Deepthi Vaidhynathan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Deepthi Vaidhynathan has a total of 79 co-authors. Here are the top co-authors by number of shared publications:
- Kumaraguru Prabakar
National Laboratory of the Rockies (NLR), Golden, CO (United States)
9 shared publications - Andy Hoke
National Laboratory of the Rockies (NLR), Golden, CO (United States)
3 shared publications - Jin Tan
National Laboratory of the Rockies (NLR), Golden, CO (United States)
3 shared publications Saurav Talukdar
Verrus LLC, Mountain View, CA (United States)
3 shared publicationsShilpa Marti
Verrus LLC, Mountain View, CA (United States)
3 shared publicationsBen Wheeler
Verrus LLC, Beverly Hills, CA (United States)
2 shared publications
Latest Publications
- Open Access
- 2 April 2026
- Published by Office of Scientific and Technical Information (OSTI)
Empirical Comparison of Machine Learning Approaches for Black-Box Modeling of Power Conversion System Dynamics
Inverter-based resources are key components in modern power systems, but accurately modeling their complex behavior can be challenging. Standard, generic converter models often oversimplify inverter dynamics, leading to significant errors in predicting performance. In this work, we compare several data-driven machine learning (ML) approaches for inverter modeling, performing experiments on power conversion systems, systematically varying input conditions, and recording the resulting voltages and currents. The ML models were then trained on this measured data to capture the inverter's dynamic response and to predict the inverter's output current. A performance comparison between the four ML models under study is conducted, laying the foundation for future work on hardware implementation for real-time inference.
- 2 April 2026
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessEmpirical Comparison of Machine Learning Approaches for Black-Box Modeling of Power Conversion System Dynamics
Inverter-based resources are key components in modern power systems, but accurately modeling their complex behavior can be challenging. Standard, generic converter models often oversimplify inverter dynamics, leading to significant errors in predicting performance. In this work, we compare several data-driven machine learning (ML) approaches for inverter modeling, performing experiments on power conversion systems, systematically varying input conditions, and recording the resulting voltages and currents. The ML models were then trained on this measured data to capture the inverter's dynamic response and to predict the inverter's output current. A performance comparison between the four ML models under study is conducted, laying the foundation for future work on hardware implementation for real-time inference.
- Open Access
- 17 February 2026
- Published by Office of Scientific and Technical Information (OSTI)
Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on Banshee Distribution Network
This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.
- 17 February 2026
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessUse of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on Banshee Distribution Network
This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.
- Open Access
- 13 February 2026
- Published by Office of Scientific and Technical Information (OSTI)
Modeling Framework for Data Center
This chapter highlights the critical need for advanced modeling of data centers due to their rapidly increasing energy consumption and impact on grid reliability. Driven by the demand for AI applications, data centers are projected to consume a significant portion of US energy by 2028, putting stress on an already challenged power grid. The chapter emphasizes the importance of "fast" time-scale models to understand the dynamic interactions between data centers and the grid, especially given the rapid power fluctuations of AI workloads. It outlines a modeling framework that includes both offline and real-time EMT domain simulations, detailing the necessary representations for various components like utility interfaces, transformers, IT loads, UPS, cooling loads, Battery Energy Storage Systems (BESS), generators, protection systems, and higher-level control systems. While standard simulation tools like PSCAD offer basic models, custom development is often required to accurately capture the unique and fast-changing behaviors of modern data centers. The chapter also discusses key metrics and test cases for validating these models, focusing on transient load responses, protection relay coordination, and demand flexibility. Finally, it addresses the challenges of modeling large-scale data centers, such as computational complexity and the trade-off between model fidelity and practicality, suggesting hybrid modeling approaches as a solution. The overarching goal is to create a robust framework that helps assess data center impacts on grid stability, identify vulnerabilities, and inform the development of standards for reliable integration of these large loads into the bulk power system.
- 13 February 2026
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessModeling Framework for Data Center
This chapter highlights the critical need for advanced modeling of data centers due to their rapidly increasing energy consumption and impact on grid reliability. Driven by the demand for AI applications, data centers are projected to consume a significant portion of US energy by 2028, putting stress on an already challenged power grid. The chapter emphasizes the importance of "fast" time-scale models to understand the dynamic interactions between data centers and the grid, especially given the rapid power fluctuations of AI workloads. It outlines a modeling framework that includes both offline and real-time EMT domain simulations, detailing the necessary representations for various components like utility interfaces, transformers, IT loads, UPS, cooling loads, Battery Energy Storage Systems (BESS), generators, protection systems, and higher-level control systems. While standard simulation tools like PSCAD offer basic models, custom development is often required to accurately capture the unique and fast-changing behaviors of modern data centers. The chapter also discusses key metrics and test cases for validating these models, focusing on transient load responses, protection relay coordination, and demand flexibility. Finally, it addresses the challenges of modeling large-scale data centers, such as computational complexity and the trade-off between model fidelity and practicality, suggesting hybrid modeling approaches as a solution. The overarching goal is to create a robust framework that helps assess data center impacts on grid stability, identify vulnerabilities, and inform the development of standards for reliable integration of these large loads into the bulk power system.
- Open Access
- 1 February 2026
- Published by Office of Scientific and Technical Information (OSTI)
Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture
Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.
- 1 February 2026
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessMitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture
Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.
- Open Access
- 1 January 2026
- Published by National Laboratory of the Rockies
Semi-Automated, Open-Sourced Utility Network Reconstruction Using LiDAR and OpenStreetMaps
- 1 January 2026
- Published by National Laboratory of the Rockies
Open AccessSemi-Automated, Open-Sourced Utility Network Reconstruction Using LiDAR and OpenStreetMaps
- Open Access
- 1 January 2026
- Published by National Laboratory of the Rockies
Combining Generative Modeling and Advanced Control for Building Scenario Generation
- 1 January 2026
- Published by National Laboratory of the Rockies
Open AccessCombining Generative Modeling and Advanced Control for Building Scenario Generation
- Open Access
- 1 January 2026
- Published by National Laboratory of the Rockies
De-Risking Field Deployment of Storage Assets Using Hardware-in-the-Loop Experiments
- 1 January 2026
- Published by National Laboratory of the Rockies
Open AccessDe-Risking Field Deployment of Storage Assets Using Hardware-in-the-Loop Experiments
- Open Access
- 26 August 2025
- Published by Office of Scientific and Technical Information (OSTI)
Intelligently Partitioned Phasor-EMT Hybrid Simulations of Large-Scale, High-IBR Power Systems
As the penetration level of power electronics-interfaced renewables such as photovoltaics (PV) and wind has surged in modern electric grids, new operational risks caused by the dynamics of those inverter-based resources (IBRs) are emerging in parallel. Lessons learned from various grid events include that the impact of IBRs on system-level grid stability will become prominent along with the increase of renewables and that the short-timescale dynamic impacts of IBRs on grid stability are not fully captured by current commercial dynamic simulation tools [1] [2]. For example, IBRs can be controlled to mitigate those destabilizing interactions, but conventional phasor-domain tools (e.g. PSS/E, PSLF) often cannot capture that; likewise, the existing electromagnetic transient (EMT) simulation tools (e.g. PSCAD, EMTP) can simulate detailed IBR controls, but for large power systems with many IBRs, slow simulation speeds severely impede the ability to study dynamic events [3] [4]. Massively paralleling simulations using high-performance computing (HPC) can help address this, especially now that cloud-based HPC capability is widely available, but today s EMT tools are not HPC-compatible, and parallelization of dynamic simulation solvers is not trivial because each region can dynamically affect the others. Thus, dynamic simulation of grids with very large numbers of IBRs potentially poses a barrier to the ongoing energy transition.
- 26 August 2025
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessIntelligently Partitioned Phasor-EMT Hybrid Simulations of Large-Scale, High-IBR Power Systems
As the penetration level of power electronics-interfaced renewables such as photovoltaics (PV) and wind has surged in modern electric grids, new operational risks caused by the dynamics of those inverter-based resources (IBRs) are emerging in parallel. Lessons learned from various grid events include that the impact of IBRs on system-level grid stability will become prominent along with the increase of renewables and that the short-timescale dynamic impacts of IBRs on grid stability are not fully captured by current commercial dynamic simulation tools [1] [2]. For example, IBRs can be controlled to mitigate those destabilizing interactions, but conventional phasor-domain tools (e.g. PSS/E, PSLF) often cannot capture that; likewise, the existing electromagnetic transient (EMT) simulation tools (e.g. PSCAD, EMTP) can simulate detailed IBR controls, but for large power systems with many IBRs, slow simulation speeds severely impede the ability to study dynamic events [3] [4]. Massively paralleling simulations using high-performance computing (HPC) can help address this, especially now that cloud-based HPC capability is widely available, but today s EMT tools are not HPC-compatible, and parallelization of dynamic simulation solvers is not trivial because each region can dynamically affect the others. Thus, dynamic simulation of grids with very large numbers of IBRs potentially poses a barrier to the ongoing energy transition.
- Open Access
- 1 June 2025
- Published by Office of Scientific and Technical Information (OSTI)
Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset
Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.
- 1 June 2025
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessVulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset
Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.