DKDaoud Kiomjian

Daoud Kiomjian

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Daoud Kiomjian has a total of 5 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Factors Affecting Knowledge Sharing Intentions among Construction Workers: The Case of Lebanon

    by Hala Sanboskani, Daoud Kiomjian, Issam Srour

    Construction knowledge is tacit; thus, it resides in the minds of its bearers. The flow of this knowledge depends more on the attitudes and intentions of individuals than it does on the wishes and desires of upper management. Consequently, exploring the drivers of these individual attitudes and intentions is critical for understanding how knowledge flows in construction organizations. This paper builds the case for studying the current state of knowledge sharing among construction workers. It also presents the preliminary findings of a survey of construction labor working on a set of projects in Lebanon. The survey focuses on the different drivers of knowledge sharing intentions among construction workers, namely social, internal, and organizational drivers. Social drivers include factors such as reciprocal relationships. Internal drivers describe individual attitudes, whereas organizational drivers relate to fairness and affiliation with the organization. Preliminary findings indicate that workers in the Lebanese construction companies have generally positive intentions to share knowledge with their colleagues. This paper is part of a research initiative that aims at using data analytics and advanced statistical models to determine the underlying relations among these drivers and their impact on knowledge sharing. The ultimate findings aim to provide regional contractors with strategies for fostering knowledge sharing thereby improving productivity on construction sites.


  • Knowledge Sharing and Productivity Improvement: An Agent-Based Modeling Approach

    by Daoud Kiomjian, Issam Srour, F. Jordan Srour

    Labor productivity is a major determinant of project performance in construction. Models of labor productivity in construction tend to focus on learning curve theories that assume learning is an individual process with no transfer of knowledge among crew members. This paper seeks to extend theories of individual learning to capture the crew dynamics present on construction sites. Accordingly, this paper presents an agent-based model aimed at deriving the impacts of crew composition and project schedule on knowledge sharing and, thus, on task duration. The proposed model was calibrated using field observations of 201 interactions among 12 construction workers at a construction project in Beirut, Lebanon. The results indicate that more diverse crews witness higher levels of knowledge sharing and greater productivity gains. The results also suggest that schedules keeping all the workers busy eliminate the potential for knowledge sharing and thus only benefit from the baseline gains seen in individual learning. This work contributes to the literature by developing an agent-based model that simulates knowledge sharing in the construction industry at the worker level. The study is limited by its exclusion of multiskilled workers.


  • DIVERSITY AND KNOWLEDGE SHARING IN CONSTRUCTION: A MATHEMATICAL MODEL

    by Daoud Kiomjian, F. Jordan Srour, Issam Srour

    Conventional wisdom in the management literature holds that diversity is positively correlated with performance. Yet, the findings from the construction field indicate that this is not always the case. In an effort to study the interaction between diversity and performance in the construction industry, this paper presents the elements of a theoretical mathematical model to explore the relationship between diversity and knowledge sharing which is a precursor of performance. This model includes five dimensions of diversity: ethnicity, age, experience, language and education. At the heart of the mathematical model is a fuzzy based system that generates the probability of knowledge sharing among members with different demographic attributes. The presented fuzzy system will, in future work, become the foundation of an agent based model used to study the impact of worker interactions on productivity.

  • Automating the Use of Learning Curve Models in Construction Task Duration Estimates

    by F. Jordan Srour, Daoud Kiomjian, Issam M. Srour

    Standard scheduling tools for construction projects with repetitive tasks assume that labor productivity remains constant throughout the project lifetime. None of these tools accommodate the dynamics of learning throughout the project. This paper introduces a tool that uses nonlinear optimization to integrate learning curve concepts into task duration estimates for construction project scheduling. The tool, featuring a graphical user interface, mines past data to select the most appropriate learning model from a suite of existing models. Testing the tool on data obtained from five published case studies with varying sizes and locations suggests that the tool offers accurate estimates for task completion times, even when the size or quality of the input data is minimal. Directives for use of this tool and an estimate of potential savings in practice are also provided through an example based on real-world data. These savings amounted to 28% of the overall labor costs within the real-world project. The contribution of this paper is a tool to estimate construction task durations in such a way that learning is incorporated. The tool uses nonlinear optimization to select and calibrate the best learning model making the tool of value to practitioners working across a variety of linear and nonlinear repetitive projects in a range of geographical regions.


  • Addressing Quality Problems in the Construction Industry: An Agent Based Modelling Approach

    by Daoud Kiomjian, F. Jordan Srour, Issam Srour

    Construction is a labor intensive industry. Many of the tasks on construction sites require minimal formal training, and thus workers develop their skill sets as they are working. Construction workers learn the required skills by interacting with other workers. The effectiveness of such interactions is expected to affect the development of workers’ skills and eventually the quality of their work. Understanding the relationship between team dynamics and quality on construction sites calls for using higher order modeling techniques such as agent based modelling (ABM). This paper presents an ABM that evaluates the effects of team dynamics on quality on construction sites. The outputs of this model are analyzed using social network analysis (SNA) for four different scenarios with varying crew sizes and worker skill levels.


  • Quality and Learning: A Case from the Construction Industry in the MENA Region

    by Daoud Kiomjian, F. Jordan Srour, Issam Srour

    Several studies recognize the existence of a relationship between learning and experience, on one hand, and productivity and quality of work, on the other hand. This paper examines, through the use of a case study, the relationship between productivity, quality, and learning within the unique labor pool of the Middle East and North Africa (MENA) region. The analysis of the case study confirms the existence of a positive correlation between task repetition (as a proxy for learning) and productivity. The data for the case study was obtained from productivity logs prepared by subcontractors and from material submittal and shop drawings approval logs prepared by the construction manager. The analysis of the case study did not show a positive relationship between learning and quality. This outcome is in opposition with the literature.


  • Learning Curves in Construction: A Critical Review and New Model

    by F. Jordan Srour, Daoud Kiomjian, Issam M. Srour

    This paper brings forth from the literature a series of learning curve models and evaluates them through the lens of the construction industry. The review suggests that there is still no consensus on which model provides the best fit and predictability for construction data. As such, this paper puts forth a new model that is suitable for the modern construction industry as it accommodates for both mechanization and forgetting. The proposed model is similar to the Wright model (an exponential model of learning), but, through recursion, places more emphasis on recent data. The proposed model shows an error of less than 1% when predicting the cumulative average completion times in three out of four cases examined.