Aviral Sharma
Research Subjects
Research Interests
Aviral Sharma has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
Alex Obvintsev
Energy Partners, Ltd
2 shared publicationsJeffrey Chee Leong Kok
Schlumberger
2 shared publicationsPaul Riegler
Energy Partners, Ltd
2 shared publicationsShim Yen Han
Schlumberger
2 shared publicationsTom Bieltz
Energy Partners, Ltd
2 shared publicationsDavid Wade Bryant
Energy Partners, Ltd
1 shared publication
Latest Publications
- 30 October 2011
- Published by Society of Petroleum Engineers (SPE)
Integration of Dynamic Modeling of ICD Completion Design and Well Placement Technology: A Case Study of GOM Shelf Reservoir
High water production is a major issue in horizontal oil wells, especially in longer laterals, because of the high drawdown from the heel to toe. In addition, the presence of heterogeneity along the lateral section can lead to uneven sweep of hydrocarbons which can result in poor recovery. To control the water production and achieve better sweep efficiency, ICDs have been introduced which balance fluid flux along the producing horizontal well. This paper discusses the feasibility and results of using integrated technologies such as ICDs along with rotary steerable drilling systems (RSS) and azimuthal logging while drilling well placement technology to achieve higher reservoir sweep efficiency. This case study is focused on a Gulf of Mexico (GoM) shelf horizontal well which was completed with prepacked screens. The well was sanded in and plugged after five years of high water production. A saturation log was run in the offset well which granted the viability to revisit this reservoir. Consequently, a new offset horizontal well was proposed and drilled next to the existing well to sweep out remaining reserves. For the new offset well, full field dynamic simulations were performed to evaluate attic placement methodology and optimization of Inflow Control Devices (ICDs) into the integrated design. The results illustrate that attic horizontal well placement is feasible using integrated drilling with ICD technology to maximize the sweep efficiency.
- 30 October 2011
- Published by Society of Petroleum Engineers (SPE)
Integration of Dynamic Modeling of ICD Completion Design and Well Placement Technology: A Case Study of GOM Shelf Reservoir
High water production is a major issue in horizontal oil wells, especially in longer laterals, because of the high drawdown from the heel to toe. In addition, the presence of heterogeneity along the lateral section can lead to uneven sweep of hydrocarbons which can result in poor recovery. To control the water production and achieve better sweep efficiency, ICDs have been introduced which balance fluid flux along the producing horizontal well. This paper discusses the feasibility and results of using integrated technologies such as ICDs along with rotary steerable drilling systems (RSS) and azimuthal logging while drilling well placement technology to achieve higher reservoir sweep efficiency. This case study is focused on a Gulf of Mexico (GoM) shelf horizontal well which was completed with prepacked screens. The well was sanded in and plugged after five years of high water production. A saturation log was run in the offset well which granted the viability to revisit this reservoir. Consequently, a new offset horizontal well was proposed and drilled next to the existing well to sweep out remaining reserves. For the new offset well, full field dynamic simulations were performed to evaluate attic placement methodology and optimization of Inflow Control Devices (ICDs) into the integrated design. The results illustrate that attic horizontal well placement is feasible using integrated drilling with ICD technology to maximize the sweep efficiency.
- 27 March 2011
- Published by Society of Petroleum Engineers (SPE)
Evaluations to Mitigate Water Coning and Sand Production by Integrating LWD Technology with Completion Designs
Horizontal and multilateral completions have become increasingly popular as operating companies strive to maximize oil production and minimize the number of wells in Gulf of Mexico (GOM) Shelf. Horizontal oil producers are challenged by gas or water coning that can shorten the well life due to variation in wellbore pressure and reservoir properties from toe to heel. Differences in permeability and/or water saturation, undulations in the wellbore and toe to heel frictional pressure drop can all contribute to early gas or water coning. GOM Shelf sands are predominantly un-consolidated and therefore require appropriate drilling BHAs with placement strategies along with suitable sand control to prevent accumulation in the wellbore and/or erosion of down hole completion components and surface facilities. GOM Shelf sands can contain abundant fines and are non-uniform. The particle size distribution often varies with depth and along the wellbore, thereby making sand control a major challenge. This study descends on an existing GOM Shelf horizontal well that was completed with prepacked screens that sanded in and plugged the well after five years of high water production. A recent reservoir saturation logging run across the reservoir near the toe-end of the lateral granted the viability to revisit this reservoir. Consequently, a new offset horizontal was proposed next to the existing one to sweep out the remaining recoverable reserves. Studies based on existing field data and history match were used to evaluate drilling, well placement, and completion design. Simulations were performed to evaluate attic placement methodology and the inclusion of Inflow Control Devices (ICDs) into the sand control completion and to optimize the integrated design. The results illustrates that attic placement is feasible using azimuthal resistivity measurement with the integration of ICDs to not only delay water coning but also choke back any water that might eventually migrate into the wellbore. Finally, the ICD modeling demonstrates improved sweep efficiency from toe to heel. Both water/gas coning and sand production impose significant risks for lateral well placement and completion design in GOM Shelf especially in horizontal and multilaterals wells. This paper addresses these risks and proposes optimum well placement drilling strategies and completion design to mitigate them.
- 27 March 2011
- Published by Society of Petroleum Engineers (SPE)
Evaluations to Mitigate Water Coning and Sand Production by Integrating LWD Technology with Completion Designs
Horizontal and multilateral completions have become increasingly popular as operating companies strive to maximize oil production and minimize the number of wells in Gulf of Mexico (GOM) Shelf. Horizontal oil producers are challenged by gas or water coning that can shorten the well life due to variation in wellbore pressure and reservoir properties from toe to heel. Differences in permeability and/or water saturation, undulations in the wellbore and toe to heel frictional pressure drop can all contribute to early gas or water coning. GOM Shelf sands are predominantly un-consolidated and therefore require appropriate drilling BHAs with placement strategies along with suitable sand control to prevent accumulation in the wellbore and/or erosion of down hole completion components and surface facilities. GOM Shelf sands can contain abundant fines and are non-uniform. The particle size distribution often varies with depth and along the wellbore, thereby making sand control a major challenge. This study descends on an existing GOM Shelf horizontal well that was completed with prepacked screens that sanded in and plugged the well after five years of high water production. A recent reservoir saturation logging run across the reservoir near the toe-end of the lateral granted the viability to revisit this reservoir. Consequently, a new offset horizontal was proposed next to the existing one to sweep out the remaining recoverable reserves. Studies based on existing field data and history match were used to evaluate drilling, well placement, and completion design. Simulations were performed to evaluate attic placement methodology and the inclusion of Inflow Control Devices (ICDs) into the sand control completion and to optimize the integrated design. The results illustrates that attic placement is feasible using azimuthal resistivity measurement with the integration of ICDs to not only delay water coning but also choke back any water that might eventually migrate into the wellbore. Finally, the ICD modeling demonstrates improved sweep efficiency from toe to heel. Both water/gas coning and sand production impose significant risks for lateral well placement and completion design in GOM Shelf especially in horizontal and multilaterals wells. This paper addresses these risks and proposes optimum well placement drilling strategies and completion design to mitigate them.
- 19 September 2010
- Published by Society of Petroleum Engineers (SPE)
Classification of Oil and Gas Reservoirs Based on Recovery Factor: A Data-Mining Approach
Rigorous flow simulations to obtain estimates for recovery are infeasible given many combinations of reservoir and development scenarios. This motivates an alternative approach to calibrate likelihood of recovery using reservoir datasets. A proxy model relating reservoir, well, and operational factors to the ultimate recovery factor could guide subsequent field-scale flow simulations. There are two reservoir datasets that we have used for the classification and estimation of ultimate recovery: the Tertiary Oil Recovery Information System (TORIS) database for oil reservoirs and the Gas Information System (GASIS) database for gas reservoirs. For oil reservoirs, 19 predictor variables were used to estimate the ultimate recovery factor. Cluster analysis was followed by linear regression analysis within the identified clusters that provided a reliable deterministic model for predicting the recovery factor. The linear regression model was compared with the empirical correlations given by Arps et al. (1967) and Guthrie et al. (1995). Analysis showed that geological and engineering parameters are correlated and both are important to the prediction of recovery factor. Later, we used a naive Bayesian approach on principal scores of the predictors for the calibration of recovery factor likelihood. The likelihood function of the recovery factor for oil reservoirs provided the uncertainty in recovery. It was computed to be multimodal and non-Gaussian. In case of the gas reservoirs, good deterministic estimation was achieved by introducing cluster analysis to the data. The robustness of the linear regression model was tested on tight gas reservoirs. The likelihood of recovery factor was multimodal and non-Gaussian. It also indicates that gas reservoirs are less complex.
- 19 September 2010
- Published by Society of Petroleum Engineers (SPE)
Classification of Oil and Gas Reservoirs Based on Recovery Factor: A Data-Mining Approach
Rigorous flow simulations to obtain estimates for recovery are infeasible given many combinations of reservoir and development scenarios. This motivates an alternative approach to calibrate likelihood of recovery using reservoir datasets. A proxy model relating reservoir, well, and operational factors to the ultimate recovery factor could guide subsequent field-scale flow simulations. There are two reservoir datasets that we have used for the classification and estimation of ultimate recovery: the Tertiary Oil Recovery Information System (TORIS) database for oil reservoirs and the Gas Information System (GASIS) database for gas reservoirs. For oil reservoirs, 19 predictor variables were used to estimate the ultimate recovery factor. Cluster analysis was followed by linear regression analysis within the identified clusters that provided a reliable deterministic model for predicting the recovery factor. The linear regression model was compared with the empirical correlations given by Arps et al. (1967) and Guthrie et al. (1995). Analysis showed that geological and engineering parameters are correlated and both are important to the prediction of recovery factor. Later, we used a naive Bayesian approach on principal scores of the predictors for the calibration of recovery factor likelihood. The likelihood function of the recovery factor for oil reservoirs provided the uncertainty in recovery. It was computed to be multimodal and non-Gaussian. In case of the gas reservoirs, good deterministic estimation was achieved by introducing cluster analysis to the data. The robustness of the linear regression model was tested on tight gas reservoirs. The likelihood of recovery factor was multimodal and non-Gaussian. It also indicates that gas reservoirs are less complex.
- 21 September 2008
- Published by Society of Petroleum Engineers (SPE)
An Integrated Approach to Reservoir Uncertainty Assessment: Case Study of a Gulf of Mexico Reservoir
Integrated uncertainty analysis of a carbonate reservoir in the Gulf of Mexico was performed to quantify the contribution of factors such as lithofacies definition criteria, reservoir structure, total and fracture porosity, net-to-gross cut-offs, and measurement scale disparities on geologic uncertainty. An innovative approach to derive facies definition criteria and net-to-gross cut-offs based on k-mean cluster analysis is presented. A detailed analysis of scale up of petrophysical properties using the variance of mean concept was performed and its implication on geologic model uncertainty was assessed. Finally, innovative approaches to verify and visualize spatial uncertainty models are presented. A detailed geologic model for the fractured carbonate reservoir was available and the study objective was broken down into an assessment of uncertainty due to: i) structural model, ii) sedimentary model, iii) petrophysical model, and iv) scaleup/upscaling. Systematic investigation of each of these aspects as well as a fully probabilistic integration of uncertainty models was performed. Uncertainty in original oil in place was computed by sampling from the component distributions. The study results indicate that the OOIP exhibits significant sensitivity to factors such as cut-offs for lithofacies and net-to-gross definition. An important result that points to a paradigm shift in uncertainty modeling is the sizeable contribution of scale-up to the uncertainty models. The results further reveal that the determination of net-to-gross and lithofacies definition thresholds using cluster analysis vastly enhances the accuracy of the prediction of net-pay at a new well location. The paper presents a complete workflow for integrated reservoir uncertainty assessment. Besides demonstrating the use of data analysis tools such as cluster analysis for deriving more robust criteria for facies and net-to-gross definition, a fundamental contribution of this paper is to demonstrate the role of scale up on uncertainty assessment. While this has been alluded to by several researchers in the past, this paper is the first to demonstrate a modeling workflow that explicitly handles uncertainty due to scale up and promotes the notion of "soft" conditional simulation.
- 21 September 2008
- Published by Society of Petroleum Engineers (SPE)
An Integrated Approach to Reservoir Uncertainty Assessment: Case Study of a Gulf of Mexico Reservoir
Integrated uncertainty analysis of a carbonate reservoir in the Gulf of Mexico was performed to quantify the contribution of factors such as lithofacies definition criteria, reservoir structure, total and fracture porosity, net-to-gross cut-offs, and measurement scale disparities on geologic uncertainty. An innovative approach to derive facies definition criteria and net-to-gross cut-offs based on k-mean cluster analysis is presented. A detailed analysis of scale up of petrophysical properties using the variance of mean concept was performed and its implication on geologic model uncertainty was assessed. Finally, innovative approaches to verify and visualize spatial uncertainty models are presented. A detailed geologic model for the fractured carbonate reservoir was available and the study objective was broken down into an assessment of uncertainty due to: i) structural model, ii) sedimentary model, iii) petrophysical model, and iv) scaleup/upscaling. Systematic investigation of each of these aspects as well as a fully probabilistic integration of uncertainty models was performed. Uncertainty in original oil in place was computed by sampling from the component distributions. The study results indicate that the OOIP exhibits significant sensitivity to factors such as cut-offs for lithofacies and net-to-gross definition. An important result that points to a paradigm shift in uncertainty modeling is the sizeable contribution of scale-up to the uncertainty models. The results further reveal that the determination of net-to-gross and lithofacies definition thresholds using cluster analysis vastly enhances the accuracy of the prediction of net-pay at a new well location. The paper presents a complete workflow for integrated reservoir uncertainty assessment. Besides demonstrating the use of data analysis tools such as cluster analysis for deriving more robust criteria for facies and net-to-gross definition, a fundamental contribution of this paper is to demonstrate the role of scale up on uncertainty assessment. While this has been alluded to by several researchers in the past, this paper is the first to demonstrate a modeling workflow that explicitly handles uncertainty due to scale up and promotes the notion of "soft" conditional simulation.