Matija Pavičević
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Matija Pavičević has a total of 48 co-authors. Here are the top co-authors by number of shared publications:
Quentin Ploussard
Argonne National Laboratory (ANL), Argonne, IL (United States)
5 shared publications- Sylvain Quoilin
University of Liège
5 shared publications Ao Yu
Argonne National Laboratory (ANL), Argonne, IL (United States)
4 shared publicationsArgonne Argonne National Laboratory (Anl)
4 shared publications- Quentin Ploussard
Argonne National Laboratory, Lemont, Illinois 60439
4 shared publications Usdoe
4 shared publications
Latest Publications
- Open Access
- 1 August 2026
- Published by Office of Scientific and Technical Information (OSTI)
Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during 2025
The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases.
- 1 August 2026
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessFinancial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during 2025
The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases.
- Open Access
- 16 July 2026
- Published by Elsevier in SSRN Electronic Journal
Lost Power, Lost Value: Economic Costs of Hydroelectric Dam Water Bypass
Hydropower production in the U.S. operates within a complex regulatory framework balancing grid reliability, resource allocation, and environmental protection. Because power plants are tightly linked through the electricity grid, environmental flow regulations that alter hydropower production can trigger spillover effects across the broader generation fleet. This paper evaluates the economic impact of a recent environmental flow experiment requiring dam operators to bypass water rather than generate electricity. Leveraging quasi-random variation in the timing and volume of policy-mandated bypass releases, we find that the experiment increased system-level generation costs by 2-6%. The implied economic value of water exceeded $30 per acre-foot, including replacement fuel costs, emission costs, and lost capacity value. Across 2024 and 2025, the flow experiment resulted in over $30 million in total economic costs driven by fossil-fuel substitution, split almost evenly between added fuel costs and emission costs. These findings inform the design of environmental flow regulations and electricity market policies as water scarcity intensifies and decarbonization goals become more prominent.
- 16 July 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessLost Power, Lost Value: Economic Costs of Hydroelectric Dam Water Bypass
Hydropower production in the U.S. operates within a complex regulatory framework balancing grid reliability, resource allocation, and environmental protection. Because power plants are tightly linked through the electricity grid, environmental flow regulations that alter hydropower production can trigger spillover effects across the broader generation fleet. This paper evaluates the economic impact of a recent environmental flow experiment requiring dam operators to bypass water rather than generate electricity. Leveraging quasi-random variation in the timing and volume of policy-mandated bypass releases, we find that the experiment increased system-level generation costs by 2-6%. The implied economic value of water exceeded $30 per acre-foot, including replacement fuel costs, emission costs, and lost capacity value. Across 2024 and 2025, the flow experiment resulted in over $30 million in total economic costs driven by fossil-fuel substitution, split almost evenly between added fuel costs and emission costs. These findings inform the design of environmental flow regulations and electricity market policies as water scarcity intensifies and decarbonization goals become more prominent.
- Open Access
- 3 June 2026
- Published by IOP Publishing in Environmental Research: Energy
- Vol. 3 (2)
Assessing the operational impact of hydropower over-simplification in national energy system models
Modeling energy systems with a large share of cascaded hydropower requires an adequate representation of reservoir and plant interactions within a national power system. However, many energy system models rely on simplified or aggregated hydropower representations that neglect hydraulic interconnections, affecting operational results. This study quantifies the compound impact of hydropower cascade simplification, comprising hydraulic topology, inflow representation, and parameters aggregation, on national power system modeling. A hydropower cascade formulation is integrated into the open-source Dispa-SET unit commitment and economic dispatch model and compared with two simplified formulations with different levels of hydraulic detail, typically applied in mid and long-term energy system models. The analysis is applied to the Bolivian power system, where hydropower represents a significant share of electricity generation. The results show that simplified formulations significantly impact system operation. Hydropower generation is overestimated during the wet season and underestimated during the dry season. This leads to operational cost underestimation of 7% and up to 28.9% during the wet season depending on the formulation, and affects key operational indicators, including transmission congestion, reservoir operation, and the detection of shed load events. These findings highlight the importance of explicitly representing hydropower cascade dynamics when assessing the operation of hydro-dominated national power systems.
- 3 June 2026
- Published by IOP Publishing in Environmental Research: Energy
- Vol. 3 (2)
Open AccessAssessing the operational impact of hydropower over-simplification in national energy system models
Modeling energy systems with a large share of cascaded hydropower requires an adequate representation of reservoir and plant interactions within a national power system. However, many energy system models rely on simplified or aggregated hydropower representations that neglect hydraulic interconnections, affecting operational results. This study quantifies the compound impact of hydropower cascade simplification, comprising hydraulic topology, inflow representation, and parameters aggregation, on national power system modeling. A hydropower cascade formulation is integrated into the open-source Dispa-SET unit commitment and economic dispatch model and compared with two simplified formulations with different levels of hydraulic detail, typically applied in mid and long-term energy system models. The analysis is applied to the Bolivian power system, where hydropower represents a significant share of electricity generation. The results show that simplified formulations significantly impact system operation. Hydropower generation is overestimated during the wet season and underestimated during the dry season. This leads to operational cost underestimation of 7% and up to 28.9% during the wet season depending on the formulation, and affects key operational indicators, including transmission congestion, reservoir operation, and the detection of shed load events. These findings highlight the importance of explicitly representing hydropower cascade dynamics when assessing the operation of hydro-dominated national power systems.
- Open Access
- 30 March 2026
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 235
Water value and market response functions in hydropower-dominated electricity systems: A systematic review and methodological comparison
- 30 March 2026
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 235
Open AccessWater value and market response functions in hydropower-dominated electricity systems: A systematic review and methodological comparison
- Open Access
- 1 March 2026
- Published by Office of Scientific and Technical Information (OSTI)
Loss of Glen Canyon Dam Hydropower Plant Capabilities
- 1 March 2026
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessLoss of Glen Canyon Dam Hydropower Plant Capabilities
- 29 December 2025
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in INFORMS Journal on Optimization
- Vol. 8 (3) , 230-247
Tightening the Difference-of-Convex Formulation for the Piecewise Linear Approximation in General Dimensions
This paper addresses the problem of tightening the mixed-integer linear programming (MILP) formulation for continuous piecewise linear (CPWL) approximations of data sets in arbitrary dimensions. The MILP formulation leverages the difference-of-convex (DC) representation of CPWL functions. We introduce the concept of well-behaved CPWL interpolations and demonstrate that any CPWL interpolation of a data set has a well-behaved version. This result is critical to tighten the MILP problem. We present six different strategies to tighten the problem, which include fixing the values of some variables, introducing additional constraints, identifying small big-M parameter values, and applying tighter variable bounds. These methods leverage key aspects of the DC representation and the inherent structure of well-behaved CPWL interpolations. Experimental results demonstrate that specific combinations of these tightening strategies lead to significant improvement in solution times, especially for tightening strategies that consider well-behaved CPWL solutions. Funding: Financial support from the Department of Energy Office of Energy Efficiency and Renewable Energy [Contract DE-AC02-06CH11357] is gratefully acknowledged. Supplemental Material: The electronic companion is available at https://doi.org/10.1287/ijoo.2025.0074 .
- 29 December 2025
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in INFORMS Journal on Optimization
- Vol. 8 (3) , 230-247
Tightening the Difference-of-Convex Formulation for the Piecewise Linear Approximation in General Dimensions
This paper addresses the problem of tightening the mixed-integer linear programming (MILP) formulation for continuous piecewise linear (CPWL) approximations of data sets in arbitrary dimensions. The MILP formulation leverages the difference-of-convex (DC) representation of CPWL functions. We introduce the concept of well-behaved CPWL interpolations and demonstrate that any CPWL interpolation of a data set has a well-behaved version. This result is critical to tighten the MILP problem. We present six different strategies to tighten the problem, which include fixing the values of some variables, introducing additional constraints, identifying small big-M parameter values, and applying tighter variable bounds. These methods leverage key aspects of the DC representation and the inherent structure of well-behaved CPWL interpolations. Experimental results demonstrate that specific combinations of these tightening strategies lead to significant improvement in solution times, especially for tightening strategies that consider well-behaved CPWL solutions. Funding: Financial support from the Department of Energy Office of Energy Efficiency and Renewable Energy [Contract DE-AC02-06CH11357] is gratefully acknowledged. Supplemental Material: The electronic companion is available at https://doi.org/10.1287/ijoo.2025.0074 .
- Open Access
- 1 December 2025
- Published by Office of Scientific and Technical Information (OSTI)
Post-2026 Environmental Impact Statement Rate Analysis for the Colorado River Storage Project
The Glen Canyon Dam (GCD) is a principal power-generating asset within the Colorado River Storage Project (CRSP), accounting for approximately 70–80% of CRSP power production over the past two decades. In June 2023, the U.S. Bureau of Reclamation (Reclamation) issued a Notice of Intent to prepare an Environmental Impact Statement (EIS) outlining operational guidelines and strategies for Colorado River Basin reservoirs after 2026 (Reclamation, 2023). Power generation is among CRSP’s statutory purposes under the Colorado River Storage Project Act of 1956 (U.S. Congress, 1956). Assessing how alternative policy frameworks affect CRSP power production and the resulting electricity rates for U.S. customers is therefore essential to inform decision-making. This report evaluates projected electricity rates and the market value of electricity from the Western Area Power Administration (WAPA) CRSP GCD under multiple post-2026 policy scenarios to support Reclamation’s EIS development. Results from advanced econometric and machine learning models indicate that the Enhanced Coordination alternative (EnhanCoor), Maximum Operational Flexibility alternative (CCA), and Supply Driven - 55 alternative (SD55) alternatives yield more favorable hydropower generation and capacity outcomes, which are objectives outlined in Reclamation’s documentations (Reclamation, 2007; Reclamation, 2016). Specifically, these scenarios are associated with higher electricity production, lower projected rate trajectories, and greater economic value to the U.S. power system from CRSP generation. The remaining five scenarios generally produce lower generation, higher rate trajectories, and reduced long-term market values.
- 1 December 2025
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessPost-2026 Environmental Impact Statement Rate Analysis for the Colorado River Storage Project
The Glen Canyon Dam (GCD) is a principal power-generating asset within the Colorado River Storage Project (CRSP), accounting for approximately 70–80% of CRSP power production over the past two decades. In June 2023, the U.S. Bureau of Reclamation (Reclamation) issued a Notice of Intent to prepare an Environmental Impact Statement (EIS) outlining operational guidelines and strategies for Colorado River Basin reservoirs after 2026 (Reclamation, 2023). Power generation is among CRSP’s statutory purposes under the Colorado River Storage Project Act of 1956 (U.S. Congress, 1956). Assessing how alternative policy frameworks affect CRSP power production and the resulting electricity rates for U.S. customers is therefore essential to inform decision-making. This report evaluates projected electricity rates and the market value of electricity from the Western Area Power Administration (WAPA) CRSP GCD under multiple post-2026 policy scenarios to support Reclamation’s EIS development. Results from advanced econometric and machine learning models indicate that the Enhanced Coordination alternative (EnhanCoor), Maximum Operational Flexibility alternative (CCA), and Supply Driven - 55 alternative (SD55) alternatives yield more favorable hydropower generation and capacity outcomes, which are objectives outlined in Reclamation’s documentations (Reclamation, 2007; Reclamation, 2016). Specifically, these scenarios are associated with higher electricity production, lower projected rate trajectories, and greater economic value to the U.S. power system from CRSP generation. The remaining five scenarios generally produce lower generation, higher rate trajectories, and reduced long-term market values.
- Open Access
- 1 September 2025
- Published by Office of Scientific and Technical Information (OSTI)
Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024
The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model [1] was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.
- 1 September 2025
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessFinancial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024
The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model [1] was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.
- Open Access
- 1 September 2025
- Published by Office of Scientific and Technical Information (OSTI)
Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023
The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017 [1]. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments [2–4]. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model [5] was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.
- 1 September 2025
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessFinancial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023
The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017 [1]. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments [2–4]. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model [5] was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.