LSLuis Alberto Rosa Sierra

Luis Alberto Rosa Sierra

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Luis Alberto Rosa Sierra has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Scrap denim-PP composites as a material for new product design

    by Jaime Francisco Gómez Gómez, Francisco Javier González Madariaga, Luis Alberto Rosa Sierra, Ruth Maribel León Morán

    The growing interest of manufacturing companies to use its scraps as raw material to design and develop alternate products has led them to news ways of processing them. The present project arises from a jeans manufacturing company’s interest on making an effort to reuse its daily denim scrap to manufacture a different kind of product without diversifying its capabilities. Some studies on denim-binder mixtures have been previously performed, amongst which binders such as corn starch and vinyl adhesives were used. In the present work some preliminary findings are shown using denim in its woven form combined with polypropylene, a common waste worldwide. The goal of this project is based on the assessment of some of the mechanical properties from the obtained mixtures in order to determine their attributes and possible fields of application in the process of designing new products. For that purpose, the materials’ testing was structured in four stages regarding the variables linked to the diversification of the mixes. In the first stage a sandwich-like material was prepared, consisting of two denim skins and a polypropylene core. In the second stage a multilayered “film-stacking” material was developed. In the third stage, a combination was developed consisting of polypropylene mixed with 5% weight of shredded denim. Based on these preliminary findings and the inherent attributes of denim, the fourth stage is a first attempt to use the obtained materials to design new products. In this process an introductory material-product mapping was used in order to provide early insights and define scenarios and user profiles. The results of the whole process yield a first approach to configure future experiments using combinations of denim scrap and other thermoplastic polymers in order to use them in new product development.DOI: http://dx.doi.org/10.4995/IFDP.2016.3360


  • Open Access

    Ecodesign assessment information an important tool for the design of new elements for building construction

    by Francisco Javier González Madariaga, Luis A. Rosa Sierra, Jaime F. Gómez Gómez

    This paper reports some aspects about a new wallboard panel for building construction, a few facts from the materials research involved in the wallboard production and the design process carried on are reported too. The research done on the new panel eventually became in a whole new building construction system but more specific technical information about the system and the panel´s technical profile can be found in other publications, here has been privileged the discussion about the environmental impact produced by the new system´s in a whole. The flat panel is produced mainly with a nucleus of gypsum and water plaster, during its process that mixture has been enriched with agave dry fibers and polystyrene expanded plastic particles those materials cooperate to produce a light and resistant flat building construction product, both materials, dry fibers and plastic are materials recovered from the urban waste flow, this is a environmental benefit by itself. Wallboards samples were produced according several formulas and under different conditions, after they all were tested in labs. The project named “Design a building construction system based on an innovative flat panel produced with gypsum plaster, expanded plastic particles and agave dry fibers as reinforcement” is a six stages research project: a) Background, b) Preliminary lab works, c) Experimental stage 1, d). Experimental stage 2, e) Design and product development, and, f). Eco design assessment. Today all of project stages show a great advance, and the research team works on a detailed design for a new building construction system. As can be noticed in the project’s framework, one of the main objectives for the system is to reach a less ecological impact than other similar products. In order to verify that those goals have been reached, an Ecodesign assessment was carried on by the research team. In this paper the assessment procedure and some data output are brought to discussion.DOI: http://dx.doi.org/10.4995/IFDP.2016.3368