Xueyu Zheng
Research Subjects
Xueyu Zheng has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Luchen Zhang
The National Key Laboratory of Water Disaster Prevention, Nanjing Hydraulic Research Institute, Nanjing 210029, China
4 shared publications - Shiqiang Wu
Nanjing Hydraulic Research Institute, Nanjing 210029, China
3 shared publications - Jiaxiu Yang
Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China
2 shared publications - Bin Lu
The National Key Laboratory of Water Disaster Prevention, Nanjing Hydraulic Research Institute, Nanjing 210029, China
1 shared publication - Chuang Liu
The National Key Laboratory of Water Disaster Prevention, Nanjing Hydraulic Research Institute, Nanjing 210029, China
1 shared publication - Fuming Wang
National Local Joint Engineering Laboratory of Major Infrastructure Testing and Rehabilitation Technology, Zhengzhou 450001, China
1 shared publication
Latest Publications
- Open Access
Study on Threshold Values of Safety Control Indicators for Rapid Drawdown of 200~300 m High Earth-Rockfill Dams
High dams and large reservoirs serve flood control, power generation, water supply and ecological security, where rapid safe drawdown is vital for emergency handling and long-term safe operation. Targeting undefined rapid drawdown control standards for over-200 m ultra-high earth-rockfill dams, this study selects 200 m, 250 m and 300 m earth core rockfill dams for finite element calculations of transient unsaturated seepage and slope stability under varying drawdown rates. It analyzes how drawdown rate, drawdown depth and dam height affect dam safety, and tests the sensitivity of rockfill shear strength indices. Results reveal rapid drawdown produces prominent phreatic line lag, which worsens with faster drawdown and taller dams. Slope safety factors fall then rise during water level decline with a critical minimum, and taller dams respond more sensitively to drawdown rate. The allowable drawdown limits are 10 m/d, 8 m/d and 6 m/d for 200 m, 250 m and 300 m dams, paired with maximum safe drawdown depths of 108 m, 140.4 m and 154.8 m. Rockfill cohesion c is highly sensitive at 0–40 kPa; each 2° rise in internal friction angle φ lifts the safety factor by roughly 7.3%. The findings offer theoretical and technical references for drawdown facility design and emergency regulation of reservoirs with dams exceeding 200 m.
Open AccessStudy on Threshold Values of Safety Control Indicators for Rapid Drawdown of 200~300 m High Earth-Rockfill Dams
High dams and large reservoirs serve flood control, power generation, water supply and ecological security, where rapid safe drawdown is vital for emergency handling and long-term safe operation. Targeting undefined rapid drawdown control standards for over-200 m ultra-high earth-rockfill dams, this study selects 200 m, 250 m and 300 m earth core rockfill dams for finite element calculations of transient unsaturated seepage and slope stability under varying drawdown rates. It analyzes how drawdown rate, drawdown depth and dam height affect dam safety, and tests the sensitivity of rockfill shear strength indices. Results reveal rapid drawdown produces prominent phreatic line lag, which worsens with faster drawdown and taller dams. Slope safety factors fall then rise during water level decline with a critical minimum, and taller dams respond more sensitively to drawdown rate. The allowable drawdown limits are 10 m/d, 8 m/d and 6 m/d for 200 m, 250 m and 300 m dams, paired with maximum safe drawdown depths of 108 m, 140.4 m and 154.8 m. Rockfill cohesion c is highly sensitive at 0–40 kPa; each 2° rise in internal friction angle φ lifts the safety factor by roughly 7.3%. The findings offer theoretical and technical references for drawdown facility design and emergency regulation of reservoirs with dams exceeding 200 m.
- Open Access
Technical Challenges of Safety Emergency Drawdown for High Dam and Large Reservoir Project
With the development of a 300 m high dam and large reservoir construction, the emergency drawdown capacity of cascade reservoirs, especially high dams, has become a hot issue of concern to all sectors of society while giving play to huge comprehensive benefits. Based on a thorough investigation of the current situation of drawdown facilities for high dams and large reservoirs with a height of 200 m or more in the world, this paper finds that drawdown facilities currently face difficulties such as insufficient drawdown capacity, poor safety and stability of high head structures, extremely high lift hoisting equipment, and high difficulty in high head water seal technology. It is pointed out that the key technologies that need to be urgently addressed for a deep drawdown of high dams and large reservoirs are the pressure-bearing capacity of gates and the capacity limit of hoists. As a result, the elevation of the bottom tunnel of the drawdown building cannot be arranged and the orifice is limited, and the drawdown depth and discharge capacity are limited.
Open AccessTechnical Challenges of Safety Emergency Drawdown for High Dam and Large Reservoir Project
With the development of a 300 m high dam and large reservoir construction, the emergency drawdown capacity of cascade reservoirs, especially high dams, has become a hot issue of concern to all sectors of society while giving play to huge comprehensive benefits. Based on a thorough investigation of the current situation of drawdown facilities for high dams and large reservoirs with a height of 200 m or more in the world, this paper finds that drawdown facilities currently face difficulties such as insufficient drawdown capacity, poor safety and stability of high head structures, extremely high lift hoisting equipment, and high difficulty in high head water seal technology. It is pointed out that the key technologies that need to be urgently addressed for a deep drawdown of high dams and large reservoirs are the pressure-bearing capacity of gates and the capacity limit of hoists. As a result, the elevation of the bottom tunnel of the drawdown building cannot be arranged and the orifice is limited, and the drawdown depth and discharge capacity are limited.
- Open Access
Research on Flood Discharge and Energy Dissipation of a Tunnel Group Layout for a Super-High Rockfill Dam in a High-Altitude Region
Under the condition of a large dip angle between the flood discharging structure axis and the downstream cushion pool centerline, the downstream flow connection for the discharging tunnel group is poor, and the lower air pressure in high-altitude areas increases its influence on the trajectory distance of the nappe, further increasing the difficulty of predicting the flood discharge and energy dissipation layout. Based on the RM hydropower project with the world’s highest earth-rockfill dam, this paper studies the problem of a large included angle flip energy dissipation layout of a tunnel group flood discharge using the method of the overall hydraulic physical model test. The test results show that the conventional flip outlet mode has a long nappe falling point, a serious shortage of effective energy dissipation space, a large dynamic hydraulic pressure impact peak value on the bottom slab and side wall of the plunge pool, a poor flow connection between the outlet of the plunge pool and the downstream river channel, and a low energy dissipation rate. Considering the influence of a low-pressure environment, when the “transverse diffusion and downward incidence” outflow is adopted, the nappe falling point shrinks by 11 m, the energy dissipation form of the plunge pool is greatly improved, the effective energy dissipation space is increased by 159%, the RMS of the maximum fluctuating pressure is reduced by 74%, the outflow is smoothly connected with the downstream river, the energy dissipation rate is increased by 0.8%, and the protection range of flood discharge atomization is significantly reduced. This effectively solves the safety problems of large included angle discharge return channels and the energy dissipation and erosion prevention of super-high rockfill dams.
Open AccessResearch on Flood Discharge and Energy Dissipation of a Tunnel Group Layout for a Super-High Rockfill Dam in a High-Altitude Region
Under the condition of a large dip angle between the flood discharging structure axis and the downstream cushion pool centerline, the downstream flow connection for the discharging tunnel group is poor, and the lower air pressure in high-altitude areas increases its influence on the trajectory distance of the nappe, further increasing the difficulty of predicting the flood discharge and energy dissipation layout. Based on the RM hydropower project with the world’s highest earth-rockfill dam, this paper studies the problem of a large included angle flip energy dissipation layout of a tunnel group flood discharge using the method of the overall hydraulic physical model test. The test results show that the conventional flip outlet mode has a long nappe falling point, a serious shortage of effective energy dissipation space, a large dynamic hydraulic pressure impact peak value on the bottom slab and side wall of the plunge pool, a poor flow connection between the outlet of the plunge pool and the downstream river channel, and a low energy dissipation rate. Considering the influence of a low-pressure environment, when the “transverse diffusion and downward incidence” outflow is adopted, the nappe falling point shrinks by 11 m, the energy dissipation form of the plunge pool is greatly improved, the effective energy dissipation space is increased by 159%, the RMS of the maximum fluctuating pressure is reduced by 74%, the outflow is smoothly connected with the downstream river, the energy dissipation rate is increased by 0.8%, and the protection range of flood discharge atomization is significantly reduced. This effectively solves the safety problems of large included angle discharge return channels and the energy dissipation and erosion prevention of super-high rockfill dams.
- Open Access
Study on the Shape of the Aerator of High-Head Discharge Tunnel with Mild Bottom Slope
Due to the high flow velocity and easy cavitation of high-head drainage tunnels, it is usually necessary to set up aeration facilities. In particular, when the bottom slope of the tunnel is mild, the aeration facilities often have problems such as difficulty with air intake, short cavity, and serious water accumulation, which aggravate the risk of cavitation damage. In this paper, based on the Rumei hydropower station and the Gushui hydropower station, a method combining theoretical analysis and model testing is used to solve the connection problem between the aeration facility and the 3% mild bottom slope of a tunnel body, and the aeration facility shape of “lifting ridge + flat (mild) slope + steep slope” is put forward. The research shows that the steep slope section can smoothly connect the water flow over the cantilever, reduce the jet impact angle, prevent the water from backtracking, and produce a long and stable cavity in the flat (mild) slope section. The aeration concentration along the bottom of the tunnel is higher than 3% at 140 m over the top of the dam. The aeration effect of this type is better, and it can provide effective long-distance protection for a drainage tunnel with high head and a mild bottom slope.
Open AccessStudy on the Shape of the Aerator of High-Head Discharge Tunnel with Mild Bottom Slope
Due to the high flow velocity and easy cavitation of high-head drainage tunnels, it is usually necessary to set up aeration facilities. In particular, when the bottom slope of the tunnel is mild, the aeration facilities often have problems such as difficulty with air intake, short cavity, and serious water accumulation, which aggravate the risk of cavitation damage. In this paper, based on the Rumei hydropower station and the Gushui hydropower station, a method combining theoretical analysis and model testing is used to solve the connection problem between the aeration facility and the 3% mild bottom slope of a tunnel body, and the aeration facility shape of “lifting ridge + flat (mild) slope + steep slope” is put forward. The research shows that the steep slope section can smoothly connect the water flow over the cantilever, reduce the jet impact angle, prevent the water from backtracking, and produce a long and stable cavity in the flat (mild) slope section. The aeration concentration along the bottom of the tunnel is higher than 3% at 140 m over the top of the dam. The aeration effect of this type is better, and it can provide effective long-distance protection for a drainage tunnel with high head and a mild bottom slope.