Rossy Armyn Machfudiyanto
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Rossy Armyn Machfudiyanto has a total of 89 co-authors. Here are the top co-authors by number of shared publications:
Y Latief
Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Jawa Barat 16424, Indonesia
14 shared publicationsYusuf Latief
Department of Civil and Environmental Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, West Java, 16424, Indonesia
12 shared publicationsAkhmad Suraji
5 shared publications- Titi Sari Nurul Rachmawati
Department of Civil and Environmental Engineering Faculty of Engineering, Universitas Indonesia Depok West Java Indonesia
5 shared publications Yoko Yogiswara
4 shared publications- Yusuf Latief
Department of Civil Engineering, Universitas Indonesia, Depok, Indonesia
4 shared publications
Latest Publications
- Open Access
LPS-UP: A digital simulation game for teaching the Last Planner System as a lean construction method
- Open Access
- 7 August 2026
- Published by Taylor & Francis in International Journal of Construction Management
- p. 1-26
Association rule mining for proactive hazard identification in construction work activities
The construction industry is one of the most dangerous and highest-risk industries that accounts for a significant portion of the worldwide occupational accident data (Berglund et al. 2021; Nouban ...
- 7 August 2026
- Published by Taylor & Francis in International Journal of Construction Management
- p. 1-26
Open AccessAssociation rule mining for proactive hazard identification in construction work activities
The construction industry is one of the most dangerous and highest-risk industries that accounts for a significant portion of the worldwide occupational accident data (Berglund et al. 2021; Nouban ...
- Open Access
Measuring Safety Culture Maturity in Indonesian Construction Projects Across Design and Construction Phases
This study maps the maturity of construction safety culture in Indonesia across the design and construction phases and identifies priorities for improving the safety management system in construction. Building on a literature-derived framework of categories and subcategories, we conducted a two-round questionnaire-based expert elicitation (pilot and final rounds) and focus group discussions (FGDs) with a purposive panel of 12 experts representing key stakeholders (government/owners, contractors, consultants, and academia). Expert validation was used to assess alignment with field conditions and refine recommendations. The results show average maturity scores of 3.11 in the design phase and 3.36 in the construction phase, indicating a position between the compliant and proactive levels. Sub-category analysis indicates comparatively stronger performance in regulatory mechanisms and operational controls but persistent weaknesses in early-stage planning competence, time and resource allocation for safety, digitalization of safety management, and hazardous waste management. A cross-phase gap is evident: safety is more institutionalized during execution than it is embedded in upstream design decisions. The findings suggest that advancing beyond compliance requires an integrated approach that links national regulations with international project management guidance and construction-specific practices. We conclude by outlining how these frameworks’ integration can support a transition toward more proactive and ultimately resilient safety culture maturity in Indonesia’s construction sector.
Open AccessMeasuring Safety Culture Maturity in Indonesian Construction Projects Across Design and Construction Phases
This study maps the maturity of construction safety culture in Indonesia across the design and construction phases and identifies priorities for improving the safety management system in construction. Building on a literature-derived framework of categories and subcategories, we conducted a two-round questionnaire-based expert elicitation (pilot and final rounds) and focus group discussions (FGDs) with a purposive panel of 12 experts representing key stakeholders (government/owners, contractors, consultants, and academia). Expert validation was used to assess alignment with field conditions and refine recommendations. The results show average maturity scores of 3.11 in the design phase and 3.36 in the construction phase, indicating a position between the compliant and proactive levels. Sub-category analysis indicates comparatively stronger performance in regulatory mechanisms and operational controls but persistent weaknesses in early-stage planning competence, time and resource allocation for safety, digitalization of safety management, and hazardous waste management. A cross-phase gap is evident: safety is more institutionalized during execution than it is embedded in upstream design decisions. The findings suggest that advancing beyond compliance requires an integrated approach that links national regulations with international project management guidance and construction-specific practices. We conclude by outlining how these frameworks’ integration can support a transition toward more proactive and ultimately resilient safety culture maturity in Indonesia’s construction sector.
- Open Access
- 12 August 2025
- Published by Universitas Gadjah Mada in Journal of the Civil Engineering Forum
- p. 322-333
Importance vs. Performance: Evaluating the Implementation of Learning from Incidents in Indonesian Construction Industry
The construction industry, recognized as one of the most hazardous sectors globally, continues to face escalating challenges, particularly in Indonesia. This sector experiences a yearly increase in workplace accidents, which significantly disrupts economic stability at both micro and macro levels. These incidents lead to substantial economic losses, reduced productivity, and increased medical and compensation costs. To address these risks, the adoption of Learning from Incidents (LFI) has emerged as a critical approach. LFI is a structured process that involves analysing and learning from past incidents to prevent future occurrences, offering a proven methodology to enhance workplace safety. However, despite its potential, the implementation of LFI in Indonesia encounters persistent obstacles. These include a weak safety culture, inadequate reporting systems, and insufficient enforcement of safety standards. Such challenges hinder the effectiveness of LFI and limit its capacity to drive meaningful improvements in construction safety. This study seeks to bridge the gap between the importance and current performance of LFI implementation in the Indonesian construction industry. The research methodology integrates a literature review, expert validation, and Importance-Performance Analysis. Through the literature review and expert validation, critical indicators for LFI implementation were identified, while the Importance-Performance Analysis assessed the alignment of expectations with actual performance as perceived by construction practitioners. Input from three construction safety experts and industry practitioners formed the basis of the analysis. The findings reveal that while Investigation Participation met or exceeded expectations, several other LFI implementation indicators–including Contextual Safety Engineering and Dissemination Reach–require substantial improvement. This consensus highlights significant discrepancies between intended outcomes and actual practices, underscoring the need for targeted strategies to enhance LFI processes. Addressing these gaps can better align LFI implementation with safety objectives, ultimately fostering a safer and more sustainable construction industry in Indonesia.
- 12 August 2025
- Published by Universitas Gadjah Mada in Journal of the Civil Engineering Forum
- p. 322-333
Open AccessImportance vs. Performance: Evaluating the Implementation of Learning from Incidents in Indonesian Construction Industry
The construction industry, recognized as one of the most hazardous sectors globally, continues to face escalating challenges, particularly in Indonesia. This sector experiences a yearly increase in workplace accidents, which significantly disrupts economic stability at both micro and macro levels. These incidents lead to substantial economic losses, reduced productivity, and increased medical and compensation costs. To address these risks, the adoption of Learning from Incidents (LFI) has emerged as a critical approach. LFI is a structured process that involves analysing and learning from past incidents to prevent future occurrences, offering a proven methodology to enhance workplace safety. However, despite its potential, the implementation of LFI in Indonesia encounters persistent obstacles. These include a weak safety culture, inadequate reporting systems, and insufficient enforcement of safety standards. Such challenges hinder the effectiveness of LFI and limit its capacity to drive meaningful improvements in construction safety. This study seeks to bridge the gap between the importance and current performance of LFI implementation in the Indonesian construction industry. The research methodology integrates a literature review, expert validation, and Importance-Performance Analysis. Through the literature review and expert validation, critical indicators for LFI implementation were identified, while the Importance-Performance Analysis assessed the alignment of expectations with actual performance as perceived by construction practitioners. Input from three construction safety experts and industry practitioners formed the basis of the analysis. The findings reveal that while Investigation Participation met or exceeded expectations, several other LFI implementation indicators–including Contextual Safety Engineering and Dissemination Reach–require substantial improvement. This consensus highlights significant discrepancies between intended outcomes and actual practices, underscoring the need for targeted strategies to enhance LFI processes. Addressing these gaps can better align LFI implementation with safety objectives, ultimately fostering a safer and more sustainable construction industry in Indonesia.
- Open Access
- 30 April 2025
- Published by Universitas Pancasila in Jurnal Infrastruktur
- Vol. 11 (1) , 35-43
IDENTIFICATION OF CONSTRUCTION SAFETY RISKS FOR IRRIGATION NETWORK PROJECT BASED ON THE WORK BREAKDOWN STRUCTURE (WBS) TO IMPROVE CONSTRUCTION SAFETY PERFORMANCE
The construction sector in Indonesia faces a high risk of occupational accidents, particularly in irrigation network projects. This study develops a standardized Work Breakdown Structure (WBS) for irrigation projects to improve safety performance. The WBS standard, detailed into 177 activities across five levels, enables precise identification of safety risks during project planning. Utilizing expert validation through the Delphi Method, 708 risk variables were identified, with 25 dominant risks grouped into three main categories: heavy equipment-related accidents (material lifting failures and traffic collisions) and electric shocks. This framework enhances the implementation of preventive measures and aligns safety management systems with construction activities. Findings reveal that material lifting failures with mobile cranes, traffic-related heavy equipment accidents, and electric shocks are the most significant risks. Integrating WBS-based safety planning during pre-construction improves project safety performance, reduces costs, and enhances sustainability. This research highlights the critical need for comprehensive safety strategies tailored to irrigation projects.
- 30 April 2025
- Published by Universitas Pancasila in Jurnal Infrastruktur
- Vol. 11 (1) , 35-43
Open AccessIDENTIFICATION OF CONSTRUCTION SAFETY RISKS FOR IRRIGATION NETWORK PROJECT BASED ON THE WORK BREAKDOWN STRUCTURE (WBS) TO IMPROVE CONSTRUCTION SAFETY PERFORMANCE
The construction sector in Indonesia faces a high risk of occupational accidents, particularly in irrigation network projects. This study develops a standardized Work Breakdown Structure (WBS) for irrigation projects to improve safety performance. The WBS standard, detailed into 177 activities across five levels, enables precise identification of safety risks during project planning. Utilizing expert validation through the Delphi Method, 708 risk variables were identified, with 25 dominant risks grouped into three main categories: heavy equipment-related accidents (material lifting failures and traffic collisions) and electric shocks. This framework enhances the implementation of preventive measures and aligns safety management systems with construction activities. Findings reveal that material lifting failures with mobile cranes, traffic-related heavy equipment accidents, and electric shocks are the most significant risks. Integrating WBS-based safety planning during pre-construction improves project safety performance, reduces costs, and enhances sustainability. This research highlights the critical need for comprehensive safety strategies tailored to irrigation projects.
- Open Access
- 30 April 2025
- Published by Universitas Pancasila in Jurnal Infrastruktur
- Vol. 11 (1) , 27-33
THE IMPLEMENTATION OF WORK BREAKDOWN STRUCTURE IN PREVENTIVE MAINTENANCE OF TOTAL FIRE SYSTEM (PMTFS) TO IMPROVE BUILDING RELIABILITY
This study examines the implementation of a Work Breakdown Structure (WBS) in the preventive maintenance of the Total Fire System (TFS) to enhance building safety and reliability. Poor maintenance practices can compromise these aspects, increasing fire risks due to inadequately maintained fire protection systems. Utilizing WBS, the study breaks down maintenance tasks into manageable components, improving clarity and effectiveness in planning, execution, and documentation. The hierarchical WBS framework, validated through expert feedback via the Delphi method, was applied in a case study at the Faculty of Computer Science building at the University of Indonesia. The case study demonstrated significant improvements in operational efficiency and compliance with fire safety regulations. WBS enhances task clarity, allows effective scheduling of maintenance activities, and establishes a reliable documentation system. Key benefits of WBS include optimized resource use, cost savings, improved team collaboration, and extended lifespan of fire safety systems. To implement WBS effectively, the study recommends comprehensive training for maintenance teams, fostering collaboration among stakeholders, and adopting continuous improvement practices. In conclusion, this study illustrates that WBS significantly enhances TFS maintenance effectiveness and can be applied across various building types, promoting structured and efficient maintenance practices to improve safety and reliability.
- 30 April 2025
- Published by Universitas Pancasila in Jurnal Infrastruktur
- Vol. 11 (1) , 27-33
Open AccessTHE IMPLEMENTATION OF WORK BREAKDOWN STRUCTURE IN PREVENTIVE MAINTENANCE OF TOTAL FIRE SYSTEM (PMTFS) TO IMPROVE BUILDING RELIABILITY
This study examines the implementation of a Work Breakdown Structure (WBS) in the preventive maintenance of the Total Fire System (TFS) to enhance building safety and reliability. Poor maintenance practices can compromise these aspects, increasing fire risks due to inadequately maintained fire protection systems. Utilizing WBS, the study breaks down maintenance tasks into manageable components, improving clarity and effectiveness in planning, execution, and documentation. The hierarchical WBS framework, validated through expert feedback via the Delphi method, was applied in a case study at the Faculty of Computer Science building at the University of Indonesia. The case study demonstrated significant improvements in operational efficiency and compliance with fire safety regulations. WBS enhances task clarity, allows effective scheduling of maintenance activities, and establishes a reliable documentation system. Key benefits of WBS include optimized resource use, cost savings, improved team collaboration, and extended lifespan of fire safety systems. To implement WBS effectively, the study recommends comprehensive training for maintenance teams, fostering collaboration among stakeholders, and adopting continuous improvement practices. In conclusion, this study illustrates that WBS significantly enhances TFS maintenance effectiveness and can be applied across various building types, promoting structured and efficient maintenance practices to improve safety and reliability.
- Open Access
- 30 April 2025
- Published by Universitas Pancasila in Jurnal Infrastruktur
- Vol. 11 (1) , 45-52
THE INFLUENCE OF POLICY ON SMELTER DEVELOPMENT PROJECTS ON IMPROVING PROJECT TIME PERFORMANCE
To facilitate downstreaming in mining industry, the law requires holders of Mining Business Permits (IUP) and Work Contracts (KK) to establish smelters, namely mining processing facilities that function to increase metal content to a level that meets standards as raw materials for final products. From the policy factors found that policy has a role in the problem of delays in smelter construction in Indonesia. Therefore, evaluation and improvement of regulations as a solution to the problem need to be carried out so that smelter construction as an effort to implement mining downstreaming can be implemented properly. The study was conducted by collecting qualitative primary data which was analyzed using Structural Equation Modeling (SEM). In the relationship between policy variables and project time performance variables, Variable X3 Supervision and Variable X6 Force Majeure has a significant effect on the project time performance variable, while other variables do not have a significant effect.
- 30 April 2025
- Published by Universitas Pancasila in Jurnal Infrastruktur
- Vol. 11 (1) , 45-52
Open AccessTHE INFLUENCE OF POLICY ON SMELTER DEVELOPMENT PROJECTS ON IMPROVING PROJECT TIME PERFORMANCE
To facilitate downstreaming in mining industry, the law requires holders of Mining Business Permits (IUP) and Work Contracts (KK) to establish smelters, namely mining processing facilities that function to increase metal content to a level that meets standards as raw materials for final products. From the policy factors found that policy has a role in the problem of delays in smelter construction in Indonesia. Therefore, evaluation and improvement of regulations as a solution to the problem need to be carried out so that smelter construction as an effort to implement mining downstreaming can be implemented properly. The study was conducted by collecting qualitative primary data which was analyzed using Structural Equation Modeling (SEM). In the relationship between policy variables and project time performance variables, Variable X3 Supervision and Variable X6 Force Majeure has a significant effect on the project time performance variable, while other variables do not have a significant effect.
- Open Access
- 28 February 2025
- Published by International Information and Engineering Technology Association in International Journal of Safety and Security Engineering
- Vol. 15 (02) , 339-347
Determinant Factors Affecting Design for Safety in Planning Stage of High-Rise Building
- 28 February 2025
- Published by International Information and Engineering Technology Association in International Journal of Safety and Security Engineering
- Vol. 15 (02) , 339-347
Open AccessDeterminant Factors Affecting Design for Safety in Planning Stage of High-Rise Building
- Open Access
- 31 December 2024
- Published by International Information and Engineering Technology Association in International Journal of Safety and Security Engineering
- Vol. 14 (6) , 1913-1919
Enhancing Safety Culture Among Subcontractors to Improve Safety Performance in the Indonesian Construction Industry
- 31 December 2024
- Published by International Information and Engineering Technology Association in International Journal of Safety and Security Engineering
- Vol. 14 (6) , 1913-1919
Open AccessEnhancing Safety Culture Among Subcontractors to Improve Safety Performance in the Indonesian Construction Industry