance costs, and mitigate catastrophic failures.
- 25 November 2024
- Published by Canadian Science Publishing in Canadian Journal of Civil Engineering
Examining the lateral positioning and clearance of cyclists and motor vehicles in Christchurch, New Zealand
The New Zealand government has introduced cycleways on existing narrow roads, leading to disruptions and inconsistencies for both motorists and cyclists. The effect on their behaviour about positioning, however, remains uncertain. This research paper investigated lateral positioning and lateral clearance using multiple Internet of Things prototypes to quantify the relationship between motor vehicles and cyclists. Two methods were used: (1) sensors mounted on the pavement curb to collect positioning data, and (2) sensors mounted on a cyclist to collect lateral clearance data. Results show that heavy vehicles have the highest encroachment rate. Additionally, the cycleway helps steer motorists slightly farther away from cyclists while passing. The lateral clearance between cyclists and motorists on roads with cycle lanes is higher than on roads without cycle lanes. It was found that over 90% of motor vehicles meet the 1 m separation standard, as recommended by the NZ Cycling Safety Panel.
- 25 November 2024
- Published by Canadian Science Publishing in Canadian Journal of Civil Engineering
Examining the lateral positioning and clearance of cyclists and motor vehicles in Christchurch, New Zealand
The New Zealand government has introduced cycleways on existing narrow roads, leading to disruptions and inconsistencies for both motorists and cyclists. The effect on their behaviour about positioning, however, remains uncertain. This research paper investigated lateral positioning and lateral clearance using multiple Internet of Things prototypes to quantify the relationship between motor vehicles and cyclists. Two methods were used: (1) sensors mounted on the pavement curb to collect positioning data, and (2) sensors mounted on a cyclist to collect lateral clearance data. Results show that heavy vehicles have the highest encroachment rate. Additionally, the cycleway helps steer motorists slightly farther away from cyclists while passing. The lateral clearance between cyclists and motorists on roads with cycle lanes is higher than on roads without cycle lanes. It was found that over 90% of motor vehicles meet the 1 m separation standard, as recommended by the NZ Cycling Safety Panel.