Naeem Mangi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Naeem Mangi has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
Dildar Ali Mangnejo
8 shared publications- Mukhtiar Ali Soomro
School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, China
5 shared publications - Zhen-Dong Cui
State Key Laboratory of Intelligent Construction and Healthy Operation & Maintenance of Deep Underground Engineering, School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, China
4 shared publications - Kai Liu
Shenzhen Univ
3 shared publications Mukhtiar Ali Soomro
3 shared publicationsAbdullah Saand
Quaid-e-Awam University of Engineering, Science & Technology, Nawabshah, Sindh, Pakistan
2 shared publications
Latest Publications
- 22 September 2025
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 168
Stress redistribution and deformation mechanisms in piled embankments subjected to excavation in clay
- 22 September 2025
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 168
Stress redistribution and deformation mechanisms in piled embankments subjected to excavation in clay
- 18 April 2024
- Published by Elsevier in Computers and Geotechnics
- Vol. 171
Evaluation of response mechanisms in an elevated pile group subjected to lateral loading caused by twin-tunnelling
- 18 April 2024
- Published by Elsevier in Computers and Geotechnics
- Vol. 171
Evaluation of response mechanisms in an elevated pile group subjected to lateral loading caused by twin-tunnelling
- 1 June 2022
- Published by American Society of Civil Engineers (ASCE) in International Journal of Geomechanics
- Vol. 22 (6) , 04022079
Parametric Study of Twin Tunneling Effects on Piled Foundations in Stiff Clay: 3D Finite-Element Approach
Due to urbanization, development of society, and growth of population, there are new demands for tunneling technique to facilitate the public transport as well as high-rise buildings to accommodate an increasing population. Piled foundations are commonly preferred for the construction of high-rise buildings. It is, therefore, unavoidable that tunnels must be constructed near extant buildings resting on piled foundations. Inevitable movement of the ground due to stress changes induced by a tunnel can induce additional settlement and reduce the load-carrying capacity of nearby pile foundation systems. This numerical parametric study investigates the responses of two-by-two piled raft to twin side-by-side tunnels either near the mid-depth of the pile shaft or adjacent to or below the pile toe in stiff clay. In addition, it investigates the effects of different group configurations of the piled raft and elevated pile group. The ground in all the finite-element analyses was modeled using the hypoplasticity (clay) model because of its ability to capture degradation of soil stiffness at a small-strain level. Twin tunneling below the pile and near the middepth of the pile shaft caused the largest and smallest settlement of the piled raft, respectively. Unlike induced piled raft settlement, the most significant transverse tilting of the raft is induced after the advancement of the first tunnel. After the twin tunneling near the pile shaft was completed, the raft was separated from the ground, and a portion of the working load carried by the raft was transferred to the piles. The computed results have revealed that the induced settlement of the elevated pile group was significantly larger than that of the piled raft. A significant effect number of piles in the group was found on the piled raft responses to tunneling.
- 1 June 2022
- Published by American Society of Civil Engineers (ASCE) in International Journal of Geomechanics
- Vol. 22 (6) , 04022079
Parametric Study of Twin Tunneling Effects on Piled Foundations in Stiff Clay: 3D Finite-Element Approach
Due to urbanization, development of society, and growth of population, there are new demands for tunneling technique to facilitate the public transport as well as high-rise buildings to accommodate an increasing population. Piled foundations are commonly preferred for the construction of high-rise buildings. It is, therefore, unavoidable that tunnels must be constructed near extant buildings resting on piled foundations. Inevitable movement of the ground due to stress changes induced by a tunnel can induce additional settlement and reduce the load-carrying capacity of nearby pile foundation systems. This numerical parametric study investigates the responses of two-by-two piled raft to twin side-by-side tunnels either near the mid-depth of the pile shaft or adjacent to or below the pile toe in stiff clay. In addition, it investigates the effects of different group configurations of the piled raft and elevated pile group. The ground in all the finite-element analyses was modeled using the hypoplasticity (clay) model because of its ability to capture degradation of soil stiffness at a small-strain level. Twin tunneling below the pile and near the middepth of the pile shaft caused the largest and smallest settlement of the piled raft, respectively. Unlike induced piled raft settlement, the most significant transverse tilting of the raft is induced after the advancement of the first tunnel. After the twin tunneling near the pile shaft was completed, the raft was separated from the ground, and a portion of the working load carried by the raft was transferred to the piles. The computed results have revealed that the induced settlement of the elevated pile group was significantly larger than that of the piled raft. A significant effect number of piles in the group was found on the piled raft responses to tunneling.
- 18 December 2019
- Published by Taylor & Francis in European Journal of Environmental and Civil Engineering
- Vol. 26 (3) , 1064-1096
Numerical Parametric Study of Settlement and Load Transfer Mechanism of Pile Group Due to Twin Stacked Tunnelling with Different Construction Sequences
Construction of tunnels in urban cities may induce excessive settlement and tilting of nearby existing pile foundations. In this study, numerical parametric study was conducted to investigate the influences of twin stacked tunnelling with different construction sequences on an existing (2 × 2) pile group. Twin stacked tunnelling was simulated one after the other with the first tunnel excavated near the mid-depth of the pile shaft and the second either next to the toe of the pile (case ST) or below the pile (case SB). In addition, two more analyses were performed with change of construction sequence of twin stacked tunnels (i.e. cases TS and BS). The first tunnel was excavated either near the pile toe (case TS) or below the pile (case BS) and second tunnel near the mid-depth of the pile shaft. The different construction sequence of twin stacked tunnels at different depth had a limited effect on induced pile group settlement, tilting, lateral deflection and load transfer mechanism. The computed cumulative pile group settlement was about 22% larger for tunnelling sequence TS than for tunnelling sequence TS.
- 18 December 2019
- Published by Taylor & Francis in European Journal of Environmental and Civil Engineering
- Vol. 26 (3) , 1064-1096
Numerical Parametric Study of Settlement and Load Transfer Mechanism of Pile Group Due to Twin Stacked Tunnelling with Different Construction Sequences
Construction of tunnels in urban cities may induce excessive settlement and tilting of nearby existing pile foundations. In this study, numerical parametric study was conducted to investigate the influences of twin stacked tunnelling with different construction sequences on an existing (2 × 2) pile group. Twin stacked tunnelling was simulated one after the other with the first tunnel excavated near the mid-depth of the pile shaft and the second either next to the toe of the pile (case ST) or below the pile (case SB). In addition, two more analyses were performed with change of construction sequence of twin stacked tunnels (i.e. cases TS and BS). The first tunnel was excavated either near the pile toe (case TS) or below the pile (case BS) and second tunnel near the mid-depth of the pile shaft. The different construction sequence of twin stacked tunnels at different depth had a limited effect on induced pile group settlement, tilting, lateral deflection and load transfer mechanism. The computed cumulative pile group settlement was about 22% larger for tunnelling sequence TS than for tunnelling sequence TS.
- Open Access
- 7 October 2019
- Published by Ital Publication in Civil Engineering Journal
- Vol. 5 (10) , 2233-2246
Analysis for Stabilization of Soil Slope in Silty Soil with Replacement of Soil Cement
The slope instability may result due to change in stress conditions, rise in groundwater and rainfall. Similarly, many slopes that have been stable for many years may suddenly fail due to loss of soil shear strength, and external forces. This is a crucial problem as it may destroy buildings, damage roads, and even leads to loss of human life. So it is imperative to understand failure mechanism and adopt safety measures to prevent such failures. The objective of this study is to analyze the slope at different angles (at 300, 350, 450 & 600 ) in silty soil and propose a method to stabilize it. The proposed methods to stabilize the existing slope are replacing soil-cement (7% by weight) by vertical layering and layering along the slope. Limit equilibrium method was used to analyze the slopes. The existing slopes were likely to be failed because values of minimum FOS was computed less than 1.5. The FOS improved significantly after replacing soil cement by both methods. Among the two methods, it was revealed that the layering along slope method of soil replacement was most economical and easy to be executed at the site.
- 7 October 2019
- Published by Ital Publication in Civil Engineering Journal
- Vol. 5 (10) , 2233-2246
Open AccessAnalysis for Stabilization of Soil Slope in Silty Soil with Replacement of Soil Cement
The slope instability may result due to change in stress conditions, rise in groundwater and rainfall. Similarly, many slopes that have been stable for many years may suddenly fail due to loss of soil shear strength, and external forces. This is a crucial problem as it may destroy buildings, damage roads, and even leads to loss of human life. So it is imperative to understand failure mechanism and adopt safety measures to prevent such failures. The objective of this study is to analyze the slope at different angles (at 300, 350, 450 & 600 ) in silty soil and propose a method to stabilize it. The proposed methods to stabilize the existing slope are replacing soil-cement (7% by weight) by vertical layering and layering along the slope. Limit equilibrium method was used to analyze the slopes. The existing slopes were likely to be failed because values of minimum FOS was computed less than 1.5. The FOS improved significantly after replacing soil cement by both methods. Among the two methods, it was revealed that the layering along slope method of soil replacement was most economical and easy to be executed at the site.
- 15 July 2019
- Published by Taylor & Francis in European Journal of Environmental and Civil Engineering
- Vol. 25 (14) , 2592-2622
Numerical modelling of effects of different multipropped excavation depths on adjacent single piles: comparison between floating and end-bearing pile responses
Owing to a shortage of land, high-rise buildings are increasingly preferred to meet the development and economic growth of major cities in the world. The construction of high-rise buildings often requires deep foundations such as single piles or pile groups when the underlying soil and rock strata do not have sufficient bearing capacity. On the other hand, underground basements are constructed to facilitate inhabitants in the buildings for parking. Development of underground transportation systems consist of tunnels, excavations for basement construction and cut and cover tunnels. These excavations are sometimes inevitable to be constructed adjacent to existing piled foundations. This research presents three-dimensional coupled consolidation analyses (using clay hypoplastic constitutive model that takes account of small-strain stiffness) to investigate the responses of a floating and an end-bearing pile due to adjacent excavation at different depths in clay. It was revealed that the maximum induced bending moment in both types of piles after completion of excavation in all the cases is much less than the pile bending moment capacity (i.e. 800 kNm). Moreover, the end-bearing piles were subjected to significant dragload due to negative skin friction. In contrast, no significant changes in load distribution along floating piles were computed.
- 15 July 2019
- Published by Taylor & Francis in European Journal of Environmental and Civil Engineering
- Vol. 25 (14) , 2592-2622
Numerical modelling of effects of different multipropped excavation depths on adjacent single piles: comparison between floating and end-bearing pile responses
Owing to a shortage of land, high-rise buildings are increasingly preferred to meet the development and economic growth of major cities in the world. The construction of high-rise buildings often requires deep foundations such as single piles or pile groups when the underlying soil and rock strata do not have sufficient bearing capacity. On the other hand, underground basements are constructed to facilitate inhabitants in the buildings for parking. Development of underground transportation systems consist of tunnels, excavations for basement construction and cut and cover tunnels. These excavations are sometimes inevitable to be constructed adjacent to existing piled foundations. This research presents three-dimensional coupled consolidation analyses (using clay hypoplastic constitutive model that takes account of small-strain stiffness) to investigate the responses of a floating and an end-bearing pile due to adjacent excavation at different depths in clay. It was revealed that the maximum induced bending moment in both types of piles after completion of excavation in all the cases is much less than the pile bending moment capacity (i.e. 800 kNm). Moreover, the end-bearing piles were subjected to significant dragload due to negative skin friction. In contrast, no significant changes in load distribution along floating piles were computed.
- Open Access
- 18 March 2019
- Published by Ital Publication in Civil Engineering Journal
- Vol. 5 (3) , 552-562
The Responses of an End-Bearing Pile to Adjacent Multipropped Excavation: 3D Numerical Modelling
It is well recognised that superstructure load is transferred to surrounding soil through piled foundation. Consequently, the high stress regime (stress bulb) is generated surrounding of the pile. On the other hand, the excavation in the ground inevitably results in the ground movement due to induced-stress release. These excavations are sometimes inevitable to be constructed adjacent to existing piled foundations. This condition leads to a big challenge for engineers to assess and protect the integrity of piled foundation. This research presents three-dimensional coupled consolidation analyses (using clay hypoplastic constitutive model which takes account of small-strain stiffness) to investigate the responses of an end-bearing pile due to adjacent excavation at different depths in soft clay. The effects of excavation depths (i.e., formation level) relative to pile were investigated by simulating the excavation near the pile shaft (i.e., case S) and next to (case T). It was revealed that the maximum induced bending moment in the pile after completion of excavation in all the cases is much less than the pile bending moment capacity (i.e. 800 kNm). Comparing the induced deflection of the end-bearing pile in the case T, the pile deflection in case S is higher. Moreover the piles in cases of S and T were subjected to significant dragload due to negative skin friction.
- 18 March 2019
- Published by Ital Publication in Civil Engineering Journal
- Vol. 5 (3) , 552-562
Open AccessThe Responses of an End-Bearing Pile to Adjacent Multipropped Excavation: 3D Numerical Modelling
It is well recognised that superstructure load is transferred to surrounding soil through piled foundation. Consequently, the high stress regime (stress bulb) is generated surrounding of the pile. On the other hand, the excavation in the ground inevitably results in the ground movement due to induced-stress release. These excavations are sometimes inevitable to be constructed adjacent to existing piled foundations. This condition leads to a big challenge for engineers to assess and protect the integrity of piled foundation. This research presents three-dimensional coupled consolidation analyses (using clay hypoplastic constitutive model which takes account of small-strain stiffness) to investigate the responses of an end-bearing pile due to adjacent excavation at different depths in soft clay. The effects of excavation depths (i.e., formation level) relative to pile were investigated by simulating the excavation near the pile shaft (i.e., case S) and next to (case T). It was revealed that the maximum induced bending moment in the pile after completion of excavation in all the cases is much less than the pile bending moment capacity (i.e. 800 kNm). Comparing the induced deflection of the end-bearing pile in the case T, the pile deflection in case S is higher. Moreover the piles in cases of S and T were subjected to significant dragload due to negative skin friction.