AMAnastasiia Mishakova

Anastasiia Mishakova

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Anastasiia Mishakova has a total of 10 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Optimization of the characteristics of organizational and technological solutions aimed at reducing the impact of project risks

    by Anastasia A. Chereneva, Anastasia V. Mishakova, Anton E. Radaev

    Introduction. The research relevance is determined by the need of modern design and construction organizations to objectively estimate the impact of various categories of risks on the results of the construction projects’ implementation, as well as the limitations of existing tools used to justify the parameters for the implementation of construction projects, taking into account the risks of the internal and external environment. The mentioned above features determined the feasibility of conducting the research, which purpose is to develop the tools for determination of the characteristics for organizational and technological solutions aimed at reducing the impact of risks on the results of construction projects’ implementation. Materials and methods. The methodology of the substantiation of the characteristics of organizational and technological solutions aimed at reducing the impact of risks on the results of construction projects has been developed. The methodology assumes forming the analytical model of dependence of risk indicator value from parameters of the construction project to be realized (risk parameters) with further building and realization of an optimization model to substantiate changes of the ma-naged risk parameters on the basis of criteria of total expenses for realization of the indicated changes and actual values of indicators of negative influence of risk on the results of realization of construction project. Results. The developed method has been realized by the practical example, as a result of the corresponding calculation procedures the values of the parameters’ changes of the operating process of the investment and building organization of the oil and gas sector to provide the required values of the actual average (by objects) term of delay in putting into operation and the share of the objects put into operation on time have been obtained. Conclusions. Based on the results of the implementation of the proposed methodology on a practical example, the conclusion of a high practical significance of the developed tool has been made. The features of the developed method that reduce the area of its effective application have been identified, in particular, dependence of the adequacy of the results of the method realization on the adequacy of the analytical model of dependence of the risk indicator value on the para-meters of the ongoing construction project. For elimination of the revealed disadvantages, the updating of the methodology on the further stages of research is planned.

  • Open Access

    Feasibility of using of accelerated test methods for determination of frost-resistance for concrete

    by Anna Pavlenko, Anastasia Mishakova, Olga Pertseva, Victoriia Ivanova, Yanis Olekhnovich, Gleb Averchenko

    The article presents the results of studies of innovative materials in the field of testing frost resistance. In fact, present accelerated methods for the determination of concrete frost resistance have high labour consuming and low effectiveness. Moreover there is no such accelerated methods which can be sufficiently applicable fro different innovative concretes, for example, concretes with SAP or self-compacting concrete and so on. Therefore, it is highly important to investigate new accelerated test method with high operability, efficiency and sufficient precision. Previously, two new methods were developed. The main purpose of the research is to compare these methods by evaluation of their technology and accuracy and, consequently, to identify the more sustain and efficient one. First method is based on estimation of energy release due to mechanical fracture and thermo cycling. Second method consists of the calculation value z (relation between relative decreasing of strength and relative strain in the direction perpendicular to compression) and replacement of thermo cycles by mechanical cycles. Both methods have high operability and do not take a lot of time, in was tested on the 10 specimens made of concrete and results were compared with values derived by standard method.


  • Open Access

    Project Control Based on a Mutual Application of Pert and Earned Value Management Methods

    by Anastasiia Mishakova, Anna Vakhrushkina, Vera Murgul, Tatiana Sazonova