Abu Safayet
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Abu Safayet has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
- Habibur Rahman Sobuz
Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna 9203, Bangladesh
2 shared publications - Abdullah Al Mamun
Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna, Bangladesh
1 shared publication - Abu Abrar Abdullah
Department of Building Engineering and Construction Management, Khulna University of Engineering & Technology, Khulna—9203, Bangladesh
1 shared publication - Abu Yousuf Bhuiyan
Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna, Bangladesh
1 shared publication Alamry Ali
1 shared publicationFaseehul Islam
Department of Building Engineering and Construction Management, Khulna University of Engineering & Technology, Khulna—9203, Bangladesh
1 shared publication
Latest Publications
- Open Access
- 1 February 2025
- Published by IOP Publishing in Materials Research Express
- Vol. 12 (2) , 025003
Combined influence of eggshell powder and nylon fiber on self-compacting concrete production: experimental assessment and machine learning quantifications
The focus of this paper is on the study of the impact of nylon fibers (NF) as a reinforcing agent and eggshell powder (ESP) as an SCM in the production of self-compacting concrete (SCC) for sustainable buildings design. For this reason, the experiment involves finding the optimum amounts of ESP replacement for cement, which ranges between 5% to 15%, and the quantity of nylon fibers added in percent, which is between 0.05% and 0.10%. This study dealt with using ESP and nylon fibers for fresh, mechanical, durability, and microstructure of concrete. Additionally, random forest (RF) and artificial neural network (ANN) based machine learning methods were planned in order to examine the fresh and mechanical response of concrete. The study discovered that concrete containing 0.1 percent nylon fibers and 5 percent ESP performed relatively better compared to the control sample, especially in hardened characteristics. After 28 days, the compressive and splitting tensile strengths increased by 6% and 4%, respectively, compared to the control mixture. Although the UPV test revealed excellent quality in all mixtures, increased ESP levels decreased concrete strength. The maximum R2 value (0.989) and the minimum RMSE value (1.393) for the RF model indicate a strong overall estimation. The study emphasizes the potential of enhancing the overall performance of SCC by utilizing eggshell powder and nylon fibers. These results present a more sustainable approach to concrete production and contribute to a reduced environmental footprint.
- 1 February 2025
- Published by IOP Publishing in Materials Research Express
- Vol. 12 (2) , 025003
Open AccessCombined influence of eggshell powder and nylon fiber on self-compacting concrete production: experimental assessment and machine learning quantifications
The focus of this paper is on the study of the impact of nylon fibers (NF) as a reinforcing agent and eggshell powder (ESP) as an SCM in the production of self-compacting concrete (SCC) for sustainable buildings design. For this reason, the experiment involves finding the optimum amounts of ESP replacement for cement, which ranges between 5% to 15%, and the quantity of nylon fibers added in percent, which is between 0.05% and 0.10%. This study dealt with using ESP and nylon fibers for fresh, mechanical, durability, and microstructure of concrete. Additionally, random forest (RF) and artificial neural network (ANN) based machine learning methods were planned in order to examine the fresh and mechanical response of concrete. The study discovered that concrete containing 0.1 percent nylon fibers and 5 percent ESP performed relatively better compared to the control sample, especially in hardened characteristics. After 28 days, the compressive and splitting tensile strengths increased by 6% and 4%, respectively, compared to the control mixture. Although the UPV test revealed excellent quality in all mixtures, increased ESP levels decreased concrete strength. The maximum R2 value (0.989) and the minimum RMSE value (1.393) for the RF model indicate a strong overall estimation. The study emphasizes the potential of enhancing the overall performance of SCC by utilizing eggshell powder and nylon fibers. These results present a more sustainable approach to concrete production and contribute to a reduced environmental footprint.
- Top Cited Papers
- 9 January 2025
- Published by Elsevier in Construction and Building Materials
- Vol. 461
Combined influence of modified recycled concrete aggregate and metakaolin on high-strength concrete production: Experimental assessment and machine learning quantifications with advanced SHAP and PDP analyses
- 9 January 2025
- Published by Elsevier in Construction and Building Materials
- Vol. 461
Top Cited PapersCombined influence of modified recycled concrete aggregate and metakaolin on high-strength concrete production: Experimental assessment and machine learning quantifications with advanced SHAP and PDP analyses
- 17 May 2022
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 42 (4) , 576-595
Building performance analysis for optimizing the energy consumption of an educational building
Purpose: In response to rising energy prices and growing environmental concerns, there is a growing demand for environmentally friendly building facilities. This study investigates optimizing energy consumption and improves the level of accuracy when selecting suitable materials and components with minimal impact on the overall energy consumption of buildings.Design/methodology/approach: This study was carried out from the perspective of an educational building's energy simulation, using a validated building energy analysis tool Green Building Studio (GBS). There were eight parameters analyzed considering at least two connected variables without measuring the initial building configuration. After that, Autodesk Revit and Insight 360 were used to make similar scenarios of the best performance selections so that the general results could be compared and the initial hypothesis could be proven.Findings: In this study, the initial building analysis showed that there was an annual energy use of 139 kBtu/sf and the estimated carbon emissions were about 156 tons/yr. After the parametric analysis, the maximum energy saving was about 32.38%, considering the best performance scenario with a reduction of CO2 emissions of around 28.85%.Originality/value: The outcome of this study will help Bangladeshi architect/designers to make appropriate decisions regarding the selection of suitable building materials and components at the initial stage of any project in terms of the energy consumption aspects. In addition, energy-efficient buildings provide cleaner combustion and better circulation than traditional buildings, that is why they reduce indoor air pollution, maintaining a safe, healthy and sustainable environment for future generations.
- 17 May 2022
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 42 (4) , 576-595
Building performance analysis for optimizing the energy consumption of an educational building
Purpose: In response to rising energy prices and growing environmental concerns, there is a growing demand for environmentally friendly building facilities. This study investigates optimizing energy consumption and improves the level of accuracy when selecting suitable materials and components with minimal impact on the overall energy consumption of buildings.Design/methodology/approach: This study was carried out from the perspective of an educational building's energy simulation, using a validated building energy analysis tool Green Building Studio (GBS). There were eight parameters analyzed considering at least two connected variables without measuring the initial building configuration. After that, Autodesk Revit and Insight 360 were used to make similar scenarios of the best performance selections so that the general results could be compared and the initial hypothesis could be proven.Findings: In this study, the initial building analysis showed that there was an annual energy use of 139 kBtu/sf and the estimated carbon emissions were about 156 tons/yr. After the parametric analysis, the maximum energy saving was about 32.38%, considering the best performance scenario with a reduction of CO2 emissions of around 28.85%.Originality/value: The outcome of this study will help Bangladeshi architect/designers to make appropriate decisions regarding the selection of suitable building materials and components at the initial stage of any project in terms of the energy consumption aspects. In addition, energy-efficient buildings provide cleaner combustion and better circulation than traditional buildings, that is why they reduce indoor air pollution, maintaining a safe, healthy and sustainable environment for future generations.
- 26 July 2021
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 41 (2) , 401-421
Analysis of construction delay for delivering quality project in Bangladesh
Purpose: Construction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.Design/methodology/approach: An extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index.Findings: Among the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors.Originality/value: The outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.
- 26 July 2021
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 41 (2) , 401-421
Analysis of construction delay for delivering quality project in Bangladesh
Purpose: Construction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.Design/methodology/approach: An extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index.Findings: Among the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors.Originality/value: The outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.