Suman Chattopadhyay
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Suman Chattopadhyay has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Sudip Ghosh
IIEST Shibpur
5 shared publications Sudip Ghosh
2 shared publications- Dibyendu Roy
Indian Institute of Engineering Science and Technology
1 shared publication - Pradip Mondal
IIEST Shibpur
1 shared publication Rajeev Awasthi
1 shared publication
Latest Publications
- Open Access
- 6 October 2020
- Published by Springer Nature in Journal of the Brazilian Society of Mechanical Sciences and Engineering
- Vol. 42 (11) , 1-18
Thermo-economic assessment of a hybrid tri-generation system making simultaneous use of biomass and solar energy
- 6 October 2020
- Published by Springer Nature in Journal of the Brazilian Society of Mechanical Sciences and Engineering
- Vol. 42 (11) , 1-18
Open AccessThermo-economic assessment of a hybrid tri-generation system making simultaneous use of biomass and solar energy
- 12 March 2020
- Published by Springer Nature in Clean Technologies and Environmental Policy
- Vol. 22 (4) , 907-922
Techno-economic assessment of a biomass-based combined power and cooling plant for rural application
- 12 March 2020
- Published by Springer Nature in Clean Technologies and Environmental Policy
- Vol. 22 (4) , 907-922
Techno-economic assessment of a biomass-based combined power and cooling plant for rural application
- Open Access
- 1 July 2019
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1240 (1)
Integration of solar charged PCM storage with VAR system for low capacity vegetable cold storage
In this work a solar-assisted vapour absorption refrigeration (VAR) system, suitable for 10 MT vegetable cold storage for a small village, has been modelled and analysed for day-night operation. Solar parabolic trough collector (PTC) has been considered for integration with a LiBr-H2O based VAR system. Thermal energy from solar thermal system is stored in a phase change material (PCM) energy storage, which is integrated with the VAR system. Apart from system integration, operational strategy of the storage based system has been evolved and performance of the system on hourly basis for representative days has been reported. The PCM quantity and the number of PTC modules have been decided based on the cooling demand. Hitec salt has been considered as PCM material. The study reveals that 5 PTC modules, each of 30 m2aperture area, and a PCM mass of 12.5 ton can effectively cater the energy demand of the VAR system to successfully maintain the 10 MT cold room at 6 °C.
- 1 July 2019
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1240 (1)
Open AccessIntegration of solar charged PCM storage with VAR system for low capacity vegetable cold storage
In this work a solar-assisted vapour absorption refrigeration (VAR) system, suitable for 10 MT vegetable cold storage for a small village, has been modelled and analysed for day-night operation. Solar parabolic trough collector (PTC) has been considered for integration with a LiBr-H2O based VAR system. Thermal energy from solar thermal system is stored in a phase change material (PCM) energy storage, which is integrated with the VAR system. Apart from system integration, operational strategy of the storage based system has been evolved and performance of the system on hourly basis for representative days has been reported. The PCM quantity and the number of PTC modules have been decided based on the cooling demand. Hitec salt has been considered as PCM material. The study reveals that 5 PTC modules, each of 30 m2aperture area, and a PCM mass of 12.5 ton can effectively cater the energy demand of the VAR system to successfully maintain the 10 MT cold room at 6 °C.
- Open Access
- 1 June 2018
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 377 (1) , 012003
Feasibility study of a biomass gasification based combined power and cooling plant for an off-grid village
This paper presents a feasibility study of a biomass gasification based combined power and cooling plant for an off-grid village to meet its energy needs in a sustainable way. The total electrical demand for a village has been estimated based on various applications. Based on the electrical demand, a biomass gasification based gas turbine (GT) unit of 100 kW net electrical output has been modelled. An ammonia absorption refrigeration unit has been integrated with the GT unit to recover the waste heat and to run a cold storage. This plant has the capability of producing a cooling effect varying in the range of 150-400 kW. The combined cycle plant has a predicted maximum electrical efficiency of 23%, for a GT cycle pressure ratio of 8 and a GT inlet air temperature of 1000°C. The refrigeration capacity of the plant at this condition is 150 kW and the corresponding biomass consumption is 96 kg/h. It has been shown that the plant has the capability of meet the electrical demand of the village as well as to run a cold storage, considering 8-10 hrs of daily operation time.
- 1 June 2018
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 377 (1) , 012003
Open AccessFeasibility study of a biomass gasification based combined power and cooling plant for an off-grid village
This paper presents a feasibility study of a biomass gasification based combined power and cooling plant for an off-grid village to meet its energy needs in a sustainable way. The total electrical demand for a village has been estimated based on various applications. Based on the electrical demand, a biomass gasification based gas turbine (GT) unit of 100 kW net electrical output has been modelled. An ammonia absorption refrigeration unit has been integrated with the GT unit to recover the waste heat and to run a cold storage. This plant has the capability of producing a cooling effect varying in the range of 150-400 kW. The combined cycle plant has a predicted maximum electrical efficiency of 23%, for a GT cycle pressure ratio of 8 and a GT inlet air temperature of 1000°C. The refrigeration capacity of the plant at this condition is 150 kW and the corresponding biomass consumption is 96 kg/h. It has been shown that the plant has the capability of meet the electrical demand of the village as well as to run a cold storage, considering 8-10 hrs of daily operation time.
- 13 February 2018
- Published by Springer Nature in Journal of the Brazilian Society of Mechanical Sciences and Engineering
- Vol. 40 (3) , 134
Combined energetic and exergetic assessment of a biomass-based integrated power and refrigeration plant
- 13 February 2018
- Published by Springer Nature in Journal of the Brazilian Society of Mechanical Sciences and Engineering
- Vol. 40 (3) , 134
Combined energetic and exergetic assessment of a biomass-based integrated power and refrigeration plant
- 1 January 2017
- Published by Inderscience Publishers in International Journal of Renewable Energy Technology
- Vol. 8 (3/4) , 222
Comparative energetic and exergetic studies of vapour compression and vapour absorption refrigeration cycles
In this study, two types of refrigeration cycles, a vapour compression refrigeration (VCR) cycle and a vapour absorption refrigeration (VAR) cycle, have been modelled and analysed. Both the cycles have same operating cooling loads and both operate between the same temperature limits. R134a has been considered as refrigerant for the VCR cycle whereas LiBr-H
- 1 January 2017
- Published by Inderscience Publishers in International Journal of Renewable Energy Technology
- Vol. 8 (3/4) , 222
Comparative energetic and exergetic studies of vapour compression and vapour absorption refrigeration cycles
In this study, two types of refrigeration cycles, a vapour compression refrigeration (VCR) cycle and a vapour absorption refrigeration (VAR) cycle, have been modelled and analysed. Both the cycles have same operating cooling loads and both operate between the same temperature limits. R134a has been considered as refrigerant for the VCR cycle whereas LiBr-H
- 12 July 2016
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1754 (1) , 050008
Simulated performance of biomass gasification based combined power and refrigeration plant for community scale application
Thermal performance analysis and sizing of a biomass gasification based combined power and refrigeration plant (CPR) is reported in this study. The plant is capable of producing 100 kWe of electrical output while simultaneously producing a refrigeration effect, varying from 28-68 ton of refrigeration (TR). The topping gas turbine cycle is an indirectly heated all-air cycle. A combustor heat exchanger duplex (CHX) unit burns producer gas and transfer heat to air. This arrangement avoids complex gas cleaning requirements for the biomass-derived producer gas. The exhaust air of the topping GT is utilized to run a bottoming ammonia absorption refrigeration (AAR) cycle via a heat recovery steam generator (HRSG), steam produced in the HRSG supplying heat to the generator of the refrigeration cycle. Effects of major operating parameters like topping cycle pressure ratio (rp) and turbine inlet temperature (TIT) on the energetic performance of the plant are studied. Energetic performance of the plant is evaluated via energy efficiency, required biomass consumption and fuel energy savings ratio (FESR). The FESR calculation method is significant for indicating the savings in fuel of a combined power and process heat plant instead of separate plants for power and process heat. The study reveals that, topping cycle attains maximum power efficiency of 30%in pressure ratio range of 8-10. Up to a certain value of pressure ratio the required air flow rate through the GT unit decreases with increase in pressure ratio and then increases with further increase in pressure ratio. The capacity of refrigeration of the AAR unit initially decreases up to a certain value of topping GT cycle pressure ratio and then increases with further increase in pressure ratio. The FESR is found to be maximized at a pressure ratio of 9 (when TIT=1100°C), the maximum value being 53%. The FESR is higher for higher TIT. The heat exchanger sizing is also influenced by the topping cycle pressure ratio and GT-TIT.
- 12 July 2016
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1754 (1) , 050008
Simulated performance of biomass gasification based combined power and refrigeration plant for community scale application
Thermal performance analysis and sizing of a biomass gasification based combined power and refrigeration plant (CPR) is reported in this study. The plant is capable of producing 100 kWe of electrical output while simultaneously producing a refrigeration effect, varying from 28-68 ton of refrigeration (TR). The topping gas turbine cycle is an indirectly heated all-air cycle. A combustor heat exchanger duplex (CHX) unit burns producer gas and transfer heat to air. This arrangement avoids complex gas cleaning requirements for the biomass-derived producer gas. The exhaust air of the topping GT is utilized to run a bottoming ammonia absorption refrigeration (AAR) cycle via a heat recovery steam generator (HRSG), steam produced in the HRSG supplying heat to the generator of the refrigeration cycle. Effects of major operating parameters like topping cycle pressure ratio (rp) and turbine inlet temperature (TIT) on the energetic performance of the plant are studied. Energetic performance of the plant is evaluated via energy efficiency, required biomass consumption and fuel energy savings ratio (FESR). The FESR calculation method is significant for indicating the savings in fuel of a combined power and process heat plant instead of separate plants for power and process heat. The study reveals that, topping cycle attains maximum power efficiency of 30%in pressure ratio range of 8-10. Up to a certain value of pressure ratio the required air flow rate through the GT unit decreases with increase in pressure ratio and then increases with further increase in pressure ratio. The capacity of refrigeration of the AAR unit initially decreases up to a certain value of topping GT cycle pressure ratio and then increases with further increase in pressure ratio. The FESR is found to be maximized at a pressure ratio of 9 (when TIT=1100°C), the maximum value being 53%. The FESR is higher for higher TIT. The heat exchanger sizing is also influenced by the topping cycle pressure ratio and GT-TIT.