Yaw Adubofour Tuffour
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Yaw Adubofour Tuffour has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Emmanuel Kofi Adanu
Alabama Transportation Institute, University of Alabama, Tuscaloosa, AL 35487, USA
2 shared publications - Kenneth Adomako Tutu
Department of Civil Engineering, Kwame Nkrumah University of Science and Technology, Kumasi, GHANA
2 shared publications Abena Agyeiwaa Obiri-Yeboah
Department of Civil Engineering, Kumasi Polytechnic, Kumasi, Ghana
1 shared publication- Charles Anum Adams
Kwame Nkrumah University of Science and Technology
1 shared publication - Charlse Anum Adams
Regional Transport Research and Education Centre Kumasi, College of Engineering, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana
1 shared publication - Daniel Atuah Obeng
Kwame Nkrumah University of Science and Technology
1 shared publication
Latest Publications
- Open Access
- 11 November 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (22) , 15846
Evaluation of Selected Empirical Models for Asphalt Pavement Temperature Prediction in a Tropical Climate: The Case of Ghana
Asphalt pavement temperature has several applications, including pavement structural design and evaluation, asphalt mixture design, asphalt binder grade determination and material aging characterization. However, available asphalt pavement temperature prediction models were mostly developed for temperate climatic conditions. Before such models are adopted for use in a tropical climate to facilitate advanced pavement engineering, their applicability must be verified. This study evaluated five empirical asphalt pavement temperature prediction models: the Lukanen (BELLS 3), Park, Diefenderfer, and Taamneh models, all developed in the United States, and the Asefzadeh model, formulated in Canada, to ascertain their prediction accuracy in a tropical climate, using the West African country Ghana as a case study. The results of such a model evaluation study will justify the adoption of existing models for local application or the development of new ones suitable for tropical climates. In this study, in situ asphalt pavement temperature data were measured at two sites for eight months: Kumasi and Tamale in the Forest and Savannah climatic zones, respectively. The measured pavement temperature data were compared with predicted pavement temperatures using the two independent-samples t-test, the coefficient of determination, the line of equality, and three error statistics (mean bias error, mean percentage error and root mean square error). It was found that the Park model provided a more accurate pavement temperature prediction in both climatic zones. The other models either over-predicted or under-predicted asphalt pavement temperature with significant error margins. However, there is a need to improve the prediction accuracy of the Park model as considerable over-prediction occurred at a temperature of at least 47 °C or a local model developed.
- 11 November 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (22) , 15846
Open AccessEvaluation of Selected Empirical Models for Asphalt Pavement Temperature Prediction in a Tropical Climate: The Case of Ghana
Asphalt pavement temperature has several applications, including pavement structural design and evaluation, asphalt mixture design, asphalt binder grade determination and material aging characterization. However, available asphalt pavement temperature prediction models were mostly developed for temperate climatic conditions. Before such models are adopted for use in a tropical climate to facilitate advanced pavement engineering, their applicability must be verified. This study evaluated five empirical asphalt pavement temperature prediction models: the Lukanen (BELLS 3), Park, Diefenderfer, and Taamneh models, all developed in the United States, and the Asefzadeh model, formulated in Canada, to ascertain their prediction accuracy in a tropical climate, using the West African country Ghana as a case study. The results of such a model evaluation study will justify the adoption of existing models for local application or the development of new ones suitable for tropical climates. In this study, in situ asphalt pavement temperature data were measured at two sites for eight months: Kumasi and Tamale in the Forest and Savannah climatic zones, respectively. The measured pavement temperature data were compared with predicted pavement temperatures using the two independent-samples t-test, the coefficient of determination, the line of equality, and three error statistics (mean bias error, mean percentage error and root mean square error). It was found that the Park model provided a more accurate pavement temperature prediction in both climatic zones. The other models either over-predicted or under-predicted asphalt pavement temperature with significant error margins. However, there is a need to improve the prediction accuracy of the Park model as considerable over-prediction occurred at a temperature of at least 47 °C or a local model developed.
- Open Access
- 28 July 2023
- Published by MDPI AG in Preprints.org
Evaluation of Selected Empirical Models for Asphalt Pavement Temperature Prediction in Tropical Climate: The Case of Ghana
Asphalt pavement temperature has several applications, including pavement structural design and evaluation, asphalt mixture design, asphalt binder grade determination and material aging characterization. However, available asphalt pavement temperature prediction models were mostly developed for temperate climatic conditions, outside of the tropics. Before such models are adopted for use in a tropical climate, their applicability must be evaluated. This study evaluated five empirical asphalt pavement temperature prediction models developed by Lukanen et al. [1], Park et al. [2], Diefenderfer et al. [3], Taamneh [4] all in the United States and Asefzadeh et al. [5] in Canada to ascertain their prediction accuracy in tropical climate, using Ghana as a case study. In-situ asphalt pavement temperature data were measured at two sites for eight months: Kumasi and Tamale in the Forest and Savannah climatic zones, respectively. The measured pavement temperature data were statistically compared with predicted temperatures, and it was found that the Park et al. [2] model provided a more accurate pavement temperature prediction in both climatic zones. The other models either over-predicted or under-predicted asphalt pavement temperature with significant error margins. However, there is a need to improve the prediction accuracy of the Park et al. [2] model or a local model developed.
- 28 July 2023
- Published by MDPI AG in Preprints.org
Open AccessEvaluation of Selected Empirical Models for Asphalt Pavement Temperature Prediction in Tropical Climate: The Case of Ghana
Asphalt pavement temperature has several applications, including pavement structural design and evaluation, asphalt mixture design, asphalt binder grade determination and material aging characterization. However, available asphalt pavement temperature prediction models were mostly developed for temperate climatic conditions, outside of the tropics. Before such models are adopted for use in a tropical climate, their applicability must be evaluated. This study evaluated five empirical asphalt pavement temperature prediction models developed by Lukanen et al. [1], Park et al. [2], Diefenderfer et al. [3], Taamneh [4] all in the United States and Asefzadeh et al. [5] in Canada to ascertain their prediction accuracy in tropical climate, using Ghana as a case study. In-situ asphalt pavement temperature data were measured at two sites for eight months: Kumasi and Tamale in the Forest and Savannah climatic zones, respectively. The measured pavement temperature data were statistically compared with predicted temperatures, and it was found that the Park et al. [2] model provided a more accurate pavement temperature prediction in both climatic zones. The other models either over-predicted or under-predicted asphalt pavement temperature with significant error margins. However, there is a need to improve the prediction accuracy of the Park et al. [2] model or a local model developed.
- Open Access
- 3 February 2017
- Published by Science Publishing Group in American Journal of Civil Engineering
- Vol. 5 (2) , 119-123
Area-Type Adjustment Factors for Non-CBD Signalised Intersections
In the estimation of saturation flow at signalized intersections using the HCM model, the influence of area-type characteristics on flow is accounted for by the area-type adjustment factor ( f a ). The recommendation by the manual to use f a =0.9 for CBD-intersections and 1.0 for all others tacitly assumes that the nature of non-CBD areas does not influence flow. This may not hold for many developing country cities and metropolitan areas where the roadside environments associated with non-CBD intersections may be laden with a flurry of activities that impact traffic flow. For signalized intersections in such areas, the HCM-recommended area-type adjustment factor could lead to over-estimation of saturation flow rates if the activities create substantial roadside friction to flow. This study set out to develop area-type adjustment factors for non-CBD signalized intersections located within the Kumasi Metropolis in Ghana, to accurately reflect the impact of roadside character on saturation flow rates. Using field saturation flow data collected at selected signalized intersections in the metropolis, area-type adjustment factors were developed for three distinct roadside friction environments categorised in the study as low/none, medium, and high. Average f a values developed were 0.99 for low/none, 0.98 for medium, and 0.94 for high roadside friction environments. Also, a multiple linear regression model that attempts to relate f a to pedestrian traffic interfering with flow within the environment of the intersection was developed as an alternative procedure for determining site specific area-type adjustment factor. It is recommended to use the f a values developed in this study in the HCM saturation flow model in order to estimate more accurately the saturation flow rates at non-CBD signalized intersections within the Kumasi Metropolis.
- 3 February 2017
- Published by Science Publishing Group in American Journal of Civil Engineering
- Vol. 5 (2) , 119-123
Open AccessArea-Type Adjustment Factors for Non-CBD Signalised Intersections
In the estimation of saturation flow at signalized intersections using the HCM model, the influence of area-type characteristics on flow is accounted for by the area-type adjustment factor ( f a ). The recommendation by the manual to use f a =0.9 for CBD-intersections and 1.0 for all others tacitly assumes that the nature of non-CBD areas does not influence flow. This may not hold for many developing country cities and metropolitan areas where the roadside environments associated with non-CBD intersections may be laden with a flurry of activities that impact traffic flow. For signalized intersections in such areas, the HCM-recommended area-type adjustment factor could lead to over-estimation of saturation flow rates if the activities create substantial roadside friction to flow. This study set out to develop area-type adjustment factors for non-CBD signalized intersections located within the Kumasi Metropolis in Ghana, to accurately reflect the impact of roadside character on saturation flow rates. Using field saturation flow data collected at selected signalized intersections in the metropolis, area-type adjustment factors were developed for three distinct roadside friction environments categorised in the study as low/none, medium, and high. Average f a values developed were 0.99 for low/none, 0.98 for medium, and 0.94 for high roadside friction environments. Also, a multiple linear regression model that attempts to relate f a to pedestrian traffic interfering with flow within the environment of the intersection was developed as an alternative procedure for determining site specific area-type adjustment factor. It is recommended to use the f a values developed in this study in the HCM saturation flow model in order to estimate more accurately the saturation flow rates at non-CBD signalized intersections within the Kumasi Metropolis.
- Open Access
- 21 April 2016
- Published by Science Publishing Group in American Journal of Civil Engineering
- Vol. 4 (3) , 84-91
Premature Failure of Apedwa-Bunsu Junction Section of N6 in Ghana: Some Notes for Consideration
This study investigated premature and continual failure of the Apedwa-Bunsu Junction section of Route N6 in Ghana despite an earlier maintenance intervention which included geotextile installation and placement of a new wearing course. It involved a condition survey, density, asphalt content, gradation, stiffness modulus and Falling Weight Deflectometer (FWD) tests on the section. The condition survey revealed cracking (alligator, transverse and longitudinal), ravelling, potholes, rutting and shoving as the predominant defects on the road. The density tests on the bituminous layers revealed relative compaction levels which, in most cases, did not meet the minimum required by the technical specifications despite the additional densification by traffic. The poor compaction was corroborated by high pavement deflections from the FWD device. Asphalt cores revealed a friable dense bituminous macadam (DBM) layer although bitumen extraction tests indicated all design asphalt contents were met. Lack of inter-particle cohesion within the DBM layer was suggestive of stripping damage to the asphalt concrete. Some samples of the crushed rock base contained plastic fines and fines content that exceeded specification limits. High stiffness modulus values of the bituminous layers suggested possible premature aging of the asphalt binder which probably accelerated crack development. An earlier intervention in the form of placement of geotextile in the wearing course failed to arrest cracking because the material had been placed at a shallow depth rendering it ineffective. It was concluded that inadequate compaction of the bituminous layers and the use of crushed rock and other pavement materials that did not wholly meet the technical specifications were the root causes of the premature failure of the section.
- 21 April 2016
- Published by Science Publishing Group in American Journal of Civil Engineering
- Vol. 4 (3) , 84-91
Open AccessPremature Failure of Apedwa-Bunsu Junction Section of N6 in Ghana: Some Notes for Consideration
This study investigated premature and continual failure of the Apedwa-Bunsu Junction section of Route N6 in Ghana despite an earlier maintenance intervention which included geotextile installation and placement of a new wearing course. It involved a condition survey, density, asphalt content, gradation, stiffness modulus and Falling Weight Deflectometer (FWD) tests on the section. The condition survey revealed cracking (alligator, transverse and longitudinal), ravelling, potholes, rutting and shoving as the predominant defects on the road. The density tests on the bituminous layers revealed relative compaction levels which, in most cases, did not meet the minimum required by the technical specifications despite the additional densification by traffic. The poor compaction was corroborated by high pavement deflections from the FWD device. Asphalt cores revealed a friable dense bituminous macadam (DBM) layer although bitumen extraction tests indicated all design asphalt contents were met. Lack of inter-particle cohesion within the DBM layer was suggestive of stripping damage to the asphalt concrete. Some samples of the crushed rock base contained plastic fines and fines content that exceeded specification limits. High stiffness modulus values of the bituminous layers suggested possible premature aging of the asphalt binder which probably accelerated crack development. An earlier intervention in the form of placement of geotextile in the wearing course failed to arrest cracking because the material had been placed at a shallow depth rendering it ineffective. It was concluded that inadequate compaction of the bituminous layers and the use of crushed rock and other pavement materials that did not wholly meet the technical specifications were the root causes of the premature failure of the section.