MHMian Atif Hafeez

Mian Atif Hafeez

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Mian Atif Hafeez has a total of 18 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Stakeholder Engagement Use Cases for Research in Residential and Infrastructure Projects

    by Mian Atif Hafeez, Yasir Alani, Anderson Akponeware, Bjarnhéðinn Guðlaugsson, Huda Dawood, Sergio Rodriguez-Trejo, Nashwan Dawood

  • Drivers for energy analysis towards a BIM-enabled information flow

    by Ahmad Mohammad Ahmad, Sergio Rodriguez Trejo, Mian Atif Hafeez, Nashwan Dawood, Mohamad Kassem, Khalid Kamal Naji

    Purpose: Energy analysis (EA) within a building information modelling (BIM) enables consistent data integration in central repositories and eases information exchange, reducing rework. However, data loss during information exchange from different BIM uses or disciplines is frequent. Therefore, a holistic approach for different BIM uses enables a coherent life cycle information flow. The life cycle information flow drives the reduction of data loss and model rework and enhances the seamless reuse of information. The latter requires a specification of the EA key performance indicators (KPIs) and integrating those in the process.Design/methodology/approach: The paper presents a set of KPIs extracted from the developed EA process maps and interviews with expert stakeholders. These KPIs stem from the literature review and link to the benefits of EA through industry expert review. The study includes (1) development and validation of EA process maps adjusted to requirements from different stakeholders. (2) KPIs aligned with the EA process map, (3) identification of the drivers that can facilitate life cycle information exchange and (4) opportunities and obstacles for EA within BIM-enabled projects.Findings: This paper depicts a viable alternative for EA process maps and KPIs in a BIM-enabled AEC design industry. The findings of this paper showcase the need for an EA within BIM with these KPIs integrated for a more effective process conforming to the current Open BIM Alliance guidance and contributing towards sustainable life cycle information flow.Research limitations/implications: The limitation of the research is the challenge of generalising the developed EA process maps; however, it can be adjusted to fit defined organisational use. The findings deduced from the developed EA process map only show KPIs to have the ability to facilitate adequate information flow during EA.Practical implications: The AEC industry will benefit from the findings of this primary research as the industry will be able to contrast its process maps and KPIs to those developed in the paper.Social implications: This paper benefits the societal values in EA for the built environment in the design stages. The subsequent life cycle information flow will help achieve a consistent information set and decarbonised built environment.Originality/value: The paper offers a practical overview of process maps and KPIs to embed EA into BIM, reducing the information loss and rework needed in the practice of this integration. The applicability of the solution is contrasted by consultation with experts and literature.


  • Hierarchy based information requirements for sustainable operations of buildings in Qatar

    by Sergio Rodriguez-Trejo, Ahmad Mohammad Ahmad, Mian Atif Hafeez, Huda Dawood, Vladimir Vukovic, Mohamad Kassem, Khalid K. Naji, Nashwan Dawood


  • Open Access

    Investigating the Potential of Delivering Employer Information Requirements in BIM Enabled Construction Projects in Qatar

    by Mian Atif Hafeez, Racha Chahrour, Vladimir Vukovic, Nashwan Dawood, Mohamad Kassem


  • Open Access

    Principles and recommendations for client information requirements for BIM enabled construction projects in Qatar

    by Mohamad Kassem, Nashwan Dawood, Racha Chahrour, Vladimir Vukovic, Ahmad Mohammad Ahmad, Mian Atif Hafeez

    Employer's information requirements (EIR) is one of the key early documents in projects using building information modelling (BIM). EIR, introduced by the UK BIM Task Group, sets out information deliverables and the standards and processes to be adopted by the supply chain. It includes a set of requirements and guidelines in three areas namely technical, management and commercial. EIR, which are applicable to the construction industry in Qatar, are not clearly defined despite BIM is increasingly required on projects. This paper aims to develop a set of principles and recommendations for the three areas of the EIR which are applicable to Qatar's construction sector. Following an investigation of current BIM practices in Qatar, a set of general principles and recommendations were proposed and validated for the areas of the client information requirements (CIR) - an adaption of the term EIR as evidenced in the paper.

  • Open Access

    Principles and recommendations for client information requirements for BIM enabled construction projects in Qatar

    by Mian Atif Hafeez, Mohammad Ahmad, Racha Chahrour, Vladimir Vukovic, Nashwan Dawood, Mohamad Kassem

    Employer's information requirements (EIR) is one of the key early documents in projects using building information modelling (BIM). EIR, introduced by the UK BIM Task Group, sets out information deliverables and the standards and processes to be adopted by the supply chain. It includes a set of requirements and guidelines in three areas namely technical, management and commercial. EIR, which are applicable to the construction industry in Qatar, are not clearly defined despite BIM is increasingly required on projects. This paper aims to develop a set of principles and recommendations for the three areas of the EIR which are applicable to Qatar's construction sector. Following an investigation of current BIM practices in Qatar, a set of general principles and recommendations were proposed and validated for the areas of the client information requirements (CIR) - an adaption of the term EIR as evidenced in the paper.


  • Identifying Current BIM Practices in Qatar and Proposing a Framework for Whole Life Cycle BIM Processes

    by Mian Atif Hafeez, Vladimir Vukovic, Racha Chahrour, Mohamad Kassem, Nashwan Dawood

    The research is part of a wider project aimed to develop a whole lifecycle information flow approach enabled by BIM protocols and technologies for Qatari construction industry. We consider the lifecycle information flow as enabler of a consistent and continuous use of building information from design, through construction, to the facility management stage. Building Information Modeling (BIM) is increasingly used by the Architecture, Engineering, Construction and Operation (AECO) professionals around the world. BIM has proven and potential benefits to facilitate Whole Life Cycle (WLC) information flow described above. It is generally accepted fact that AECO industry is fragmented in nature. Using BIM for WLC information flow is seen as one of the potential solutions to contribute towards a more cohesive AECO industry.Within the global construction sector, Qatar's construction market is one of the fastest growing in the world throughout the next decade in alignment with the Qatar National Vision 2030. Currently ongoing and planned construction projects exceed US$220 billion (Kilani, 2014), e.g. Lusail City projects, new Doha Port, new Hamad International Airport, Qatar Rail project, Qatar National Museum project as well as construction of stadiums and related infrastructure projects ahead of the Qatar 2022 FIFA World Cup.This paper aims to identify current BIM related practices, existing procedures, technology and standards being used in Qatar using qualitative data collection and analysis technique and then proposes a framework for BIM processes across whole life cycle of the project to facilitate whole life cycle information flow. 28 semi-structured interviews were conducted with different stakeholders (clients, contractors, consultants) involved mainly in design and construction project lifecycle stages in Qatar. Results of the conducted interview analyses are presented in relation to policy, people, process and technology (3P + T) pillars that have been proposed for use in Qatar.The following key findings were reported by majority of the interviewees (values in brackets indicate the agreement percentage): (Vukovic, Hafeez, Chahrour, Kassem, & Dawood, 2015) Usage of FIDIC contract template (67%) and BS 1192:2007 BIM standards (60%) is prevalent on projects in Qatar. However, specific BIM information/standards should be developed at a government level for the Qatari construction industry (86%), including standard project stages with clear process maps (82%). Also in comparison to the situation in other countries, based on the examined literature, Qatari government should do more to drive the construction industry transformation by undertaking BIM related initiatives. BIM competency is usually a criteria for prequalification and selection during the procurement process (71%). Organizations in Qatar mostly use in-house BIM trained staff (75%). BIM roles are specifically defined in the contract (86%), BIM standards are required by contracts (68%), and should be enforced by contracts (75%). There is no need to create more BIM specific roles/positions (64%), but there is a need to upgrade the skills of people on BIM specific positions (89%). There is also a need to educate other project participants how to collaborate using BIM (96%). Such identified needs are similar to the situation in other countries covered by the literature review. LOD 300 is mostly required in design/construction stages of ongoing projects in Qatar (64%), which is the owners' responsibility (71%). The owner usually also initiates design changes (68%). In alignment with the above findings this paper proposes a framework (Fig. 1) consisting of ‘Project DNA’, BIM Processes and Whole Life Cycle of the projects and their inter relationship. Future work will elaborate on the BIM processes and protocols and validate the proposed framework using case studies.