Xiaolu Gan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Xiaolu Gan has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Kang Cheng
Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
2 shared publications - Panpan Guo
School of Civil Engineering, Hefei University of Technology, Hefei 230009, China
2 shared publications - Qiongfang Zhang
Department of Civil Engineering, PowerChina Huadong Engineering Co., Ltd, Zhejiang Hangzhou, 311122, People’s Republic of China
2 shared publications - Yadong Lou
Hangzhou Metro Group Co., Ltd., Zhejiang, Hangzhou 310003, China
2 shared publications - Cungang Lin
Ningbo University
1 shared publication - Jian-Lin Yu
Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
1 shared publication
Latest Publications
- Open Access
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Ground Displacements due to the Deformations of Shallow Tunnels with Arbitrary Cross Sections in Soft Ground
Nowadays, a huge number of shield‐driven tunnels with noncircular cross sections are constructed in urban areas all around the world. However, the ground displacements associated with tunneling still form a difficult issue, especially for noncircular tunnels. In this study, an analytical solution is derived to estimate the ground displacements induced by the deformations of shallow noncircular tunnels in soft ground. First, a solution for the stresses and displacements around a deep tunnel in a full plane is formulated by imposing a specified convergence pattern over the cavity boundary. Subsequently, this solution is validated using finite element simulations in a case study of an elliptical tunnel with four different convergence patterns. Afterward, the solution in the full plane is extended to a half plane using the virtual image technique to estimate the ground displacements around shallow tunnels. The solution is also validated using finite element simulations.
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Open AccessGround Displacements due to the Deformations of Shallow Tunnels with Arbitrary Cross Sections in Soft Ground
Nowadays, a huge number of shield‐driven tunnels with noncircular cross sections are constructed in urban areas all around the world. However, the ground displacements associated with tunneling still form a difficult issue, especially for noncircular tunnels. In this study, an analytical solution is derived to estimate the ground displacements induced by the deformations of shallow noncircular tunnels in soft ground. First, a solution for the stresses and displacements around a deep tunnel in a full plane is formulated by imposing a specified convergence pattern over the cavity boundary. Subsequently, this solution is validated using finite element simulations in a case study of an elliptical tunnel with four different convergence patterns. Afterward, the solution in the full plane is extended to a half plane using the virtual image technique to estimate the ground displacements around shallow tunnels. The solution is also validated using finite element simulations.
- Open Access
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Analytical Method to Interpret Displacement in Elastic Anisotropic Soil due to a Tunnel Cavity with an Arbitrary Cross Section
Based on complex variable theory and conformal mapping method, the paper presents full plane elastic solutions around an unlined tunnel with arbitrary cross section in anisotropic soil. The solutions describe soil elastic solutions for assuming that the displacement vectors along the tunnel boundary are directed towards the center of the tunnel. Tunnels with different cross sections are used to illustrate the method and its correctness. An elliptical unlined tunnel case is discussed in detail in the paper. Using the image method, an approximate solution for predicting surface displacement and subsurface horizontal displacement around an unlined tunnel in anisotropic soil can be obtained. The results show anisotropic stiffness properties n (n = Eh/Ev) and m (m = Gvh/Ev) have a great effect on the displacement distribution patterns around an elliptical tunnel with certain shape.
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Open AccessAnalytical Method to Interpret Displacement in Elastic Anisotropic Soil due to a Tunnel Cavity with an Arbitrary Cross Section
Based on complex variable theory and conformal mapping method, the paper presents full plane elastic solutions around an unlined tunnel with arbitrary cross section in anisotropic soil. The solutions describe soil elastic solutions for assuming that the displacement vectors along the tunnel boundary are directed towards the center of the tunnel. Tunnels with different cross sections are used to illustrate the method and its correctness. An elliptical unlined tunnel case is discussed in detail in the paper. Using the image method, an approximate solution for predicting surface displacement and subsurface horizontal displacement around an unlined tunnel in anisotropic soil can be obtained. The results show anisotropic stiffness properties n (n = Eh/Ev) and m (m = Gvh/Ev) have a great effect on the displacement distribution patterns around an elliptical tunnel with certain shape.
- Open Access
- 16 April 2020
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 8 (4) , 287
Experimental and Estimation Studies of Resilient Modulus of Marine Coral Sand under Cyclic Loading
Coral sand is an important filler resource that can solve the shortage of terrestrial fillers in coastal areas. Recently, the foundations of many infrastructures in the South China Sea have been built with coral sand as fillers, which have been subjected to wave and traffic cyclic loads. Resilient modulus (Mr) is an important design parameter in marine engineering, but there are few studies on the resilient modulus response of coral sand under cyclic loading. A series of drained cyclic triaxial tests were carried out to investigate the effects of the initial mean effective stress (p0) and cyclic stress ratio (ζ) on the resilient modulus response of the coral sand from the South China Sea. The change of fractal dimension (αc) can reflect the rule of particle breakage evolution. The αc of coral sand shows a tendency of almost maintaining stable and then increasing rapidly with the increase of mean effective stress p0 under each cyclic stress ratio ζ. There is a threshold of p0, when the p0 exceeds this threshold, αc will increase significantly with the increase of p0. The increase of p0 has a beneficial effect on the improvement of the Mr, while the increase of ζ has both beneficial and detrimental effects on the improvement of the Mr. A new prediction model of the Mr considering particle breakage was established, which can better predict the Mr of coral sand in the whole stress interval. The research results can provide guidance for the design of marine transportation infrastructures, which can promote the development of marine transportation industry and energy utilization.
- 16 April 2020
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 8 (4) , 287
Open AccessExperimental and Estimation Studies of Resilient Modulus of Marine Coral Sand under Cyclic Loading
Coral sand is an important filler resource that can solve the shortage of terrestrial fillers in coastal areas. Recently, the foundations of many infrastructures in the South China Sea have been built with coral sand as fillers, which have been subjected to wave and traffic cyclic loads. Resilient modulus (Mr) is an important design parameter in marine engineering, but there are few studies on the resilient modulus response of coral sand under cyclic loading. A series of drained cyclic triaxial tests were carried out to investigate the effects of the initial mean effective stress (p0) and cyclic stress ratio (ζ) on the resilient modulus response of the coral sand from the South China Sea. The change of fractal dimension (αc) can reflect the rule of particle breakage evolution. The αc of coral sand shows a tendency of almost maintaining stable and then increasing rapidly with the increase of mean effective stress p0 under each cyclic stress ratio ζ. There is a threshold of p0, when the p0 exceeds this threshold, αc will increase significantly with the increase of p0. The increase of p0 has a beneficial effect on the improvement of the Mr, while the increase of ζ has both beneficial and detrimental effects on the improvement of the Mr. A new prediction model of the Mr considering particle breakage was established, which can better predict the Mr of coral sand in the whole stress interval. The research results can provide guidance for the design of marine transportation infrastructures, which can promote the development of marine transportation industry and energy utilization.
- 1 February 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Performance of Constructed Facilities
- Vol. 34 (1)
Characteristics and Countermeasures of Tunnel Heave due to Large-Diameter Shield Tunneling Underneath
Structural deformation and damages may occur in existing tunnels because of new tunneling underneath. There is limited research on the interaction between overlying tunnels and large-diameter slurry shields in soft clay. This paper presents a case on the response of existing metro tunnels to large-diameter slurry shield underpassing in the muddy clay of Hangzhou, China. Through long-term displacement monitoring, displacement characteristics of existing tunnels during and after new tunnel construction were analyzed. Unusual tunnel heaves were observed after the passing of the shield tail because of the buoyancy effect. The existing tunnels heaved with the shape of an inverted , which was well-described with the Gaussian curve. The location of maximum tunnel heave was affected by the skew angle between the new and existing tunnels. Because the overburden pressure decreased in the under-crossing area, increased maximum ground heaves were observed. The adopted countermeasures for controlling tunnel heave were introduced and analyzed. By controlling the uplift of the new tunnels, excessive tunnel heave can be prevented. Increasing the clearance between the new and existing tunnels and optimizing the grouting parameters can diminish tunnel heave effectively. Long-term tunnel settlement caused by grout and soil consolidation developed considerably after shield underpassing. Decreased tunnel settlement and increased differential settlement could be observed during the second shield undercrossing. Detailed monitoring data and analysis provided useful experience for similar projects.- 1 February 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Performance of Constructed Facilities
- Vol. 34 (1)
Characteristics and Countermeasures of Tunnel Heave due to Large-Diameter Shield Tunneling Underneath
Structural deformation and damages may occur in existing tunnels because of new tunneling underneath. There is limited research on the interaction between overlying tunnels and large-diameter slurry shields in soft clay. This paper presents a case on the response of existing metro tunnels to large-diameter slurry shield underpassing in the muddy clay of Hangzhou, China. Through long-term displacement monitoring, displacement characteristics of existing tunnels during and after new tunnel construction were analyzed. Unusual tunnel heaves were observed after the passing of the shield tail because of the buoyancy effect. The existing tunnels heaved with the shape of an inverted , which was well-described with the Gaussian curve. The location of maximum tunnel heave was affected by the skew angle between the new and existing tunnels. Because the overburden pressure decreased in the under-crossing area, increased maximum ground heaves were observed. The adopted countermeasures for controlling tunnel heave were introduced and analyzed. By controlling the uplift of the new tunnels, excessive tunnel heave can be prevented. Increasing the clearance between the new and existing tunnels and optimizing the grouting parameters can diminish tunnel heave effectively. Long-term tunnel settlement caused by grout and soil consolidation developed considerably after shield underpassing. Decreased tunnel settlement and increased differential settlement could be observed during the second shield undercrossing. Detailed monitoring data and analysis provided useful experience for similar projects.