Huey Yuen Ng
Huey Yuen Ng has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Alvin Ming Hao Lim
Department of Chemical and Biomolecular Engineering, College of Design and Engineering, National University of Singapore, 10 Kent Ridge Crescent, Singapore 119260, Singapore
1 shared publication - Bu-Sung Lee
Nanyang technological university, Singapore, Singapore
1 shared publication - Daren Zong Loong Tan
Singapore Institute of Manufacturing Technology (ARTC)
1 shared publication Darrell Joshua Ong
Singapore Institute of Manufacturing Technology
1 shared publication- Hans C. Golong
Advanced Remanufacturing and Technology Centre (SIMTech)
1 shared publication Jane C. W. Wong
Singapore Institute of Manufacturing Technology (ARTC)
1 shared publication
Latest Publications
- 8 October 2026
- Published by Springer Nature
- p. 196-207
TIMES-Compatible Physics-Based Surrogate Industrial Modelling for the Refinery and Petrochemical Sector
- 8 October 2026
- Published by Springer Nature
- p. 196-207
TIMES-Compatible Physics-Based Surrogate Industrial Modelling for the Refinery and Petrochemical Sector
- 10 June 2022
- Published by Springer Nature
- p. 282-291
Reinforcement Learning Approach for Multi-period Inventory with Stochastic Demand
- 10 June 2022
- Published by Springer Nature
- p. 282-291
Reinforcement Learning Approach for Multi-period Inventory with Stochastic Demand
- 16 December 2021
- Published by Wiley in Journal of Computing and Information Science in Engineering
- Vol. 22 (3)
A Surrogate Model to Predict Production Performance in Digital Twin-Based Smart Manufacturing
With the dynamic arrival of production orders and unforeseen changes in shop-floor conditions within a production system, production scheduling presents a challenge for manufacturing firms to ensure production demands are met with high productivity and low operating cost. Before a production schedule is generated to process the incoming production orders, production planning is performed. Given the large number of input parameters involved in the production planning, it poses the challenge on how to systematically and accurately predict and evaluate production performance. Hence, it is important to understand the interactions of the input parameters between the production planning and the scheduling. This is to ensure that the production planning and the scheduling are coordinated and can be performed to achieve optimal production performance such as minimizing cost effectively and efficiently. Digital twin presents an opportunity to mirror the real-time production status and analyze the input parameters affecting the production performance in smart manufacturing. In this paper, we propose an approach to develop a surrogate model to predict the production performance using input parameters from a production plan using the capabilities of real-time synchronization of production data in digital twin. Multivariate adaptive regression spline (MARS) is applied to construct a surrogate model based on three categories of input parameters, i.e., current production system load, machine-based and product-based parameters. An industrial case study involving a wafer fabrication production is used to develop the surrogate model based on a random sampling of varying numbers of training data set. The proposed MARS model shows a high correlation coefficient and a large reduction in the number of input parameters for both linear and nonlinear cases with relation to three performances, namely flowtime, tardiness, and machine utilization.
- 16 December 2021
- Published by Wiley in Journal of Computing and Information Science in Engineering
- Vol. 22 (3)
A Surrogate Model to Predict Production Performance in Digital Twin-Based Smart Manufacturing
With the dynamic arrival of production orders and unforeseen changes in shop-floor conditions within a production system, production scheduling presents a challenge for manufacturing firms to ensure production demands are met with high productivity and low operating cost. Before a production schedule is generated to process the incoming production orders, production planning is performed. Given the large number of input parameters involved in the production planning, it poses the challenge on how to systematically and accurately predict and evaluate production performance. Hence, it is important to understand the interactions of the input parameters between the production planning and the scheduling. This is to ensure that the production planning and the scheduling are coordinated and can be performed to achieve optimal production performance such as minimizing cost effectively and efficiently. Digital twin presents an opportunity to mirror the real-time production status and analyze the input parameters affecting the production performance in smart manufacturing. In this paper, we propose an approach to develop a surrogate model to predict the production performance using input parameters from a production plan using the capabilities of real-time synchronization of production data in digital twin. Multivariate adaptive regression spline (MARS) is applied to construct a surrogate model based on three categories of input parameters, i.e., current production system load, machine-based and product-based parameters. An industrial case study involving a wafer fabrication production is used to develop the surrogate model based on a random sampling of varying numbers of training data set. The proposed MARS model shows a high correlation coefficient and a large reduction in the number of input parameters for both linear and nonlinear cases with relation to three performances, namely flowtime, tardiness, and machine utilization.
- Open Access
- 13 July 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (14) , 6454
Unified Genetic Algorithm Approach for Solving Flexible Job-Shop Scheduling Problem
This paper proposes a novel genetic algorithm (GA) approach that utilizes a multichromosome to solve the flexible job-shop scheduling problem (FJSP), which involves two kinds of decisions: machine selection and operation sequencing. Typically, the former is represented by a string of categorical values, whereas the latter forms a sequence of operations. Consequently, the chromosome of conventional GAs for solving FJSP consists of a categorical part and a sequential part. Since these two parts are different from each other, different kinds of genetic operators are required to solve the FJSP using conventional GAs. In contrast, this paper proposes a unified GA approach that enables the application of an identical crossover strategy in both the categorical and sequential parts. In order to implement the unified approach, the sequential part is evolved by applying a candidate order-based GA (COGA), which can use traditional crossover strategies such as one-point or two-point crossovers. Such crossover strategies can also be used to evolve the categorical part. Thus, we can handle the categorical and sequential parts in an identical manner if identical crossover points are used for both. In this study, the unified approach was used to extend the existing COGA to a unified COGA (u-COGA), which can be used to solve FJSPs. Numerical experiments reveal that the u-COGA is useful for solving FJSPs with complex structures.
- 13 July 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (14) , 6454
Open AccessUnified Genetic Algorithm Approach for Solving Flexible Job-Shop Scheduling Problem
This paper proposes a novel genetic algorithm (GA) approach that utilizes a multichromosome to solve the flexible job-shop scheduling problem (FJSP), which involves two kinds of decisions: machine selection and operation sequencing. Typically, the former is represented by a string of categorical values, whereas the latter forms a sequence of operations. Consequently, the chromosome of conventional GAs for solving FJSP consists of a categorical part and a sequential part. Since these two parts are different from each other, different kinds of genetic operators are required to solve the FJSP using conventional GAs. In contrast, this paper proposes a unified GA approach that enables the application of an identical crossover strategy in both the categorical and sequential parts. In order to implement the unified approach, the sequential part is evolved by applying a candidate order-based GA (COGA), which can use traditional crossover strategies such as one-point or two-point crossovers. Such crossover strategies can also be used to evolve the categorical part. Thus, we can handle the categorical and sequential parts in an identical manner if identical crossover points are used for both. In this study, the unified approach was used to extend the existing COGA to a unified COGA (u-COGA), which can be used to solve FJSPs. Numerical experiments reveal that the u-COGA is useful for solving FJSPs with complex structures.