Ming Shan Ng
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Ming Shan Ng has a total of 15 co-authors. Here are the top co-authors by number of shared publications:
- Daniel Mark Hall
Management in the Built Environment, Faculty of Architecture and the Built Environment, TU Delft
3 shared publications Alexander N. Walzer
Zurich Univ. of Applied Sciences
1 shared publication- Bryan Tyrone Adey
ETH Zurich
1 shared publication Daniel Hall
Delft Univ. of Technology
1 shared publication- Edwin Zea Escamilla
ETH Zurich
1 shared publication - Fabian Kastner
Institute of Technology in Architecture ETH Zurich Zurich Switzerland
1 shared publication
Latest Publications
- 28 January 2025
- Published by Taylor & Francis
- p. 104-117
Smart or not? Perspectives on Digital Fabrication and Digital Construction
Digital fabrication and digital construction have been revolutionizing the construction supply chain through the ability to integrate information flows to address the bespoke nature of construction projects and the complexity of construction processes. Stakeholders have however questioned whether and exactly how implementing digital technologies would enable smart workflows over the construction supply chain to bridge upstream and downstream information gaps. This book chapter systematically illustrates the implementation framework of digital fabrication and digital construction to help guide stakeholders in managing data and material flows efficiently and ultimately help reduce rework and improve project quality. Two relevant case studies are presented to demonstrate the potential of digital fabrication and digital construction, respectively: (i) the clerestory steel structure project with a bespoke roof structure located on the West Coast of the United States and (ii) the prefabricated office building project with a complex design of prefabricated concrete columns located in Zurich Switzerland. Both case studies show that the key to successfully implementing information integration is that fabrication-related and interface information, such as the integrated schedules, should be fed into the design development for manufacturing and assembly so that rework and waste can be substantially reduced.
- 28 January 2025
- Published by Taylor & Francis
- p. 104-117
Smart or not? Perspectives on Digital Fabrication and Digital Construction
Digital fabrication and digital construction have been revolutionizing the construction supply chain through the ability to integrate information flows to address the bespoke nature of construction projects and the complexity of construction processes. Stakeholders have however questioned whether and exactly how implementing digital technologies would enable smart workflows over the construction supply chain to bridge upstream and downstream information gaps. This book chapter systematically illustrates the implementation framework of digital fabrication and digital construction to help guide stakeholders in managing data and material flows efficiently and ultimately help reduce rework and improve project quality. Two relevant case studies are presented to demonstrate the potential of digital fabrication and digital construction, respectively: (i) the clerestory steel structure project with a bespoke roof structure located on the West Coast of the United States and (ii) the prefabricated office building project with a complex design of prefabricated concrete columns located in Zurich Switzerland. Both case studies show that the key to successfully implementing information integration is that fabrication-related and interface information, such as the integrated schedules, should be fed into the design development for manufacturing and assembly so that rework and waste can be substantially reduced.
- Open Access
- 21 October 2024
- Published by Elsevier in Building and Environment
- Vol. 267
Adoption of Life Cycle Thinking: Impact-driven comparative assessment of Japanese construction corporations’ trends in practices
- 21 October 2024
- Published by Elsevier in Building and Environment
- Vol. 267
Open AccessAdoption of Life Cycle Thinking: Impact-driven comparative assessment of Japanese construction corporations’ trends in practices
- Open Access
- 1 February 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15 (1) , 04522043
Liability Factors and Conceptual Framework for Contracts to Manage Design for Digital Fabrication in Construction Projects
The adoption of digital fabrication—fabrication based on digital design—in the early design phase in projects requires a thorough understanding of the liability factors to design the contract. This paper addresses this issue using a two-stage research approach. First, a case study research maps the process from digital design to digital fabrication in an existing project that adopted digital fabrication using the design-bid-build model. Second, a three-round Delphi survey of 14 stakeholders of that project identifies and ranks 163 liability factors under eight categories: actors, resources, conditions, attributes, processes, artifacts, values, and risks. The resources of management capability and building information modeling (BIM) expertise rank as the two most important liability factors. Building on these findings, the paper presents a conceptual framework for contract design and discusses how the existing project delivery models—design-bid-build, construction management, design-build, and integrated project delivery (IPD)—can consider the liability factors in contracts.
- 1 February 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15 (1) , 04522043
Open AccessLiability Factors and Conceptual Framework for Contracts to Manage Design for Digital Fabrication in Construction Projects
The adoption of digital fabrication—fabrication based on digital design—in the early design phase in projects requires a thorough understanding of the liability factors to design the contract. This paper addresses this issue using a two-stage research approach. First, a case study research maps the process from digital design to digital fabrication in an existing project that adopted digital fabrication using the design-bid-build model. Second, a three-round Delphi survey of 14 stakeholders of that project identifies and ranks 163 liability factors under eight categories: actors, resources, conditions, attributes, processes, artifacts, values, and risks. The resources of management capability and building information modeling (BIM) expertise rank as the two most important liability factors. Building on these findings, the paper presents a conceptual framework for contract design and discusses how the existing project delivery models—design-bid-build, construction management, design-build, and integrated project delivery (IPD)—can consider the liability factors in contracts.
- Open Access
- 1 September 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38 (5) , 04022052
Designing for Digital Fabrication: An Empirical Study of Industry Needs, Perceived Benefits, and Strategies for Adoption
Digital fabrication is growing in adoption within the architecture, engineering, and construction industry. Because digital fabrication often requires a systematic rethinking of the design process, research emphasizes new understanding is needed for digital systems across multiple areas, including technical development, technological systems, organizational contexts, contractual provisions, and business models. Despite the importance of a system view, the current body of knowledge does not yet provide a consistent identification nor a comprehensive evaluation of factors and their complex interdependencies with one another. To fill this knowledge gap, this work categorizes and identifies the industry needs and perceived benefits under five areas. Next, the authors conducted a questionnaire survey, which received effective responses from 114 industry stakeholders. The authors analyzed the responses using Rao–Scott chi-squared tests of independence to identify 70 pairs of correlated categories. This work further investigates the variables’ correlations using heat map visualization. Two variable-correlation mappings are presented as follows: (1) a multiaspect mapping of 292 variable correlations under 10 categories of the industry needs of fabrication information and aspects in design modeling, review, and documentation; and (2) a single-aspect mapping of 26 correlations regarding the industry needs for various benefits of digital systems to adopt digital fabrication. Thereby, this work proposes seven strategy propositions to achieve the benefits of digital systems when adopting digital fabrication in design. The consistent identification of the needs and their interdependencies constitute an integral part of knowledge in construction management.
- 1 September 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38 (5) , 04022052
Open AccessDesigning for Digital Fabrication: An Empirical Study of Industry Needs, Perceived Benefits, and Strategies for Adoption
Digital fabrication is growing in adoption within the architecture, engineering, and construction industry. Because digital fabrication often requires a systematic rethinking of the design process, research emphasizes new understanding is needed for digital systems across multiple areas, including technical development, technological systems, organizational contexts, contractual provisions, and business models. Despite the importance of a system view, the current body of knowledge does not yet provide a consistent identification nor a comprehensive evaluation of factors and their complex interdependencies with one another. To fill this knowledge gap, this work categorizes and identifies the industry needs and perceived benefits under five areas. Next, the authors conducted a questionnaire survey, which received effective responses from 114 industry stakeholders. The authors analyzed the responses using Rao–Scott chi-squared tests of independence to identify 70 pairs of correlated categories. This work further investigates the variables’ correlations using heat map visualization. Two variable-correlation mappings are presented as follows: (1) a multiaspect mapping of 292 variable correlations under 10 categories of the industry needs of fabrication information and aspects in design modeling, review, and documentation; and (2) a single-aspect mapping of 26 correlations regarding the industry needs for various benefits of digital systems to adopt digital fabrication. Thereby, this work proposes seven strategy propositions to achieve the benefits of digital systems when adopting digital fabrication in design. The consistent identification of the needs and their interdependencies constitute an integral part of knowledge in construction management.
- Open Access
- 6 August 2021
- Published by Taylor & Francis in Architectural Engineering and Design Management
- Vol. 19 (1) , 39-55
Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study
Digital Fabrication (DFAB) is a systemic innovation with low adoption rates in architecture, engineering and construction (AEC) projects. Managing requirements of a new design process is one major challenge for the increased DFAB adoption. For other types of innovations, practices such as Building Information Modelling (BIM) and Early Contractor Involvement (ECI) improve design management by integrating process, information and organisation in construction projects. In theory, BIM and ECI could improve design management and increase the adoption of DFAB. However, the relationship between DFAB, BIM and ECI has not yet been studied thoroughly. There is a need to understand new paradigms of DFAB design management in regard to process integration, information integration and organisational integration. This study undertakes a comparative study of four DFAB adoptions in AEC projects with varying levels of BIM and ECI implementation. The design processes of DFAB are traced using swimlane process diagrams. From this, relationships between DFAB, BIM, and ECI are derived using a quadripartite interrelationship diagram. This work illustrates the proposed relationships in DFAB adoption in design using a fishbone diagram. This work concludes with potential future research in design management for digital fabrication, including five takeaways for practitioners to adopt and manage DFAB in the design process of construction projects.
- 6 August 2021
- Published by Taylor & Francis in Architectural Engineering and Design Management
- Vol. 19 (1) , 39-55
Open AccessDigital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study
Digital Fabrication (DFAB) is a systemic innovation with low adoption rates in architecture, engineering and construction (AEC) projects. Managing requirements of a new design process is one major challenge for the increased DFAB adoption. For other types of innovations, practices such as Building Information Modelling (BIM) and Early Contractor Involvement (ECI) improve design management by integrating process, information and organisation in construction projects. In theory, BIM and ECI could improve design management and increase the adoption of DFAB. However, the relationship between DFAB, BIM and ECI has not yet been studied thoroughly. There is a need to understand new paradigms of DFAB design management in regard to process integration, information integration and organisational integration. This study undertakes a comparative study of four DFAB adoptions in AEC projects with varying levels of BIM and ECI implementation. The design processes of DFAB are traced using swimlane process diagrams. From this, relationships between DFAB, BIM, and ECI are derived using a quadripartite interrelationship diagram. This work illustrates the proposed relationships in DFAB adoption in design using a fishbone diagram. This work concludes with potential future research in design management for digital fabrication, including five takeaways for practitioners to adopt and manage DFAB in the design process of construction projects.