Jorge Lopes
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jorge Lopes has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
- Maria Isabel Abreu
Instituto Politécnico de Bragança
5 shared publications - Rui A. F. Oliveira
GICos—Research Group in Sustainable Construction, Instituto Politécnico de Bragança, 5300-253 Bragança, Portugal
5 shared publications - Nerija Banaitienė
Department of Construction Management and Real Estate, Vilnius Gediminas Technical University, 10223 Vilnius, Lithuania
2 shared publications Admir Tavares
Department of Civil Engineering, University of Minho, Guimarães, Portugal
1 shared publication- Ana Maria Antão-Geraldes
CIMO, LA SusTEC, Instituto Politécnico de Bragança, Campus de Santa Apolónia, 5300-253 Bragança, Portugal
1 shared publication - Antonio Albuquerque
GeoBioTec, Department of Civil Engineering and Architecture, University of Beira Interior, 6201-001 Covilhã, Portugal
1 shared publication
Latest Publications
- Open Access
Selection and Weight Determination of Factors for Price Adjustment Formulae Based on Bill of Quantities
This study investigates the effectiveness of standard price adjustment formulae for construction contracts in Portugal. Price adjustment is a mechanism that aims to adjust contractual values to market price fluctuations in labor, materials, and equipment. Such formulae are often generalized and applied in contractual practices without being properly tailored to the specific characteristics of each project. To fill this gap, this study, informed by convergent proposals, builds on the argument that the use of different bill of quantities (BOQs)-based price adjustment formulae for the same contract is fairer, more equitable, and with greater capacity to cushion sudden variations in prices. Using a case study, consisting of a public construction contract, the study analyses price differences obtained through the application of the standard formula and compares them, over different periods, with those obtained through the use of two alternative calculation formulae specifically developed according to the project’s characteristics. The performance of all scenarios was evaluated against the evolution of the growth rate of the construction cost index (CCI). The results demonstrate that the standard formula, even when it is readjusted, provides disproportionate results. In contrast, the BOQ-based price adjustment formulae, developed according to different phases of the works, provide results that are very close to those obtained by CCI-based escalation. The behavior of these customized formulae, even during periods of high price indices increases, closely tracks that of inflation. The results of the study call for the enactment of a more comprehensive legal mechanism so that all cost elements of a construction project can be properly reflected in price adjustment methodologies.
Open AccessSelection and Weight Determination of Factors for Price Adjustment Formulae Based on Bill of Quantities
This study investigates the effectiveness of standard price adjustment formulae for construction contracts in Portugal. Price adjustment is a mechanism that aims to adjust contractual values to market price fluctuations in labor, materials, and equipment. Such formulae are often generalized and applied in contractual practices without being properly tailored to the specific characteristics of each project. To fill this gap, this study, informed by convergent proposals, builds on the argument that the use of different bill of quantities (BOQs)-based price adjustment formulae for the same contract is fairer, more equitable, and with greater capacity to cushion sudden variations in prices. Using a case study, consisting of a public construction contract, the study analyses price differences obtained through the application of the standard formula and compares them, over different periods, with those obtained through the use of two alternative calculation formulae specifically developed according to the project’s characteristics. The performance of all scenarios was evaluated against the evolution of the growth rate of the construction cost index (CCI). The results demonstrate that the standard formula, even when it is readjusted, provides disproportionate results. In contrast, the BOQ-based price adjustment formulae, developed according to different phases of the works, provide results that are very close to those obtained by CCI-based escalation. The behavior of these customized formulae, even during periods of high price indices increases, closely tracks that of inflation. The results of the study call for the enactment of a more comprehensive legal mechanism so that all cost elements of a construction project can be properly reflected in price adjustment methodologies.
- Open Access
- 17 May 2024
- Published by Vilnius Gediminas Technical University in Technological and Economic Development of Economy
- Vol. 30 (5) , 1229-1255
A MODEL FOR CONSTRUCTION SECTOR DEVELOPMENT IN MIDDLE-INCOME SUB-SAHARAN AFRICAN COUNTRIES
Buildings and other constructed facilities form the essential framework of a country’s physical and economic infrastructure. Construction serves as a key capital input to production, driving economic growth and wealth generation. This impact can be particularly transformative in low-to-middle-income countries. Physical infrastructure, including construction, is a powerful engine of economic growth and is closely related to national economic performance. However, not all studies agree with the commonly held belief that construction investment has a positive impact on economic growth, particularly concerning the amount of investment and the relationship between construction investment and economic growth. So far, cross-country studies dealing with the construction sector-economic growth relationship have used indicators of national output and construction that are not strictly comparable between countries. This article reviews the main strands of the literature on the role that the construction sector plays in the national economy and economic development. It also uses novel data drawn from the “capital file” of the PENN World Table (version 10.1) to assess the development pattern of the construction sector in two groups of sub-Saharan African (SSA) countries on the middle-income status of economic development, for the period between 1990 and 2019. The study reveals that construction shares, measured as the proportion of gross fixed capital formation attributable to construction in the gross domestic product, revolve around a norm determined by the level of built assets preceding the reference period. The results of the study could have policy implications for the economic sustainability of the construction industry in SSA.
- 17 May 2024
- Published by Vilnius Gediminas Technical University in Technological and Economic Development of Economy
- Vol. 30 (5) , 1229-1255
Open AccessA MODEL FOR CONSTRUCTION SECTOR DEVELOPMENT IN MIDDLE-INCOME SUB-SAHARAN AFRICAN COUNTRIES
Buildings and other constructed facilities form the essential framework of a country’s physical and economic infrastructure. Construction serves as a key capital input to production, driving economic growth and wealth generation. This impact can be particularly transformative in low-to-middle-income countries. Physical infrastructure, including construction, is a powerful engine of economic growth and is closely related to national economic performance. However, not all studies agree with the commonly held belief that construction investment has a positive impact on economic growth, particularly concerning the amount of investment and the relationship between construction investment and economic growth. So far, cross-country studies dealing with the construction sector-economic growth relationship have used indicators of national output and construction that are not strictly comparable between countries. This article reviews the main strands of the literature on the role that the construction sector plays in the national economy and economic development. It also uses novel data drawn from the “capital file” of the PENN World Table (version 10.1) to assess the development pattern of the construction sector in two groups of sub-Saharan African (SSA) countries on the middle-income status of economic development, for the period between 1990 and 2019. The study reveals that construction shares, measured as the proportion of gross fixed capital formation attributable to construction in the gross domestic product, revolve around a norm determined by the level of built assets preceding the reference period. The results of the study could have policy implications for the economic sustainability of the construction industry in SSA.
- Open Access
- 15 April 2024
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 30 (4) , 295-306
ESTIMATES OF CONSTRUCTION INFRASTRUCTURE STOCK FOR CAPE VERDE: 1980–2019
Building and other construction assets constitute a significant part of a country’s physical and economic infrastructure. According to several writers, the knowledge of reliable data of building and other construction assets of a specific country or region is a crucial element for the long-term management of these assets. Built capital stock statistics at the national or international levels have been available for most countries of the world, both developed and less developed ones, for some time, but construction infrastructure stock statistics at the disaggregated level are very scarce, even for most developed countries. Furthermore, the methodologies to produce the estimates of built capital stock, at the international level, do not consider countries’ specificities. This paper discusses the methodologic issues for producing construction infrastructure stock statistics for Cape Verde, and makes estimates for the period 1980–2019. The paper outlines the Perpetual Inventory Method (PIM) used to produce capital estimation, data employed, and the assumptions made to estimate missing data. The paper analyses the level of the construction infrastructure stock estimates for Cape Verde, as well as their impact on the development pattern of the country’s construction industry, and suggests how further studies can enhance our comprehension of the relationship between construction investment and economic growth and development.
- 15 April 2024
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 30 (4) , 295-306
Open AccessESTIMATES OF CONSTRUCTION INFRASTRUCTURE STOCK FOR CAPE VERDE: 1980–2019
Building and other construction assets constitute a significant part of a country’s physical and economic infrastructure. According to several writers, the knowledge of reliable data of building and other construction assets of a specific country or region is a crucial element for the long-term management of these assets. Built capital stock statistics at the national or international levels have been available for most countries of the world, both developed and less developed ones, for some time, but construction infrastructure stock statistics at the disaggregated level are very scarce, even for most developed countries. Furthermore, the methodologies to produce the estimates of built capital stock, at the international level, do not consider countries’ specificities. This paper discusses the methodologic issues for producing construction infrastructure stock statistics for Cape Verde, and makes estimates for the period 1980–2019. The paper outlines the Perpetual Inventory Method (PIM) used to produce capital estimation, data employed, and the assumptions made to estimate missing data. The paper analyses the level of the construction infrastructure stock estimates for Cape Verde, as well as their impact on the development pattern of the country’s construction industry, and suggests how further studies can enhance our comprehension of the relationship between construction investment and economic growth and development.
- Open Access
- 31 December 2023
- Published by University of Minho in Engenharia Civil UM
- p. 14-27
Atualizações de Revisão de Preços comparadas com custos reais de mercado(s) dos materiais: Estudo de Caso
O controlo de custos de empreitadas exige metodologias de gestão cada vez mais ajustadas às especificidades das respetivas obras. Os consideráveis aumentos de custos de materiais, causados pela atual conjuntura de mercado global, exigem tomadas de decisão ajustadas à realidade. A revisão de preços aplicável às empreitadas de construção tem em consideração a atualização de preços com base nos índices atualizados de materiais, mão-de-obra e de equipamentos, onde, por vezes, não compensam a efetiva subida desses preços. A recente legislação (Decreto-Lei 36/2022) que alterou o regime jurídico de revisão de preços contempla a possibilidade de os cocontratantes interessados apresentarem correção ou alteração da fórmula de revisão de preços, quando a apresentada esteja desajustada às especificidades da empreitada ou quando a mesma esteja omissa no caderno de encargos. O artigo envolve a simulação de um caso real de uma obra onde foi aplicada revisão de preços, fazendo-se a comparação entre a compensação retribuída ao empreiteiro atendendo ao preço de determinados materiais na data considerada base de cálculo, e a resultante da efetiva subida de preços desses materiais, sob a forma de diferentes cenários de revisão com base na recente legislação. Este estudo demonstra que, mantendo as fórmulas que servem de base ao cálculo da revisão de preços, o empreiteiro pode ter retribuições que podem ser suficientes para compensar as eventuais subidas de preços de mercado. Em oposição, a utilização de determinados ajustamentos da fórmula-tipo de revisão de preços pode revelar retribuições superiores aos custos reais de mercado dos materiais.
- 31 December 2023
- Published by University of Minho in Engenharia Civil UM
- p. 14-27
Open AccessAtualizações de Revisão de Preços comparadas com custos reais de mercado(s) dos materiais: Estudo de Caso
O controlo de custos de empreitadas exige metodologias de gestão cada vez mais ajustadas às especificidades das respetivas obras. Os consideráveis aumentos de custos de materiais, causados pela atual conjuntura de mercado global, exigem tomadas de decisão ajustadas à realidade. A revisão de preços aplicável às empreitadas de construção tem em consideração a atualização de preços com base nos índices atualizados de materiais, mão-de-obra e de equipamentos, onde, por vezes, não compensam a efetiva subida desses preços. A recente legislação (Decreto-Lei 36/2022) que alterou o regime jurídico de revisão de preços contempla a possibilidade de os cocontratantes interessados apresentarem correção ou alteração da fórmula de revisão de preços, quando a apresentada esteja desajustada às especificidades da empreitada ou quando a mesma esteja omissa no caderno de encargos. O artigo envolve a simulação de um caso real de uma obra onde foi aplicada revisão de preços, fazendo-se a comparação entre a compensação retribuída ao empreiteiro atendendo ao preço de determinados materiais na data considerada base de cálculo, e a resultante da efetiva subida de preços desses materiais, sob a forma de diferentes cenários de revisão com base na recente legislação. Este estudo demonstra que, mantendo as fórmulas que servem de base ao cálculo da revisão de preços, o empreiteiro pode ter retribuições que podem ser suficientes para compensar as eventuais subidas de preços de mercado. Em oposição, a utilização de determinados ajustamentos da fórmula-tipo de revisão de preços pode revelar retribuições superiores aos custos reais de mercado dos materiais.
- Open Access
- 16 August 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (16) , 12430
Technical and Financial Feasibility Analysis of Rainwater Harvesting Using Conventional or Green Roofs in an Industrial Building
Given the high annual water consumption for non-potable uses (1112.08 m3, 65%) of an industrial building with a large roof area (4638 m2) located in the Northeast of Portugal, this study aims to evaluate the technical and financial feasibility of a rainwater harvesting system for these uses, considering the existing conventional roof (scenario 1) and adapting a green roof to the existing roof (scenario 2). This evaluation was based on the impact of the two scenarios on the building’s water savings. Under scenarios 1 and 2, the expected water savings were 64.47% and 59.43%, respectively. Therefore, the expected reduction in the annual water bill was €3867.07 + VAT (scenario 1) and €3564.63 + VAT (scenario 2). For scenario 1, considering a reservoir with 70 m3 for non-potable purposes, such as washing the building’s floor and use in industrial machines, and an initial investment of €41,109.13 + VAT, the single payback will be 11.29 years. The single payback for scenario 2 largely exceeded the lifetime of the green roof. However, as they are considered interesting solutions to reduce the negative externalities of industrial settlements, financial incentives could be proposed for the implementation of the green roof in this typology of buildings.
- 16 August 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (16) , 12430
Open AccessTechnical and Financial Feasibility Analysis of Rainwater Harvesting Using Conventional or Green Roofs in an Industrial Building
Given the high annual water consumption for non-potable uses (1112.08 m3, 65%) of an industrial building with a large roof area (4638 m2) located in the Northeast of Portugal, this study aims to evaluate the technical and financial feasibility of a rainwater harvesting system for these uses, considering the existing conventional roof (scenario 1) and adapting a green roof to the existing roof (scenario 2). This evaluation was based on the impact of the two scenarios on the building’s water savings. Under scenarios 1 and 2, the expected water savings were 64.47% and 59.43%, respectively. Therefore, the expected reduction in the annual water bill was €3867.07 + VAT (scenario 1) and €3564.63 + VAT (scenario 2). For scenario 1, considering a reservoir with 70 m3 for non-potable purposes, such as washing the building’s floor and use in industrial machines, and an initial investment of €41,109.13 + VAT, the single payback will be 11.29 years. The single payback for scenario 2 largely exceeded the lifetime of the green roof. However, as they are considered interesting solutions to reduce the negative externalities of industrial settlements, financial incentives could be proposed for the implementation of the green roof in this typology of buildings.
- Open Access
Sustainability Perspective to Support Decision Making in Structural Retrofitting of Buildings: A Case Study
The reuse of existing materials in buildings can give a contribution to sustainable practices such as a balance in embodied energy, water, and emission reduction. However, it is not always possible to maintain the existing structural materials because some different technical variables could hamper their usability, namely seismic reinforcement needs, fire safety protection, conservation state, and new legal requirements. The paper follows a case study approach for assessing the technical and environmental performances of structural options for old building retrofitting works. All structural options were analyzed through the results of several categories of environmental impact. Some parameters of a retrofitting management system were also used to frame in a comprehensive way the technical constraints pertaining to building retrofitting works. The structural option choice was taken by the owner with the contribution of the design team and the construction manager of the construction project as well as the results of interviews with other construction professionals, considering the variables related to technical suitability and environmental impact. The results of the study show that the steel structure is the solution that best addresses the technical constraints of the building retrofit works and minimizes environmental impact. The results of the study also suggest that the consideration of other variables other than the technical ones can contribute to the effective functioning of the renovation subsegment of the building market. Some suggestions for further studies to enhance the results of this work are put forward.
Open AccessSustainability Perspective to Support Decision Making in Structural Retrofitting of Buildings: A Case Study
The reuse of existing materials in buildings can give a contribution to sustainable practices such as a balance in embodied energy, water, and emission reduction. However, it is not always possible to maintain the existing structural materials because some different technical variables could hamper their usability, namely seismic reinforcement needs, fire safety protection, conservation state, and new legal requirements. The paper follows a case study approach for assessing the technical and environmental performances of structural options for old building retrofitting works. All structural options were analyzed through the results of several categories of environmental impact. Some parameters of a retrofitting management system were also used to frame in a comprehensive way the technical constraints pertaining to building retrofitting works. The structural option choice was taken by the owner with the contribution of the design team and the construction manager of the construction project as well as the results of interviews with other construction professionals, considering the variables related to technical suitability and environmental impact. The results of the study show that the steel structure is the solution that best addresses the technical constraints of the building retrofit works and minimizes environmental impact. The results of the study also suggest that the consideration of other variables other than the technical ones can contribute to the effective functioning of the renovation subsegment of the building market. Some suggestions for further studies to enhance the results of this work are put forward.
- Open Access
A Staged Approach for Energy Retrofitting an Old Service Building: A Cost-Optimal Assessment
Office buildings built before the pre-1960 age constitute a relevant group for analyzing the energy performance of the Portuguese building sector. A dynamic energy simulation was used to assess the energy performance of an existing office building located in the town of Bragança, Portugal. By using a staged renovation approach, two passive technologies applied to the building envelope and an efficient domestic hot water system were selected and a financial evaluation through the net saving (NS) method was undertaken to choose the best efficiency measures/packages for improving the building’s energy performance. Real discount rates of 3% and 1% were used in the financial evaluation. Considering the real discount rate of 3%, the results showed that only two out seven retrofit options had a positive financial return. By using the real discount rate of 1%, all retrofit options were found to be financially efficient. The results of the study corroborated those of earlier works that found that the financial profitability of energy renovation investments is very sensitive to the discount rate used in the analysis. The results of the study also suggested that the staged renovation approach used in the analysis is economically feasible, and that this approach is an alternative to one-step renovation approach to help to achieve the country´s energy and climate targets by 2030. Suggestions for future research conducted for office buildings in the different climate zones and other age groups in Portugal are proposed.
Open AccessA Staged Approach for Energy Retrofitting an Old Service Building: A Cost-Optimal Assessment
Office buildings built before the pre-1960 age constitute a relevant group for analyzing the energy performance of the Portuguese building sector. A dynamic energy simulation was used to assess the energy performance of an existing office building located in the town of Bragança, Portugal. By using a staged renovation approach, two passive technologies applied to the building envelope and an efficient domestic hot water system were selected and a financial evaluation through the net saving (NS) method was undertaken to choose the best efficiency measures/packages for improving the building’s energy performance. Real discount rates of 3% and 1% were used in the financial evaluation. Considering the real discount rate of 3%, the results showed that only two out seven retrofit options had a positive financial return. By using the real discount rate of 1%, all retrofit options were found to be financially efficient. The results of the study corroborated those of earlier works that found that the financial profitability of energy renovation investments is very sensitive to the discount rate used in the analysis. The results of the study also suggested that the staged renovation approach used in the analysis is economically feasible, and that this approach is an alternative to one-step renovation approach to help to achieve the country´s energy and climate targets by 2030. Suggestions for future research conducted for office buildings in the different climate zones and other age groups in Portugal are proposed.
- Open Access
- 30 June 2021
- Published by Vilnius Gediminas Technical University in International Journal of Strategic Property Management
- Vol. 25 (5) , 369-381
EVALUATION OF COST-OPTIMAL RETROFIT INVESTMENT IN BUILDINGS: THE CASE OF BRAGANÇA FIRE STATION, PORTUGAL
Office buildings built before the entry into force of the first thermal regulation in 1991 constitute a relevant group for analysing the energy performance of the Portuguese building sector. A dynamic energy simulation was used to assess the energy performance of an existing office building located in the town of Bragança, Portugal. Four energy efficiency measures were selected and a financial evaluation through the internal rate of return (IRR) method was undertaken to choose the best retrofit option for improving the building’s energy performance. An investment package consisting of the roof insulation and a new equipment for the domestic hot water system presented an IRR higher than the discount rate used in the analysis, and, thus, a positive financial return. The results of the study also suggest that the EU’s comparative methodology framework is not particularly suitable for assessing building retrofit investment at the private investor’s perspective and further refinement in the cost-effective approach to renovations is needed to help stimulate building’s energy renovation market. Suggestions for further studies conducted for office buildings in the different climate zones in Portugal are also proposed.
- 30 June 2021
- Published by Vilnius Gediminas Technical University in International Journal of Strategic Property Management
- Vol. 25 (5) , 369-381
Open AccessEVALUATION OF COST-OPTIMAL RETROFIT INVESTMENT IN BUILDINGS: THE CASE OF BRAGANÇA FIRE STATION, PORTUGAL
Office buildings built before the entry into force of the first thermal regulation in 1991 constitute a relevant group for analysing the energy performance of the Portuguese building sector. A dynamic energy simulation was used to assess the energy performance of an existing office building located in the town of Bragança, Portugal. Four energy efficiency measures were selected and a financial evaluation through the internal rate of return (IRR) method was undertaken to choose the best retrofit option for improving the building’s energy performance. An investment package consisting of the roof insulation and a new equipment for the domestic hot water system presented an IRR higher than the discount rate used in the analysis, and, thus, a positive financial return. The results of the study also suggest that the EU’s comparative methodology framework is not particularly suitable for assessing building retrofit investment at the private investor’s perspective and further refinement in the cost-effective approach to renovations is needed to help stimulate building’s energy renovation market. Suggestions for further studies conducted for office buildings in the different climate zones in Portugal are also proposed.
- Open Access
- 12 December 2018
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 26 (5) , 814-826
Estimating the built environment stock in Cape Verde
The purpose of this paper is to present the estimates of the value of the built environment stock in Cape Verde, a Sub-Saharan African country that is scattered through ten relatively small islands. It applies the perpetual inventory method in a long series of construction investment data at 1980 and 2007 constant prices published by the Cape Verde’s National Statistics Office. The results show that the capital-output ratio is similar to those in the advanced industrial countries. The high value of this indicator suggests that the country should shift its focus from building new investment projects to managing the considerable amount of built stock. The main originality of the paper comes from the use of different data sets from the National Statistical Office to construct the indicators of the construction industry activity in a comprehensive way.
- 12 December 2018
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 26 (5) , 814-826
Open AccessEstimating the built environment stock in Cape Verde
The purpose of this paper is to present the estimates of the value of the built environment stock in Cape Verde, a Sub-Saharan African country that is scattered through ten relatively small islands. It applies the perpetual inventory method in a long series of construction investment data at 1980 and 2007 constant prices published by the Cape Verde’s National Statistics Office. The results show that the capital-output ratio is similar to those in the advanced industrial countries. The high value of this indicator suggests that the country should shift its focus from building new investment projects to managing the considerable amount of built stock. The main originality of the paper comes from the use of different data sets from the National Statistical Office to construct the indicators of the construction industry activity in a comprehensive way.