P.J. Le Roux
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Interests
P.J. Le Roux has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
F.P. Janse van Rensburg
Harmony Gold Mining Company Limited
1 shared publicationK.R. Brentley
Brentley, Lucas & Associates
1 shared publicationT.R. Stacey
University of the Witwatersrand, South Africa
1 shared publication
Latest Publications
- Open Access
- 1 January 2019
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 119 (4) , 369-376
Time-dependent failure of open stopes at Target Mine
There are numerous factors that affect open stope stability and often result in falls of ground. These falls of ground can be attributed to factors such as beam failure due to a larger than normal roof area (hydraulic radius too large), adverse ground conditions, seismicity, the stress-strain environment, absence of support, and poor drill-and-blast practices. The effect of time on the stability of open stopes is sometimes underestimated and is relatively unknown, especially on Target Mine. Actual data was collected from open stopes at Target and analysed to show the effect of time on open stope stability. The benefits of this analysis will include improved understanding of time-dependent failure, which can assist in reducing dilution and the risk of sterilization of future mining blocks.
- 1 January 2019
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 119 (4) , 369-376
Open AccessTime-dependent failure of open stopes at Target Mine
There are numerous factors that affect open stope stability and often result in falls of ground. These falls of ground can be attributed to factors such as beam failure due to a larger than normal roof area (hydraulic radius too large), adverse ground conditions, seismicity, the stress-strain environment, absence of support, and poor drill-and-blast practices. The effect of time on the stability of open stopes is sometimes underestimated and is relatively unknown, especially on Target Mine. Actual data was collected from open stopes at Target and analysed to show the effect of time on open stope stability. The benefits of this analysis will include improved understanding of time-dependent failure, which can assist in reducing dilution and the risk of sterilization of future mining blocks.
- Open Access
- 1 January 2017
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 117 (2) , 133-142
Value creation in a mine operating with open stoping mining methods
Mining companies are under constant pressure to reduce their cost structures to sustain profitability. In mines using an open stoping mining method, dilution often has a significant effect on profitability. At Target mine in South Africa, dilution in some open stopes was found to exceed 10%, falls of ground being a major contributor to the problem. This dilution can reduce the recovered grade from 5.5 to 4.5 g/t, resulting in a potential loss of about R21 million per month based on a gold price of R240 000 per kilogram. In addition to the cost of dilution, the cost of damage to, or loss of, trackless equipment as a direct result of falls of ground in open stopes is significant. Other associated costs include transport, hoisting, secondary blasting, milling, and plant treatment of waste material. Stable open stopes are essential in order to reduce falls of ground. Back-analyses of stope instability at Target mine have indicated that conventional rock mass failure criteria are unsuitable for stope design. An alternative strain-based criterion has been developed, and has proved to be very successful, allowing the stability of open stopes to be calculated reliably. Since its implementation in 2010, dilution and equipment damage have decreased markedly, creating value for the mine.
- 1 January 2017
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 117 (2) , 133-142
Open AccessValue creation in a mine operating with open stoping mining methods
Mining companies are under constant pressure to reduce their cost structures to sustain profitability. In mines using an open stoping mining method, dilution often has a significant effect on profitability. At Target mine in South Africa, dilution in some open stopes was found to exceed 10%, falls of ground being a major contributor to the problem. This dilution can reduce the recovered grade from 5.5 to 4.5 g/t, resulting in a potential loss of about R21 million per month based on a gold price of R240 000 per kilogram. In addition to the cost of dilution, the cost of damage to, or loss of, trackless equipment as a direct result of falls of ground in open stopes is significant. Other associated costs include transport, hoisting, secondary blasting, milling, and plant treatment of waste material. Stable open stopes are essential in order to reduce falls of ground. Back-analyses of stope instability at Target mine have indicated that conventional rock mass failure criteria are unsuitable for stope design. An alternative strain-based criterion has been developed, and has proved to be very successful, allowing the stability of open stopes to be calculated reliably. Since its implementation in 2010, dilution and equipment damage have decreased markedly, creating value for the mine.