Michael Grenn
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Michael Grenn has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Amir Hossein Etemadi
Department of Electrical and Computer Engineering, The George Washington University, Washington, DC, USA
1 shared publication - Blake Roberts
Department of Engineering Management and Systems Engineering, The George Washington University, Washington, DC 20052 USA
1 shared publication - Blake Roberts
George Washington University, Washington, DC 20052 USA ( blakegw@.gwu.edu)
1 shared publication - Fatma Nur Yeasin
George Washington University, Washington, DC 20052 USA
1 shared publication - Johnathan A. Jordan
Space and Missile System Center Data Program Office, U.S. Space Force, Peterson AFB, CO, USA
1 shared publication - Peiming Li
Department of Engineering Management and Systems Engineering, George Washington University, Washington, USA
1 shared publication
Latest Publications
- Open Access
- 23 February 2026
- Published by Springer Nature in Discover Computing
- Vol. 29 (1) , 111
Robust federated learning through decentralized adaptive oracle consensus
- 23 February 2026
- Published by Springer Nature in Discover Computing
- Vol. 29 (1) , 111
Open AccessRobust federated learning through decentralized adaptive oracle consensus
- 11 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 69 (6) , 3864-3873
Predicting KC-135R Aircraft Availability With Aircraft Metrics
The KC-135R Stratotanker is a multifunction slim body aircraft that provides air refueling and airlift for the United States’ war and peacetime requirements, which demand a certain level of availability. As the KC-135R fleet ages, the aircraft availability (AA) rate degrades due to high demand use, stress, and the age of the equipment. Preventative and corrective maintenance is designed to return the aircraft to an available state to meet mission requirements, but the United States Air Force continues to fail at meeting every requirement communicated by commanders for KC-135R air refueling and airlift. Focusing on aircraft metrics can enable a prediction model of AA and provide the unit commanders the tools for data influenced decisions. The analysis of historical aircraft maintenance and flight metrics will show a correlation between tracked metrics and AA, thus, the ability to predict a future availability rate. Furthermore, analyzing the data with machine learning techniques will improve prediction accuracy by evaluating the variable importance and will make inferences learned from mining the data that are otherwise difficult to model in a complex system of systems.
- 11 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 69 (6) , 3864-3873
Predicting KC-135R Aircraft Availability With Aircraft Metrics
The KC-135R Stratotanker is a multifunction slim body aircraft that provides air refueling and airlift for the United States’ war and peacetime requirements, which demand a certain level of availability. As the KC-135R fleet ages, the aircraft availability (AA) rate degrades due to high demand use, stress, and the age of the equipment. Preventative and corrective maintenance is designed to return the aircraft to an available state to meet mission requirements, but the United States Air Force continues to fail at meeting every requirement communicated by commanders for KC-135R air refueling and airlift. Focusing on aircraft metrics can enable a prediction model of AA and provide the unit commanders the tools for data influenced decisions. The analysis of historical aircraft maintenance and flight metrics will show a correlation between tracked metrics and AA, thus, the ability to predict a future availability rate. Furthermore, analyzing the data with machine learning techniques will improve prediction accuracy by evaluating the variable importance and will make inferences learned from mining the data that are otherwise difficult to model in a complex system of systems.
- 23 January 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 67 (3) , 869-884
A Bayesian Networks Approach to Estimate Engineering Change Propagation Risk and Duration
An engineering change (EC) is an alteration made to a system that has been released following a system design process. EC propagation is a series of ECs occurring due to dependencies among components of a product. ECs can consume up to 50% of the overall engineering efforts during the development of a complex system. Therefore, EC propagation prediction received considerable attention in past decades as the product development industries started to suffer from the negative impacts of change propagation. This paper evaluates the current approaches to EC propagation prediction and presents a dynamic Bayesian networks (DBNs) approach to estimate change propagation risk (CPR) as well as a novel approach to estimate EC durations. Literature research shows that although some studies have used design structure matrices to estimate CPR and the total redesign duration (TRD) due to change propagation, an approach that allows iteration while accounting for the conjunction of all impacts has not been explored. This paper aims to fill the gaps for calculating CPR using DBN and evaluating change propagation paths from a Split-and task outcome logic, which accounts for the conjunction of all component relationships. This paper compares the proposed method results with the existing CPR and engineering change duration estimation methods using a real-world dataset from a U.S. Navy shipbuilding program. The results indicate that the CPR can be calculated using the proposed method without the shortcomings of the existing method and the accuracy for estimating engineering change durations is increased.
- 23 January 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 67 (3) , 869-884
A Bayesian Networks Approach to Estimate Engineering Change Propagation Risk and Duration
An engineering change (EC) is an alteration made to a system that has been released following a system design process. EC propagation is a series of ECs occurring due to dependencies among components of a product. ECs can consume up to 50% of the overall engineering efforts during the development of a complex system. Therefore, EC propagation prediction received considerable attention in past decades as the product development industries started to suffer from the negative impacts of change propagation. This paper evaluates the current approaches to EC propagation prediction and presents a dynamic Bayesian networks (DBNs) approach to estimate change propagation risk (CPR) as well as a novel approach to estimate EC durations. Literature research shows that although some studies have used design structure matrices to estimate CPR and the total redesign duration (TRD) due to change propagation, an approach that allows iteration while accounting for the conjunction of all impacts has not been explored. This paper aims to fill the gaps for calculating CPR using DBN and evaluating change propagation paths from a Split-and task outcome logic, which accounts for the conjunction of all component relationships. This paper compares the proposed method results with the existing CPR and engineering change duration estimation methods using a real-world dataset from a U.S. Navy shipbuilding program. The results indicate that the CPR can be calculated using the proposed method without the shortcomings of the existing method and the accuracy for estimating engineering change durations is increased.
- 14 September 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 67 (1) , 122-140
Improving System Maturity Assessments by Incorporating a Design Structure Matrix
This paper evaluates a design structure matrix (DSM) as a new approach for assessing the system readiness level (SRL) of complex systems. A framework to demonstrate how a current SRL calculation method can be incorporated into the DSM tool is presented to demonstrate the benefits of DSMs for improved confidence in system readiness assessments. A cross-comparison of the modeled system readiness results obtained with a current SRL approach with nesting assumptions and the proposed DSM approach suggests that the DSM approach provides more accurate results and may be more practical for complex system analysis. The application of the DSM approach to a real-world example is also presented to demonstrate how a DSM framework facilitates the decision-making process for system readiness assessment by providing a more evidence-based maturity assessment for complex systems. The DSM approach discussed in this research can be easily adopted by program managers and practitioners for a wide range of complex systems and system architectures with multiple subsystem components.
- 14 September 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 67 (1) , 122-140
Improving System Maturity Assessments by Incorporating a Design Structure Matrix
This paper evaluates a design structure matrix (DSM) as a new approach for assessing the system readiness level (SRL) of complex systems. A framework to demonstrate how a current SRL calculation method can be incorporated into the DSM tool is presented to demonstrate the benefits of DSMs for improved confidence in system readiness assessments. A cross-comparison of the modeled system readiness results obtained with a current SRL approach with nesting assumptions and the proposed DSM approach suggests that the DSM approach provides more accurate results and may be more practical for complex system analysis. The application of the DSM approach to a real-world example is also presented to demonstrate how a DSM framework facilitates the decision-making process for system readiness assessment by providing a more evidence-based maturity assessment for complex systems. The DSM approach discussed in this research can be easily adopted by program managers and practitioners for a wide range of complex systems and system architectures with multiple subsystem components.