Daniel A. Contreras
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Daniel A. Contreras has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
- Krzysztof Rudion
Institute of Power Transmission and High Voltage Technology (IEH), University of Stuttgart, 70569 Stuttgart, Germany
5 shared publications A. von Haken
1 shared publicationB. Surmann
1 shared publication- Bárbara Fuentes
Universidad Católica del Norte
1 shared publication Christian Lakenbrink
Netze BW GmbH,Stuttgart,Germany
1 shared publicationDaniel Groß
Institute of Power Transmission and High Voltage Technology, University of Stuttgart,Stuttgart,Germany
1 shared publication
Latest Publications
- Open Access
Water-dispersible colloids distribution along an alluvial fan transect in hyper-arid Atacama Desert
- 18 July 2022
- Published by Elsevier in Electric Power Systems Research
- Vol. 212
An iterative quota calculation method for congestion management and optimal grid utilization
- 18 July 2022
- Published by Elsevier in Electric Power Systems Research
- Vol. 212
An iterative quota calculation method for congestion management and optimal grid utilization
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Evaluation of a Three-Phase Distribution System State Estimation for Operational Use in a Real Medium Voltage Grid
The aim of the presented work is to develop an approach for the proper assessment of pseudo measurements for a three-phase distribution system state estimation under the conditions of a real medium voltage grid. The evaluation is based on the validation of the voltage estimation error, which describes the difference between the calculated node voltages determined by the distribution system state estimation and the actually measured node voltages, as a measure of the quality of the calculated results. By replacing real measurement values with pseudo measurements, the influence on the quality of the three-phase distribution system state estimation for incomplete measurement acquisition will be investigated. For this purpose, customizable synthetic profiles are used to replace real power values in this work.
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Evaluation of a Three-Phase Distribution System State Estimation for Operational Use in a Real Medium Voltage Grid
The aim of the presented work is to develop an approach for the proper assessment of pseudo measurements for a three-phase distribution system state estimation under the conditions of a real medium voltage grid. The evaluation is based on the validation of the voltage estimation error, which describes the difference between the calculated node voltages determined by the distribution system state estimation and the actually measured node voltages, as a measure of the quality of the calculated results. By replacing real measurement values with pseudo measurements, the influence on the quality of the three-phase distribution system state estimation for incomplete measurement acquisition will be investigated. For this purpose, customizable synthetic profiles are used to replace real power values in this work.
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Impact of Grid Topology and Tap Position Changes on the Flexibility Provision from Distribution Grids
With increasing penetration of DER in distribution grids, the use of flexibility provided by these new resources for ancillary services is gaining relevance. Changes in the topology of a distribution grid can influence the provision of flexibility, since grid constraints are modified. Therefore, the impact of operating radial and meshed grids is assessed in this paper. A method to aggregate the flexibility provision within a distribution grid is used to quantify this impact. A case study was performed using the adapted CIGRE MV test-bench grid. The feasible operation region of a grid was calculated under several discrete switching combinations, combined with a transformer with tap changer. Results showed that grids with meshed topologies have an increased ability to provide flexibility, due to the homogenization of power flows among the branches. Critical scenarios were observed in radial structures with large branch distances.
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Impact of Grid Topology and Tap Position Changes on the Flexibility Provision from Distribution Grids
With increasing penetration of DER in distribution grids, the use of flexibility provided by these new resources for ancillary services is gaining relevance. Changes in the topology of a distribution grid can influence the provision of flexibility, since grid constraints are modified. Therefore, the impact of operating radial and meshed grids is assessed in this paper. A method to aggregate the flexibility provision within a distribution grid is used to quantify this impact. A case study was performed using the adapted CIGRE MV test-bench grid. The feasible operation region of a grid was calculated under several discrete switching combinations, combined with a transformer with tap changer. Results showed that grids with meshed topologies have an increased ability to provide flexibility, due to the homogenization of power flows among the branches. Critical scenarios were observed in radial structures with large branch distances.
- 1 August 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Time-Based Aggregation of Flexibility at the TSO-DSO Interconnection Point
This paper presents a new approach to consider the time-dependent provision of flexibility by RES. In order to achieve an advanced coordination level between grid operators it is essential to consider the increasing penetration of DER, especially at the lower voltage levels. Massive amounts of information are required to reach a complete observability of the grid, therefore, different methodologies to aggregate flexibility within distribution grids have been proposed. In this case, the modelling of Flexibility Providing Units is adapted to consider time-series, while the aggregation process is repeated for several time-steps, which is essential for short-term operation planning of power systems. The proposed method is applied to the European CIGRE MV Grid for two scenarios, a typical summer and winter day. Results show that the load profile over a specific time, the reactive power requirements and the amount of flexibility provided within a grid play major roles in the probability distribution of the operating points of the grid. This has a direct influence on the definition of predefined schedules at the TSO-DSO interconnection point.
- 1 August 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Time-Based Aggregation of Flexibility at the TSO-DSO Interconnection Point
This paper presents a new approach to consider the time-dependent provision of flexibility by RES. In order to achieve an advanced coordination level between grid operators it is essential to consider the increasing penetration of DER, especially at the lower voltage levels. Massive amounts of information are required to reach a complete observability of the grid, therefore, different methodologies to aggregate flexibility within distribution grids have been proposed. In this case, the modelling of Flexibility Providing Units is adapted to consider time-series, while the aggregation process is repeated for several time-steps, which is essential for short-term operation planning of power systems. The proposed method is applied to the European CIGRE MV Grid for two scenarios, a typical summer and winter day. Results show that the load profile over a specific time, the reactive power requirements and the amount of flexibility provided within a grid play major roles in the probability distribution of the operating points of the grid. This has a direct influence on the definition of predefined schedules at the TSO-DSO interconnection point.
- 1 June 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Verification of Linear Flexibility Range Assessment in Distribution Grids
Grid operators are required to ensure the secure and stable operation of the power grid. With increasing penetration of distributed generation in the grid, especially at lower voltage levels, this task is becoming more complex for system operators, leading to the need of an improvement in their coordination efforts. To tackle this issue, different methodologies to present the flexibility provision within a distribution grid in an aggregated manner have been developed. This paper focuses on validating the results provided by such aggregation algorithms. A random sampling approach is used to validate the obtained flexibility range of a distribution grid obtained through a previously developed linear optimal power flow algorithm. By means of a ‘beta’ instead of a ‘uniform’ distribution for the selection of the random variables, the flexibility ranges become comparable and a validation of the results is applicable. A case study is performed using the CIGRE test-bench grid. Results show that optimization-based aggregation algorithms can provide accurate results, while respecting grid constraints and showing a convex behavior.
- 1 June 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Verification of Linear Flexibility Range Assessment in Distribution Grids
Grid operators are required to ensure the secure and stable operation of the power grid. With increasing penetration of distributed generation in the grid, especially at lower voltage levels, this task is becoming more complex for system operators, leading to the need of an improvement in their coordination efforts. To tackle this issue, different methodologies to present the flexibility provision within a distribution grid in an aggregated manner have been developed. This paper focuses on validating the results provided by such aggregation algorithms. A random sampling approach is used to validate the obtained flexibility range of a distribution grid obtained through a previously developed linear optimal power flow algorithm. By means of a ‘beta’ instead of a ‘uniform’ distribution for the selection of the random variables, the flexibility ranges become comparable and a validation of the results is applicable. A case study is performed using the CIGRE test-bench grid. Results show that optimization-based aggregation algorithms can provide accurate results, while respecting grid constraints and showing a convex behavior.
- 1 June 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Hardware-in-the-loop test bench for investigation of DER integration strategies within a multi-agent-based environment
Concept and implementation of a test bench for investigation of new grid integration strategies of distributed energy resources (DER) is presented. It focuses on a multi-agent-based architecture of the system as analyzed within the Callia project. The goal of the project is to achieve an optimal control of the local flexibilities in order to avoid congestions within the grid. The presented test bench is based on the hardware-in-the-loop technology and includes a numeric real-time-capable model of the power grid and a decentralized multi-agent (MA) platform hosted on external hardware units. Performed simulations are part of the preparation for the field tests to be carried out within the Callia project.
- 1 June 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Hardware-in-the-loop test bench for investigation of DER integration strategies within a multi-agent-based environment
Concept and implementation of a test bench for investigation of new grid integration strategies of distributed energy resources (DER) is presented. It focuses on a multi-agent-based architecture of the system as analyzed within the Callia project. The goal of the project is to achieve an optimal control of the local flexibilities in order to avoid congestions within the grid. The presented test bench is based on the hardware-in-the-loop technology and includes a numeric real-time-capable model of the power grid and a decentralized multi-agent (MA) platform hosted on external hardware units. Performed simulations are part of the preparation for the field tests to be carried out within the Callia project.