RVR. Volkmer

R. Volkmer

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


R. Volkmer has a total of 24 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Mechanical design of the solar telescope GREGOR

    by R. Volkmer, P. Eisenträger, P. Emde, A. Fischer, O. von der Lühe, H. Nicklas, D. Soltau, W. Schmidt, U. Weis

    The mechanical structure of the GREGOR telescope was installed at the Observatorio del Teide, Tenerife, in 2004. New concepts for mounting and cooling of the 1.5‐meter primary mirror were introduced. GREGOR is an open telescope, therefore the dome is completely open during observations to allow for air flushing through the open, but stiff telescope structure. Backside cooling system of the primary mirror keeps the mirror surface close to ambient temperature to prevent mirror seeing. The large collecting area of the primary mirror results in high energy density at the field stop at the prime focus of the primary which needs to be removed. The optical elements are supported by precision alignment systems and should provide a stable solar image at the optical lab. The coudé train can be evacuated and serves as a natural barrier between the outer environmental conditions and the air‐conditioned optical laboratory with its sensitive scientific instrumentation. The telescope was successfully commissioned and will start its nominal operation during 2013


  • GREGOR solar telescope: Design and status

    by R. Volkmer, O. von der Lühe, C. Denker, S.K. Solanki, H. Balthasar, T. Berkefeld, P. Caligari, M. Collados, A. Fischer, C. Halbgewachs, et al.

    The integration and verification phase of the GREGOR telescope reached an important milestone with the installation of the interim 1 m SolarLite primary mirror. This was the first time that the entire light path had seen sunlight. Since then extensive testing of the telescope and its subsystems has been carried out. The integration and verification phase will culminate with the delivery and installation of the final 1.5 m Zerodur primary mirror in the summer of 2010. Observatory level tests and science verification will commence in the second half of 2010 and in 2011. This phase includes testing of the main optics, adaptive optics, cooling and pointing systems. In addition, assuming the viewpoint of a typical user, various observational modes of the GREGOR Fabry‐Pérot Interferometer (GFPI), the Grating Infrared Spectrograph (GRIS), and high‐speed camera systems will be tested to evaluate if they match the expectations and science requirements. This ensures that GREGOR will provide high‐quality observations with its combination of (multi‐conjugate) adaptive optics and advanced post‐focus instruments. Routine observations are expected for 2012