Fernando López-Irarragorri
Research Subjects
Research Interests
Fernando López-Irarragorri has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Av. Pedro de Alba Universidad Autónoma de Nuevo León1 shared publication
- Paulina A. Avila-Torres
Department of Business Administration, Universidad de las Américas Puebla/Ex-Hacienda Santa Catarina Mártir, San Andres Cholula, Puebla 72810, Mexico
1 shared publication - Rafael Caballero
Universidad de Málaga
1 shared publication - Yasmin Agueda Rios-Solis
Tecnológico de Monterrey
1 shared publication
Latest Publications
- Open Access
- 1 January 2018
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 14 (2) , 447-472
The multimodal and multiperiod urban transportation integrated timetable construction problem with demand uncertainty
The urban transport planning process has four main activities: Network design, Timetable construction, Vehicle scheduling and Crew scheduling; each activity has subactivities. In this paper the authors work with the subactivities of timetable construction: minimal frequency calculation and departure time scheduling. The authors propose to solve both subactivities in an integrated way. The developed mathematical model allows multi-period planning and it can also be used for multimodal urban transportation systems. The authors consider demand uncertainty and the authors employ fuzzy programming to solve the problem. The authors formulate the urban transportation timetabling construction problem as a bi-objective problem: to minimize the total operational cost and to maximize the number of multi-period synchronizations. Finally, the authors implemented the SAUGMECON method to solve the problem.
- 1 January 2018
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 14 (2) , 447-472
Open AccessThe multimodal and multiperiod urban transportation integrated timetable construction problem with demand uncertainty
The urban transport planning process has four main activities: Network design, Timetable construction, Vehicle scheduling and Crew scheduling; each activity has subactivities. In this paper the authors work with the subactivities of timetable construction: minimal frequency calculation and departure time scheduling. The authors propose to solve both subactivities in an integrated way. The developed mathematical model allows multi-period planning and it can also be used for multimodal urban transportation systems. The authors consider demand uncertainty and the authors employ fuzzy programming to solve the problem. The authors formulate the urban transportation timetabling construction problem as a bi-objective problem: to minimize the total operational cost and to maximize the number of multi-period synchronizations. Finally, the authors implemented the SAUGMECON method to solve the problem.