Nayanthara De Silva
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Nayanthara De Silva has a total of 28 co-authors. Here are the top co-authors by number of shared publications:
Malik Ranasinghe
Department of Civil Engineering, University of Moratuwa, Moratuwa, Sri Lanka
5 shared publications- Michael Yit Lin Chew
Department of the Built Environment, National University of Singapore, Singapore 117566, Singapore
4 shared publications C.R. De Silva
Univ Moratuwa, Dept Comp Sci & Engn, Katubedd, Moratuwa, Sri Lanka
2 shared publications- Florence Yean Yng Ling
National Univ. of Singapore
2 shared publications George Ofori
2 shared publicationsH.W.N. Madhusanka
2 shared publications
Latest Publications
- 7 September 2026
- Published by Emerald Publishing in Facilities
- p. 1-17
The concept of biophilic design to enhance healthy indoor: an experiment on moss-based applications for tropical buildings
Purpose: The concept of Biophilic Design (BD) refers to integrating natural elements into the built environment, which enhances human well-being and environmental quality. It includes a variety of natural elements, among which plants are widely adopted. Plants are broadly classified into vascular and non-vascular plants; the latter are also known as bryophytes, including mosses. They are widely studied and currently used as bioindicators, temperature and humidity controllers, air purifiers and insulation barriers. This study aims to examine the effectiveness of improving indoor air quality (IAQ) in tropical buildings using a moss-based BD. Design/methodology/approach: The research uses an experimental methodology to test the success of indoor moss growth and evaluate its ability to regulate indoor pollutants. The indoor cultivated moss specimen was created and tested for its ability to remove particulate matter (PM2.5, PM10) and formaldehyde. Regression analysis was conducted to evaluate the pollutant absorption capacity of the mosses while assessing their effectiveness in improving IAQ. Findings: The findings show that moss can reduce PM2.5, PM10 and formaldehyde. Research limitations/implications: The primary limitations include the short-term nature of the experiment and the reliance on ambient conditions, allowing natural air concentration without mechanical intervention. Practical implications: This moss-based BD, a low-cost intervention, could be useful for smoking areas and restaurants and low-income communities that live in congested residential units, especially in urban settings. Social implications: From an economic and commercial perspective, moss-based biophilic systems offer a cost-effective and low-maintenance alternative to mechanically developed air purification technologies. In terms of policy relevance, the outcomes support the integration of nature-based IAQ interventions within green building guidelines and sustainability frameworks, particularly in tropical regions where passive solutions are essential. The study contributes to educational applications by providing an experimentally grounded study that can be incorporated into facilities management, architecture and built environment studies by strengthening the connection between theory, experimentation and practical scenarios. Originality/value: These findings establish a foundation for future research to develop moss-based BDs to enhance IAQ in densely occupied indoor settings.
- 7 September 2026
- Published by Emerald Publishing in Facilities
- p. 1-17
The concept of biophilic design to enhance healthy indoor: an experiment on moss-based applications for tropical buildings
Purpose: The concept of Biophilic Design (BD) refers to integrating natural elements into the built environment, which enhances human well-being and environmental quality. It includes a variety of natural elements, among which plants are widely adopted. Plants are broadly classified into vascular and non-vascular plants; the latter are also known as bryophytes, including mosses. They are widely studied and currently used as bioindicators, temperature and humidity controllers, air purifiers and insulation barriers. This study aims to examine the effectiveness of improving indoor air quality (IAQ) in tropical buildings using a moss-based BD. Design/methodology/approach: The research uses an experimental methodology to test the success of indoor moss growth and evaluate its ability to regulate indoor pollutants. The indoor cultivated moss specimen was created and tested for its ability to remove particulate matter (PM2.5, PM10) and formaldehyde. Regression analysis was conducted to evaluate the pollutant absorption capacity of the mosses while assessing their effectiveness in improving IAQ. Findings: The findings show that moss can reduce PM2.5, PM10 and formaldehyde. Research limitations/implications: The primary limitations include the short-term nature of the experiment and the reliance on ambient conditions, allowing natural air concentration without mechanical intervention. Practical implications: This moss-based BD, a low-cost intervention, could be useful for smoking areas and restaurants and low-income communities that live in congested residential units, especially in urban settings. Social implications: From an economic and commercial perspective, moss-based biophilic systems offer a cost-effective and low-maintenance alternative to mechanically developed air purification technologies. In terms of policy relevance, the outcomes support the integration of nature-based IAQ interventions within green building guidelines and sustainability frameworks, particularly in tropical regions where passive solutions are essential. The study contributes to educational applications by providing an experimentally grounded study that can be incorporated into facilities management, architecture and built environment studies by strengthening the connection between theory, experimentation and practical scenarios. Originality/value: These findings establish a foundation for future research to develop moss-based BDs to enhance IAQ in densely occupied indoor settings.
- 30 June 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16 (4) , 772-791
Smartness assessment model for modern buildings in Sri Lanka
Purpose: As economic activities grow, clients demand more efficient building facilities. Smart buildings, which integrate technology, user interaction and adaptability, offer a solution, yet their adoption in developing countries like Sri Lanka remains limited. Although frameworks exist, most originate in developed contexts and emphasise individual attributes rather than integrated assessment. This study develops a Sri Lanka-specific smartness assessment model to evaluate modern buildings and motivate improvements in efficiency and sustainability. Design/methodology/approach: This article employs a mixed-methods design to develop a smartness assessment model comprising 11 attributes and 41 variables, derived from the literature and subsequently validated and weighted by experts. Sixteen selected buildings in the Colombo suburbs were assessed; cases were selected by convenience sampling. Data were collected through site observations, document review and interviews with responsible professionals. Scores were computed using a four-level subgrades and weighted aggregation to produce Smartness Ratings, which were summarised descriptively. Findings: Across 16 buildings, the mean Smartness Rating is 42%. By type, commercial average 48.35%, hotels 45% and apartments 34%, with CB4 (61.34%) and CB5 (57.79%) leading the sample. Higher Smartness Ratings are associated with deeper building management systems coverage, central-plant control and sensor-based monitoring, whereas lower Smartness Ratings reflect fragmented integration. At the attribute level, occupant control and safety and security are consistently strong; energy efficiency and environment and sustainability sit in the mid-range; and adaptability and learning are largely absent. Originality/value: This article introduces a comprehensive, validated smartness assessment tailored to Sri Lankan buildings and demonstrates its application to a real-world sample.
- 30 June 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16 (4) , 772-791
Smartness assessment model for modern buildings in Sri Lanka
Purpose: As economic activities grow, clients demand more efficient building facilities. Smart buildings, which integrate technology, user interaction and adaptability, offer a solution, yet their adoption in developing countries like Sri Lanka remains limited. Although frameworks exist, most originate in developed contexts and emphasise individual attributes rather than integrated assessment. This study develops a Sri Lanka-specific smartness assessment model to evaluate modern buildings and motivate improvements in efficiency and sustainability. Design/methodology/approach: This article employs a mixed-methods design to develop a smartness assessment model comprising 11 attributes and 41 variables, derived from the literature and subsequently validated and weighted by experts. Sixteen selected buildings in the Colombo suburbs were assessed; cases were selected by convenience sampling. Data were collected through site observations, document review and interviews with responsible professionals. Scores were computed using a four-level subgrades and weighted aggregation to produce Smartness Ratings, which were summarised descriptively. Findings: Across 16 buildings, the mean Smartness Rating is 42%. By type, commercial average 48.35%, hotels 45% and apartments 34%, with CB4 (61.34%) and CB5 (57.79%) leading the sample. Higher Smartness Ratings are associated with deeper building management systems coverage, central-plant control and sensor-based monitoring, whereas lower Smartness Ratings reflect fragmented integration. At the attribute level, occupant control and safety and security are consistently strong; energy efficiency and environment and sustainability sit in the mid-range; and adaptability and learning are largely absent. Originality/value: This article introduces a comprehensive, validated smartness assessment tailored to Sri Lankan buildings and demonstrates its application to a real-world sample.
- 22 May 2026
- Published by Emerald Publishing in Benchmarking: An International Journal
- p. 1-31
A robust benchmarking model for facilities management in buildings in Sri Lanka
Purpose: Benchmarking enables Facilities Management (FM) professionals to identify performance gaps within FM functions. However, FM professionals have not effectively adopted systematic performance benchmarking models for their applications. This study focused on developing a robust model for benchmarking FM performance in buildings and proposed best practices for performance gaps. Design/methodology/approach: The existing benchmarking models, such as the Xerox model, Kulikowski's model, Adewunmi's benchmarking framework and various Key Performance Indicators (KPIs), were thoroughly studied and applied with modifications in the proposed FM benchmarking model. A questionnaire survey was conducted to collect data to benchmark FM functions in buildings using the developed model. Furthermore, the best practices adopted in buildings were studied to propose good practices for underperforming buildings. Findings: Twelve KPIs were integrated into the design of the proposed model. After studying the critical FM functions in hotels, apartments and office buildings, utilities, janitorial, housekeeping and security were selected to be benchmarked. Results show that financial benchmarks of utilities, janitorial and housekeeping and security metrics have increased in hotels, apartments and office buildings, while non-financial KPIs remain unchanged over the 4 years. Eight best practices are suggested to enhance FM performance in each building type. Originality/value: The facility managers can use this proposed FM benchmarking model to compare the FM performance of their buildings with other similar buildings in the competitive business. Further, they can optimize the FM performance of their buildings, considering the benchmark values.
- 22 May 2026
- Published by Emerald Publishing in Benchmarking: An International Journal
- p. 1-31
A robust benchmarking model for facilities management in buildings in Sri Lanka
Purpose: Benchmarking enables Facilities Management (FM) professionals to identify performance gaps within FM functions. However, FM professionals have not effectively adopted systematic performance benchmarking models for their applications. This study focused on developing a robust model for benchmarking FM performance in buildings and proposed best practices for performance gaps. Design/methodology/approach: The existing benchmarking models, such as the Xerox model, Kulikowski's model, Adewunmi's benchmarking framework and various Key Performance Indicators (KPIs), were thoroughly studied and applied with modifications in the proposed FM benchmarking model. A questionnaire survey was conducted to collect data to benchmark FM functions in buildings using the developed model. Furthermore, the best practices adopted in buildings were studied to propose good practices for underperforming buildings. Findings: Twelve KPIs were integrated into the design of the proposed model. After studying the critical FM functions in hotels, apartments and office buildings, utilities, janitorial, housekeeping and security were selected to be benchmarked. Results show that financial benchmarks of utilities, janitorial and housekeeping and security metrics have increased in hotels, apartments and office buildings, while non-financial KPIs remain unchanged over the 4 years. Eight best practices are suggested to enhance FM performance in each building type. Originality/value: The facility managers can use this proposed FM benchmarking model to compare the FM performance of their buildings with other similar buildings in the competitive business. Further, they can optimize the FM performance of their buildings, considering the benchmark values.
- 31 December 2021
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 12 (5) , 754-774
RE-engineered factory acceptance testing under the new normal
Purpose: Factory acceptance testing (FAT) in the construction industry has been severely hampered due to restrictions in cross-border travel resulting from the COVID-19 pandemic. Consequently, virtual FAT (vFAT) became a popular substitute for physical FAT. However, the credibility of vFAT is being questioned because it was adopted without much scrutiny. Hence, this study is aimed at investigating vFATs and re-engineering the FAT process to suit an effective vFAT environment.Design/methodology/approach: A comprehensive literature search on FAT procedures was followed by two stages of expert interviews with eight leading subject experts and a case study. The findings were analysed using code-based content analysis on NVivo software.Findings: Strengths of vFATs include “reduction in cost and time consumed”, “flexibility for more participants” and “faster orders”. Most emphasized weaknesses include “lack of reliability” and “lack of technology transfer”. vFAT has mostly increased test reliability by “improving accessibility” and has decreased reliability by “restricting physical touch and feel observation of the equipment”. A four-step vFAT process was developed with a noteworthy additional step called “Pre-FAT Meeting”.Research limitations/implications: The scope of this study is limited to the Sri Lankan construction industry. Expansion of the geographical area of focus is recommended for future studies.Originality/value: The findings of this study unveil a vFAT process, which is timely and beneficial for construction practitioners to optimize and enhance the effectiveness of vFATs which are currently conducted in a disarranged manner.
- 31 December 2021
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 12 (5) , 754-774
RE-engineered factory acceptance testing under the new normal
Purpose: Factory acceptance testing (FAT) in the construction industry has been severely hampered due to restrictions in cross-border travel resulting from the COVID-19 pandemic. Consequently, virtual FAT (vFAT) became a popular substitute for physical FAT. However, the credibility of vFAT is being questioned because it was adopted without much scrutiny. Hence, this study is aimed at investigating vFATs and re-engineering the FAT process to suit an effective vFAT environment.Design/methodology/approach: A comprehensive literature search on FAT procedures was followed by two stages of expert interviews with eight leading subject experts and a case study. The findings were analysed using code-based content analysis on NVivo software.Findings: Strengths of vFATs include “reduction in cost and time consumed”, “flexibility for more participants” and “faster orders”. Most emphasized weaknesses include “lack of reliability” and “lack of technology transfer”. vFAT has mostly increased test reliability by “improving accessibility” and has decreased reliability by “restricting physical touch and feel observation of the equipment”. A four-step vFAT process was developed with a noteworthy additional step called “Pre-FAT Meeting”.Research limitations/implications: The scope of this study is limited to the Sri Lankan construction industry. Expansion of the geographical area of focus is recommended for future studies.Originality/value: The findings of this study unveil a vFAT process, which is timely and beneficial for construction practitioners to optimize and enhance the effectiveness of vFATs which are currently conducted in a disarranged manner.
- 31 May 2019
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 9 (3) , 426-439
Demand-side energy retrofit potential in existing office buildings
Purpose: Office buildings confront with the issue of high energy demand during the day time mainly due to heavy use of energy for HVAC and lighting systems. Demand-side energy retrofits (DSER) are identified as effective in controlling electricity demand of existing buildings. The purpose of this paper is to analyse the potential of incorporating DSER in to existing office buildings. The paper reports the cost benefits of using DSER in existing office buildings. Furthermore, it reveals several enablers that can be used to promote retrofits in office buildings of Sri Lanka. Design/methodology/approach: An industry survey was conducted by selecting a sample of 35 office buildings to study the usage of DSER in office buildings of Sri Lanka. Furthermore, three case studies were conducted to analyse the costs benefits of widely used DSER techniques in office buildings. Findings: Research revealed that the use of DSER techniques in existing office buildings of Sri Lanka is at a lower level. However, it found that the financial viability of those DSER was at a promising level. Furthermore, 11 enablers in two levels as organisational level and national level were identified to enhance the use of DSER. Originality/value: The study justifies the potential of DSER in reducing energy demand of existing office buildings through in-depth cost benefit analysis, which is useful for a country like Sri Lanka which faces massive energy crisis. This encourages Facility Managers towards using DSER to reduce building energy demand. Furthermore, study provides enablers at organisational and national levels to enhance the use of DSER.
- 31 May 2019
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 9 (3) , 426-439
Demand-side energy retrofit potential in existing office buildings
Purpose: Office buildings confront with the issue of high energy demand during the day time mainly due to heavy use of energy for HVAC and lighting systems. Demand-side energy retrofits (DSER) are identified as effective in controlling electricity demand of existing buildings. The purpose of this paper is to analyse the potential of incorporating DSER in to existing office buildings. The paper reports the cost benefits of using DSER in existing office buildings. Furthermore, it reveals several enablers that can be used to promote retrofits in office buildings of Sri Lanka. Design/methodology/approach: An industry survey was conducted by selecting a sample of 35 office buildings to study the usage of DSER in office buildings of Sri Lanka. Furthermore, three case studies were conducted to analyse the costs benefits of widely used DSER techniques in office buildings. Findings: Research revealed that the use of DSER techniques in existing office buildings of Sri Lanka is at a lower level. However, it found that the financial viability of those DSER was at a promising level. Furthermore, 11 enablers in two levels as organisational level and national level were identified to enhance the use of DSER. Originality/value: The study justifies the potential of DSER in reducing energy demand of existing office buildings through in-depth cost benefit analysis, which is useful for a country like Sri Lanka which faces massive energy crisis. This encourages Facility Managers towards using DSER to reduce building energy demand. Furthermore, study provides enablers at organisational and national levels to enhance the use of DSER.
- 4 December 2018
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- Vol. 16 (6) , 850-868
Under-reporting of construction accidents in Sri Lanka
Purpose: Under-reporting of occupational accidents is a common problem in many countries. This is mainly because of the shortfalls in accident reporting and recording systems. Construction industry being a hazardous industry, the rate of accidents is higher compared with other industries and apparently a high rate of under-reporting. The purpose of this paper is to investigate the rate of under-reporting, significant reasons for under-reporting and identify the shortcomings in the existing accident reporting system in Sri Lanka in aiming to recommend efficient mechanisms for occupational accident recording and reporting to construction industry.Design/methodology/approach: Both secondary and primary data were tapped to gather required data. The secondary data were extracted from the records available in year 2014-2015 at the office of the commissioner for workmen’s compensation and the industrial safety division of the Department of Labor (DoL) to analyze the rate of under-reporting. The primary data were obtained through expert interviews to explore the gaps in reporting system and to identify mechanisms to reduce under-reporting.Findings: The findings revealed 80 per cent of construction accidents are under-reported. Eight gaps in the current accident recording and reporting system and key recommendations at organizational and national level for its improvements were identified.Originality/value: The findings provide an insight of occupational safety and health (OSH) practices in construction industry and it can be used as an eye opening flash for safety law-makers and practitioners to revisit the existing regulations and practices.
- 4 December 2018
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- Vol. 16 (6) , 850-868
Under-reporting of construction accidents in Sri Lanka
Purpose: Under-reporting of occupational accidents is a common problem in many countries. This is mainly because of the shortfalls in accident reporting and recording systems. Construction industry being a hazardous industry, the rate of accidents is higher compared with other industries and apparently a high rate of under-reporting. The purpose of this paper is to investigate the rate of under-reporting, significant reasons for under-reporting and identify the shortcomings in the existing accident reporting system in Sri Lanka in aiming to recommend efficient mechanisms for occupational accident recording and reporting to construction industry.Design/methodology/approach: Both secondary and primary data were tapped to gather required data. The secondary data were extracted from the records available in year 2014-2015 at the office of the commissioner for workmen’s compensation and the industrial safety division of the Department of Labor (DoL) to analyze the rate of under-reporting. The primary data were obtained through expert interviews to explore the gaps in reporting system and to identify mechanisms to reduce under-reporting.Findings: The findings revealed 80 per cent of construction accidents are under-reported. Eight gaps in the current accident recording and reporting system and key recommendations at organizational and national level for its improvements were identified.Originality/value: The findings provide an insight of occupational safety and health (OSH) practices in construction industry and it can be used as an eye opening flash for safety law-makers and practitioners to revisit the existing regulations and practices.
- 6 August 2018
- Published by Emerald Publishing in Journal of Financial Management of Property and Construction
- Vol. 23 (2) , 170-184
Enablers of relational integrated value networks (RIVANS) for total facilities management (TFM)
Purpose: The purpose of this paper is to identify enablers for setting up relationally integrated value networks (RIVANS) for total facilities management (TFM) as a holistic approach to bridge the Project Management (PM) phase to the facilities management (FM) phase, aiming for better service delivery while optimizing the life-cycle cost. These enablers are proposed as required driving forces for the industry to bridge current gaps through RIVANS for TFM so as to improve the value of the facility and deliver better value to its stakeholders over its life span. Design/methodology/approach: A literature review elicited 11 typical better values that could be achieved by suitably linking the PM and FM supply chains in general. While these were tested in parallel research exercises in Hong Kong, the UK and Singapore, this paper reports on the specific findings from Sri Lanka, where a Web-based questionnaire survey was conducted to identify potential better values for proposed relational networks (including the clients, consultants, contractors and suppliers in the supply chain). Better values were then clustered under principal domains/components using factor analysis to establish synergetic enablers. Findings: In total, 11 significant better values for TFM were identified and four enablers were extracted as building long-term integrated networks, establishing a common resource pool linking PM and FM, enhancing sustainability of TFM and developing a similar protocol between PM and FM. Originality/value: The study carried out in this paper contributes to knowledge by identifying drivers to bridge the gap between PM and FM to best achieve clients’ long-term aspirations through a holistic life-cycle approach. Furthermore, all stakeholders in TFM can revisit their practices to establish and strengthen the identified enablers.
- 6 August 2018
- Published by Emerald Publishing in Journal of Financial Management of Property and Construction
- Vol. 23 (2) , 170-184
Enablers of relational integrated value networks (RIVANS) for total facilities management (TFM)
Purpose: The purpose of this paper is to identify enablers for setting up relationally integrated value networks (RIVANS) for total facilities management (TFM) as a holistic approach to bridge the Project Management (PM) phase to the facilities management (FM) phase, aiming for better service delivery while optimizing the life-cycle cost. These enablers are proposed as required driving forces for the industry to bridge current gaps through RIVANS for TFM so as to improve the value of the facility and deliver better value to its stakeholders over its life span. Design/methodology/approach: A literature review elicited 11 typical better values that could be achieved by suitably linking the PM and FM supply chains in general. While these were tested in parallel research exercises in Hong Kong, the UK and Singapore, this paper reports on the specific findings from Sri Lanka, where a Web-based questionnaire survey was conducted to identify potential better values for proposed relational networks (including the clients, consultants, contractors and suppliers in the supply chain). Better values were then clustered under principal domains/components using factor analysis to establish synergetic enablers. Findings: In total, 11 significant better values for TFM were identified and four enablers were extracted as building long-term integrated networks, establishing a common resource pool linking PM and FM, enhancing sustainability of TFM and developing a similar protocol between PM and FM. Originality/value: The study carried out in this paper contributes to knowledge by identifying drivers to bridge the gap between PM and FM to best achieve clients’ long-term aspirations through a holistic life-cycle approach. Furthermore, all stakeholders in TFM can revisit their practices to establish and strengthen the identified enablers.
- 7 August 2017
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- Vol. 15 (4) , 488-504
Managing occupational stress of professionals in large construction projects
Purpose: Occupational stress among professionals in construction industry is increasing considerably due to faster economic development projects in many developing countries. Reportedly, construction professionals are the third most affected group after miners and police officers. Hence, the study aims to explore profession-specific occupational stressors, their impact on professional and the prevention strategies in place at an organizational level. The study is further focused to identify specific prevention strategies that can be implemented at the organizational level. Design/methodology/approach: A questionnaire-based survey was performed among construction professionals such as project managers, engineers and quantity surveyors involved in large construction projects to identify occupational stress causing factors pertinent to construction professionals, their impact and occupational stress prevention strategies. Stress prevention strategies at primary, secondary and tertiary levels were analyzed to establish the stress prevention framework for large organizations. Findings: Eleven occupational stress causing factors were identified to be significant in creating negative impact at work. Further, 13 resultant impacts of negative stress were recognized. Three primary prevention strategies, three secondary prevention strategies and a tertiary prevention approach were identified using a factor analysis to manage these occupational stresses at the organizational level. Originality/value: Impact of occupational stress on construction professionals that may cause poor performance of the industry can be controlled by effectively managing and controlling the negative stresses.
- 7 August 2017
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- Vol. 15 (4) , 488-504
Managing occupational stress of professionals in large construction projects
Purpose: Occupational stress among professionals in construction industry is increasing considerably due to faster economic development projects in many developing countries. Reportedly, construction professionals are the third most affected group after miners and police officers. Hence, the study aims to explore profession-specific occupational stressors, their impact on professional and the prevention strategies in place at an organizational level. The study is further focused to identify specific prevention strategies that can be implemented at the organizational level. Design/methodology/approach: A questionnaire-based survey was performed among construction professionals such as project managers, engineers and quantity surveyors involved in large construction projects to identify occupational stress causing factors pertinent to construction professionals, their impact and occupational stress prevention strategies. Stress prevention strategies at primary, secondary and tertiary levels were analyzed to establish the stress prevention framework for large organizations. Findings: Eleven occupational stress causing factors were identified to be significant in creating negative impact at work. Further, 13 resultant impacts of negative stress were recognized. Three primary prevention strategies, three secondary prevention strategies and a tertiary prevention approach were identified using a factor analysis to manage these occupational stresses at the organizational level. Originality/value: Impact of occupational stress on construction professionals that may cause poor performance of the industry can be controlled by effectively managing and controlling the negative stresses.
- 13 July 2017
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 7 (3) , 313-329
Relationally integrated value networks (RIVANS) for total facilities management (TFM)
Purpose: A case is made for developing “Relationally Integrated Value Networks for Total Facilities Management” (RIVANS-TFM) by synergistically connecting significant stakeholders of the project management (PM) and facilities management (FM) phases to deliver substantially better value for the end users of built infrastructure. The paper aims to discuss these issues. Design/methodology/approach: A structured questionnaire survey enabled identification of typically significant stakeholders in the PM and FM phases. In total, 14 key stakeholders were identified through t-test analysis in this Sri Lankan study. Semi-structured interviews unveiled relationships among the aforementioned stakeholders and the findings were used to develop the “required” RIVANS-TFM, as well as the “existing” RIVANS-TFM, using the UCINET social network analysis software package. Social network theory of relationships was applied to analyze the networks in terms of “Structural Holes” or missing links and “Brokerage Potentials.” Findings: Structural holes analysis highlighted the existing setup to be more vulnerable to missing links than the “required”/targeted setup. Furthermore, brokerage potentials analysis revealed that owners, project managers, facility managers, maintenance engineers, main contractors, designers, principal consultants, and other specialist consultants can act as “brokers” to bridge the gaps or minimize structural holes, thereby uplifting and reinforcing the existing network to deliver better performance and value in TFM. Originality/value: By revealing existing and required levels of integration of each stakeholder in RIVANS-TFM, clients are provided a great opportunity to identify the stakeholders who should be engaged more, or less – in order to best achieve clients’ long-term aspirations and project objectives. Furthermore, the findings also indicate appropriate levels of stakeholder relationships to target, in order to maintain efficient flows of information, material and services in the supply chains while enhancing TFM life-cycle values.
- 13 July 2017
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 7 (3) , 313-329
Relationally integrated value networks (RIVANS) for total facilities management (TFM)
Purpose: A case is made for developing “Relationally Integrated Value Networks for Total Facilities Management” (RIVANS-TFM) by synergistically connecting significant stakeholders of the project management (PM) and facilities management (FM) phases to deliver substantially better value for the end users of built infrastructure. The paper aims to discuss these issues. Design/methodology/approach: A structured questionnaire survey enabled identification of typically significant stakeholders in the PM and FM phases. In total, 14 key stakeholders were identified through t-test analysis in this Sri Lankan study. Semi-structured interviews unveiled relationships among the aforementioned stakeholders and the findings were used to develop the “required” RIVANS-TFM, as well as the “existing” RIVANS-TFM, using the UCINET social network analysis software package. Social network theory of relationships was applied to analyze the networks in terms of “Structural Holes” or missing links and “Brokerage Potentials.” Findings: Structural holes analysis highlighted the existing setup to be more vulnerable to missing links than the “required”/targeted setup. Furthermore, brokerage potentials analysis revealed that owners, project managers, facility managers, maintenance engineers, main contractors, designers, principal consultants, and other specialist consultants can act as “brokers” to bridge the gaps or minimize structural holes, thereby uplifting and reinforcing the existing network to deliver better performance and value in TFM. Originality/value: By revealing existing and required levels of integration of each stakeholder in RIVANS-TFM, clients are provided a great opportunity to identify the stakeholders who should be engaged more, or less – in order to best achieve clients’ long-term aspirations and project objectives. Furthermore, the findings also indicate appropriate levels of stakeholder relationships to target, in order to maintain efficient flows of information, material and services in the supply chains while enhancing TFM life-cycle values.
- 16 March 2016
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 6 (2)
TBPE scoring framework for tropical buildings
Purpose To determine how well the facilities are performing in order to support the organizational goals and user requirement it is very vital to conduct regular building evaluations which necessitates the important usage of BPE where it provides the current status quo of building. Presently, there are various BPE approaches developed around the world, and as evidenced there are no in-depth studies on BPE in tropical countries to evaluate the BP. However, adapting these approaches might not necessarily be applicable in the context of tropical countries due to geographical, climatic, cultural and other differences. This has been identified as the gap in this research and aimed to formulate a holistic TBPE scoring framework, for the assessment of performance of buildings. Design/methodology/approach The study was quantitative in nature. Firstly, a comprehensive literature survey was carried out. This was followed by an expert survey to sieve out the most significant BP factors identified in the literature survey. With that detailed questioner survey was carried out proposing a TBPE scoring framework Findings A TBPE scoring framework was proposed with a total of 265 points to evaluate buildings compromising of 7criteria and 57 dimensions in which energy management, reachability, occupational hygiene, thermal etc had higher contribution in evaluating building Research limitations/implications Identification of measurement units and parameters for BP dimensions are expected to be conducted in order to distribute the scoring evenly. Continuous studies are also necessary since the expectations of building performance dimensions changing all the time. Originality/value This paper readdresses the need of evaluating the buildings and suggesting the paradigm to evaluate the buildings in an objective manner.
- 16 March 2016
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 6 (2)
TBPE scoring framework for tropical buildings
Purpose To determine how well the facilities are performing in order to support the organizational goals and user requirement it is very vital to conduct regular building evaluations which necessitates the important usage of BPE where it provides the current status quo of building. Presently, there are various BPE approaches developed around the world, and as evidenced there are no in-depth studies on BPE in tropical countries to evaluate the BP. However, adapting these approaches might not necessarily be applicable in the context of tropical countries due to geographical, climatic, cultural and other differences. This has been identified as the gap in this research and aimed to formulate a holistic TBPE scoring framework, for the assessment of performance of buildings. Design/methodology/approach The study was quantitative in nature. Firstly, a comprehensive literature survey was carried out. This was followed by an expert survey to sieve out the most significant BP factors identified in the literature survey. With that detailed questioner survey was carried out proposing a TBPE scoring framework Findings A TBPE scoring framework was proposed with a total of 265 points to evaluate buildings compromising of 7criteria and 57 dimensions in which energy management, reachability, occupational hygiene, thermal etc had higher contribution in evaluating building Research limitations/implications Identification of measurement units and parameters for BP dimensions are expected to be conducted in order to distribute the scoring evenly. Continuous studies are also necessary since the expectations of building performance dimensions changing all the time. Originality/value This paper readdresses the need of evaluating the buildings and suggesting the paradigm to evaluate the buildings in an objective manner.