Bitang Zhu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Bitang Zhu has a total of 27 co-authors. Here are the top co-authors by number of shared publications:
- Changjie Xu
School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang, China
2 shared publications Daxin Geng
Key Laboratory of Geotechnical Engineering Infrastructure and Safety Control East China Jiaotong University Nanchang 330013 China ecjtu.jx.cn
2 shared publications- Yalong Jiang
School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang, China
2 shared publications - Anhui Wang
China Construction Industrial & Energy Engineering Group Co., Ltd., Nanjing 210023, China
1 shared publication Bingrui Chen
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
1 shared publication- Bingrui Chen
State Key Laboratory of Intelligent Deep Metal Mining and Equipment, Northeastern University, Shenyang 110819, China
1 shared publication
Latest Publications
- 22 November 2024
- Published by Springer Nature in Bulletin of Engineering Geology and the Environment
- Vol. 83 (12) , 1-18
A strength prediction model of soil-rock mixture with varying rock proportions
- 22 November 2024
- Published by Springer Nature in Bulletin of Engineering Geology and the Environment
- Vol. 83 (12) , 1-18
A strength prediction model of soil-rock mixture with varying rock proportions
- Open Access
- 24 January 2024
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 12 (2) , 208
Simplified Design Method of Laterally Loaded Rigid Monopiles in Cohesionless Soil
This paper presents a simplified design method for laterally loaded rigid monopiles in cohesionless soil. The proposed design method is based on a constant depth of the rotation point and a bi-linear distribution of soil lateral reaction along the embedded length of the monopile. Furthermore, a mobilization coefficient of soil resistance is introduced to quantify the magnitude of the soil reaction mobilized under a certain load level applied at the pile head. The mobilization coefficient is found to be directly related to the pile head rotation by back-analyzing test results measured from 13 laterally loaded piles in the published literature. The feasibility and reliability of the proposed design method are evaluated with another 23 laterally loaded piles, which are compiled in a database. The results show that the proposed design method yields relatively satisfactory predictions of the nonlinear load-deformation responses of these piles. Furthermore, comparison of soil lateral reaction profiles between those measured and calculated with the proposed method proves the validity of the assumed soil reaction profiles. As the mobilization coefficient is back-analyzed from piles mostly embedded in uniform ground and the pile bending and translational deformations are neglected in this study, the proposed method is suitable for monopile designs in uniform sites with medium~medium-dense sand, in which the pile bending and translational deformations can be ignored.
- 24 January 2024
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 12 (2) , 208
Open AccessSimplified Design Method of Laterally Loaded Rigid Monopiles in Cohesionless Soil
This paper presents a simplified design method for laterally loaded rigid monopiles in cohesionless soil. The proposed design method is based on a constant depth of the rotation point and a bi-linear distribution of soil lateral reaction along the embedded length of the monopile. Furthermore, a mobilization coefficient of soil resistance is introduced to quantify the magnitude of the soil reaction mobilized under a certain load level applied at the pile head. The mobilization coefficient is found to be directly related to the pile head rotation by back-analyzing test results measured from 13 laterally loaded piles in the published literature. The feasibility and reliability of the proposed design method are evaluated with another 23 laterally loaded piles, which are compiled in a database. The results show that the proposed design method yields relatively satisfactory predictions of the nonlinear load-deformation responses of these piles. Furthermore, comparison of soil lateral reaction profiles between those measured and calculated with the proposed method proves the validity of the assumed soil reaction profiles. As the mobilization coefficient is back-analyzed from piles mostly embedded in uniform ground and the pile bending and translational deformations are neglected in this study, the proposed method is suitable for monopile designs in uniform sites with medium~medium-dense sand, in which the pile bending and translational deformations can be ignored.
- Open Access
- 22 June 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (13) , 7421
Evaluation of Longitudinal Equivalent Bending Stiffness of Shield Tunnel with Residual Jacking Force
Existing tunnels are often subject to longitudinal bending when undercrossing tunnelling. It is of significance to more accurately evaluate the longitudinal equivalent bending stiffness (LEBS) of the existing tunnel within the influential zone. A new analytical method is proposed for the LEBS of tunnel segmental lining joints with consideration of incorporating combined action of residual jacking force and bending moment. The solution can degenerate into a special case with no residual jacking force, which agrees well with other classical solutions and validates the model and solutions. Sensitivity analyses are carried out for the bending moment, tunnel geometry, tensile stiffness of bolts and concrete grade on the LEBS, and effective ratio of the LEBS considering residual jacking force. The LEBS and the effective ratio of LEBS increase nonlinearly as an S-curve with the residual jacking force and decrease with an increasing bending moment. The results show that the LEBS of the shield tunnel is variable stiffness, which exhibits a significant nonlinearity. The maximum increment of the LEBS reaches 80.3% as the ring width increases from 1 m to 2 m, and the LEBS of the shield tunnel increases by approximately 1.3 × 107 kN·m2 for every 4-bolt added. The influential order on the LEBS of shield tunnels is the tunnel diameter > lining thickness > bolts diameter > ring width > the number of bolts > elastic modulus of bolts. When the effective ratio of LEBS is more than 0.85, it does not change with the ring width, lining thickness, tensile stiffness of bolts, and concrete grade. The response characteristics of the tunnel parameters on the LEBS, considering the residual jacking force, could provide a theoretical basis for the design and deformation control of shield tunnels when undercrossing tunnelling.
- 22 June 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (13) , 7421
Open AccessEvaluation of Longitudinal Equivalent Bending Stiffness of Shield Tunnel with Residual Jacking Force
Existing tunnels are often subject to longitudinal bending when undercrossing tunnelling. It is of significance to more accurately evaluate the longitudinal equivalent bending stiffness (LEBS) of the existing tunnel within the influential zone. A new analytical method is proposed for the LEBS of tunnel segmental lining joints with consideration of incorporating combined action of residual jacking force and bending moment. The solution can degenerate into a special case with no residual jacking force, which agrees well with other classical solutions and validates the model and solutions. Sensitivity analyses are carried out for the bending moment, tunnel geometry, tensile stiffness of bolts and concrete grade on the LEBS, and effective ratio of the LEBS considering residual jacking force. The LEBS and the effective ratio of LEBS increase nonlinearly as an S-curve with the residual jacking force and decrease with an increasing bending moment. The results show that the LEBS of the shield tunnel is variable stiffness, which exhibits a significant nonlinearity. The maximum increment of the LEBS reaches 80.3% as the ring width increases from 1 m to 2 m, and the LEBS of the shield tunnel increases by approximately 1.3 × 107 kN·m2 for every 4-bolt added. The influential order on the LEBS of shield tunnels is the tunnel diameter > lining thickness > bolts diameter > ring width > the number of bolts > elastic modulus of bolts. When the effective ratio of LEBS is more than 0.85, it does not change with the ring width, lining thickness, tensile stiffness of bolts, and concrete grade. The response characteristics of the tunnel parameters on the LEBS, considering the residual jacking force, could provide a theoretical basis for the design and deformation control of shield tunnels when undercrossing tunnelling.
- Open Access
Assessment of Earth Retaining Performance for Long-Short Piles Composite Structures from Field Experiments and Numerical Analysis
Retaining pile structure is commonly utilized in excavation maintenance design. In recent years, the long-short combined retaining piles have received more and more attention. According to the actual deep excavation engineering, the working mechanism of the long-short, long-double-short, and long-triple-short combined retaining piles was tested in the field. Based on the field test parameters, the finite element model of the test area was established and the simulation results were verified, and the effects of short pile length and pile spacing on bending moment, horizontal displacement of piles, surface settlement, and excavation bottom heave were further investigated. The results show that the bending moment of the long pile is larger than the short pile. The bending moment of the long pile and short pile increases gradually with the increase in the number of short piles. When the combination changes from combination 1 to 3, the peak moment of the long pile and short pile increases by 15.8% and 15.2%, respectively. The maximum displacement is near the pile top, combination 3 has the largest horizontal displacement, and the peak displacement of the long pile and the short pile is 17.21 mm and 17.87 mm, respectively, but almost no effect exists on the horizontal displacement below the excavation bottom. In addition, reducing short pile length and increasing pile spacing will increase bending moment and horizontal displacement of the long and short piles to a certain extent, and this phenomenon is mainly concentrated above the excavation bottom, the influence of short pile length and pile spacing on surface settlement and excavation bottom heave can be ignored.
Open AccessAssessment of Earth Retaining Performance for Long-Short Piles Composite Structures from Field Experiments and Numerical Analysis
Retaining pile structure is commonly utilized in excavation maintenance design. In recent years, the long-short combined retaining piles have received more and more attention. According to the actual deep excavation engineering, the working mechanism of the long-short, long-double-short, and long-triple-short combined retaining piles was tested in the field. Based on the field test parameters, the finite element model of the test area was established and the simulation results were verified, and the effects of short pile length and pile spacing on bending moment, horizontal displacement of piles, surface settlement, and excavation bottom heave were further investigated. The results show that the bending moment of the long pile is larger than the short pile. The bending moment of the long pile and short pile increases gradually with the increase in the number of short piles. When the combination changes from combination 1 to 3, the peak moment of the long pile and short pile increases by 15.8% and 15.2%, respectively. The maximum displacement is near the pile top, combination 3 has the largest horizontal displacement, and the peak displacement of the long pile and the short pile is 17.21 mm and 17.87 mm, respectively, but almost no effect exists on the horizontal displacement below the excavation bottom. In addition, reducing short pile length and increasing pile spacing will increase bending moment and horizontal displacement of the long and short piles to a certain extent, and this phenomenon is mainly concentrated above the excavation bottom, the influence of short pile length and pile spacing on surface settlement and excavation bottom heave can be ignored.
- Open Access
- 12 February 2022
- Published by GeoScienceWorld in Lithosphere
- Vol. 2021 (Special 4)
Quantitative Threshold of Energy Fractal Dimension for Immediate Rock Burst Warning in Deep Tunnel: A Case Study
Rock bursts are a serious geological disaster occurring in deep underground engineering operations, which will cause casualties and economic loss. The quantitative threshold of energy fractal dimension for immediate rock burst warning in a deep tunnel was studied. The study was conducted based on the immediate rock burst cases in the deep tunnels of Jinping Hydropower Station, China. Firstly, a fractal dimension calculation method was proposed for deep linear tunnels associated with microseismic monitoring to explore the energy fractal dimension during the 37 immediate rock bursts and their development to events of different intensities (intense and moderate events). On this basis, a mechanism analysis was undertaken to assess the distribution range and evolution of the energy fractal dimension in the development of the immediate rock bursts. Then, the energy fractal dimension, as a quantitative threshold, was taken as a criterion for judging the rock burst risk. Furthermore, the corresponding warning index and dynamic control method were established. This index and method were applied in the subsequent construction process. The results can be used as a guide to establish a dynamic warning system based on the microseismicity monitored and provide a scientific basis for the prediction, warning, and risk-control standard of rock burst disasters during excavation of deep tunnels.
- 12 February 2022
- Published by GeoScienceWorld in Lithosphere
- Vol. 2021 (Special 4)
Open AccessQuantitative Threshold of Energy Fractal Dimension for Immediate Rock Burst Warning in Deep Tunnel: A Case Study
Rock bursts are a serious geological disaster occurring in deep underground engineering operations, which will cause casualties and economic loss. The quantitative threshold of energy fractal dimension for immediate rock burst warning in a deep tunnel was studied. The study was conducted based on the immediate rock burst cases in the deep tunnels of Jinping Hydropower Station, China. Firstly, a fractal dimension calculation method was proposed for deep linear tunnels associated with microseismic monitoring to explore the energy fractal dimension during the 37 immediate rock bursts and their development to events of different intensities (intense and moderate events). On this basis, a mechanism analysis was undertaken to assess the distribution range and evolution of the energy fractal dimension in the development of the immediate rock bursts. Then, the energy fractal dimension, as a quantitative threshold, was taken as a criterion for judging the rock burst risk. Furthermore, the corresponding warning index and dynamic control method were established. This index and method were applied in the subsequent construction process. The results can be used as a guide to establish a dynamic warning system based on the microseismicity monitored and provide a scientific basis for the prediction, warning, and risk-control standard of rock burst disasters during excavation of deep tunnels.
- 1 November 2021
- Published by American Society of Civil Engineers (ASCE) in International Journal of Geomechanics
- Vol. 21 (11) , 04021211
Warning Index Associated with Rock Burst in Deeply Buried Tunnels
Rock bursts are disastrous when occurring during the construction of tunnels in a deep underground rock mass, and they occur under two key conditions: energy release from surrounding rocks; and fracture propagation. Based on the construction process of the excavated segment of the marble around a deeply buried tunnel at the Jinping-II hydropower station (Sichuan Province, China), an analysis was conducted on the whole initiation and propagation processes of 40 rock bursts of different intensities. The analysis was carried out by combining numerical calculation with field microseismic (MS) monitoring. During the analysis, the local energy release rate (LERR) and fractal theory-based calculations were introduced. Furthermore, the dynamic warning index for rock burst risk of deeply buried tunnels in hard rock was established. When the peak LERR reached 2.51 × 105 J/m3 and the energy fractal dimension of MS events was greater than 0.32, there was a high rock burst risk. When the logarithm of the LERR was between 1.25 × 105 and 3.16 × 105 J/m3 and the logarithm of the energy released during MS was increased to 0.25–0.32, a slight rock burst risk arose. When the LERR was less than 105 J/m3, no rock burst risk arose. By applying the aforementioned warning indices to engineering practice, the probability of occurrence and potential risk of a rock burst during subsequent construction operations were decreased. The aforementioned results provide an important theoretical basis for smart and green excavation and safety life cycle solutions under high geostress conditions.
- 1 November 2021
- Published by American Society of Civil Engineers (ASCE) in International Journal of Geomechanics
- Vol. 21 (11) , 04021211
Warning Index Associated with Rock Burst in Deeply Buried Tunnels
Rock bursts are disastrous when occurring during the construction of tunnels in a deep underground rock mass, and they occur under two key conditions: energy release from surrounding rocks; and fracture propagation. Based on the construction process of the excavated segment of the marble around a deeply buried tunnel at the Jinping-II hydropower station (Sichuan Province, China), an analysis was conducted on the whole initiation and propagation processes of 40 rock bursts of different intensities. The analysis was carried out by combining numerical calculation with field microseismic (MS) monitoring. During the analysis, the local energy release rate (LERR) and fractal theory-based calculations were introduced. Furthermore, the dynamic warning index for rock burst risk of deeply buried tunnels in hard rock was established. When the peak LERR reached 2.51 × 105 J/m3 and the energy fractal dimension of MS events was greater than 0.32, there was a high rock burst risk. When the logarithm of the LERR was between 1.25 × 105 and 3.16 × 105 J/m3 and the logarithm of the energy released during MS was increased to 0.25–0.32, a slight rock burst risk arose. When the LERR was less than 105 J/m3, no rock burst risk arose. By applying the aforementioned warning indices to engineering practice, the probability of occurrence and potential risk of a rock burst during subsequent construction operations were decreased. The aforementioned results provide an important theoretical basis for smart and green excavation and safety life cycle solutions under high geostress conditions.
- 2 April 2021
- Published by ASTM International in Journal of Testing and Evaluation
- Vol. 50 (6) , 2883-2900
Correlation Analysis of Machine Performance Parameters and Rock Mass Properties during Tunnel Boring Machine Excavation Process: A Case Study in Yin-song Headrace Tunnel, China
A rock breaking process during the tunnel boring machine (TBM) excavation sequence involves a complicated interaction between the disc cutters and the tunnel face, and the excavation process is influenced both by the rock mass properties and the TBM performance. Hence, in achieving a highly efficient TBM excavation, a mutual feedback analysis of rock mass properties and machine parameters is important. In this study, a correlation analysis of rock mass properties and TBM parameters is conducted based on the field data obtained from the Yin-song headrace tunnel in Jilin Province, China. Firstly, the correlation between the rock mass properties (i.e., uniaxial compression strength and rock quality designation index) and the machine parameters (i.e., thrust force, cutterhead torque, rotational speed, penetration depth, and penetration rate) obtained during the stable operation stage of TBM is extensively investigated. The variation in the TBM penetration rate as a function of rock mass properties and machine operation parameters is studied. A statistical prediction model that defines the effects of rock mass properties on the TBM penetration rate is established by multivariate linear regression analysis. The validity of the prediction model is verified by using the in situ monitoring data obtained from two different chainages of the project. This study can help rationalize the TBM machine parameters in order to obtain a highly efficient TBM excavation and a low life-cycle cost for the machine.
- 2 April 2021
- Published by ASTM International in Journal of Testing and Evaluation
- Vol. 50 (6) , 2883-2900
Correlation Analysis of Machine Performance Parameters and Rock Mass Properties during Tunnel Boring Machine Excavation Process: A Case Study in Yin-song Headrace Tunnel, China
A rock breaking process during the tunnel boring machine (TBM) excavation sequence involves a complicated interaction between the disc cutters and the tunnel face, and the excavation process is influenced both by the rock mass properties and the TBM performance. Hence, in achieving a highly efficient TBM excavation, a mutual feedback analysis of rock mass properties and machine parameters is important. In this study, a correlation analysis of rock mass properties and TBM parameters is conducted based on the field data obtained from the Yin-song headrace tunnel in Jilin Province, China. Firstly, the correlation between the rock mass properties (i.e., uniaxial compression strength and rock quality designation index) and the machine parameters (i.e., thrust force, cutterhead torque, rotational speed, penetration depth, and penetration rate) obtained during the stable operation stage of TBM is extensively investigated. The variation in the TBM penetration rate as a function of rock mass properties and machine operation parameters is studied. A statistical prediction model that defines the effects of rock mass properties on the TBM penetration rate is established by multivariate linear regression analysis. The validity of the prediction model is verified by using the in situ monitoring data obtained from two different chainages of the project. This study can help rationalize the TBM machine parameters in order to obtain a highly efficient TBM excavation and a low life-cycle cost for the machine.