Abdelrahman M. Farouk
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Abdelrahman M. Farouk has a total of 31 co-authors. Here are the top co-authors by number of shared publications:
- Abdul Rahimi Abdul Rahman
Universiti Malaysia Pahang Al-Sultan Abdullah
12 shared publications - Noor Suraya Romali
Universiti Malaysia Pahang Al-Sultan Abdullah
4 shared publications - Afiqah R. Radzi
Universiti Malaysia Pahang Al-Sultan Abdullah
2 shared publications - Ahmad Tarmizi Haron
Department of Civil, Environmental and Architectural Engineering University of Colorado Boulder 80309 CO USA
2 shared publications - Eleni Papadonikolaki
TU Delft
2 shared publications - Mazen M. Omer
Universiti Teknologi Malaysia Faculty of Built Environment and Surveying
2 shared publications
Latest Publications
- 19 September 2026
- Published by Elsevier in Physics and Chemistry of the Earth, Parts A/B/C
- Vol. 145
An integrated framework for indoor air quality in Saudi Arabia: A systematic literature review
- 19 September 2026
- Published by Elsevier in Physics and Chemistry of the Earth, Parts A/B/C
- Vol. 145
An integrated framework for indoor air quality in Saudi Arabia: A systematic literature review
- 11 September 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- p. 1-18
Integrating computer vision with building information modeling for resilient construction: a data-rich visibility roadmap
Purpose: Computer vision (CV) and Building Information Modeling (BIM) (CV-BIM) are increasingly used in digital construction, yet often operate as standalone tools rather than integrated socio-technological components for resilient, circular, and net-positive built environments. This separation limits data-rich visibility across the construction lifecycle. Therefore, this study explores CV-BIM integration for resilient construction. Design/methodology/approach: The search was conducted on October 29, 2025, without date restrictions, and included 127 Web of Science journal articles with 4,453 cited references. Citation, co-citation, and co-occurrence analyses used VOSviewer. The bibliometric findings and selected case studies were used to develop a data-rich visibility roadmap. Findings: Citation analysis identified three themes representing the field's intellectual foundations. Co-citation analysis revealed four clusters characterizing the current knowledge structure, while co-occurrence analysis identified five clusters indicating future research directions. The study also identified six case studies integrating CV and BIM for resilient construction. Accordingly, a data-rich visibility roadmap was developed to support lifecycle visibility and resilient built environment outcomes. Research limitations/implications: The roadmap informs theory and practice by translating identified gaps into measurable constructs, supporting hypothesis development, and prioritizing empirical validation of CV-BIM integration. Originality/value: This study synthesizes fragmented CV-BIM research into a resilience-oriented roadmap for data-rich, circular, and net-positive built environments.
- 11 September 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- p. 1-18
Integrating computer vision with building information modeling for resilient construction: a data-rich visibility roadmap
Purpose: Computer vision (CV) and Building Information Modeling (BIM) (CV-BIM) are increasingly used in digital construction, yet often operate as standalone tools rather than integrated socio-technological components for resilient, circular, and net-positive built environments. This separation limits data-rich visibility across the construction lifecycle. Therefore, this study explores CV-BIM integration for resilient construction. Design/methodology/approach: The search was conducted on October 29, 2025, without date restrictions, and included 127 Web of Science journal articles with 4,453 cited references. Citation, co-citation, and co-occurrence analyses used VOSviewer. The bibliometric findings and selected case studies were used to develop a data-rich visibility roadmap. Findings: Citation analysis identified three themes representing the field's intellectual foundations. Co-citation analysis revealed four clusters characterizing the current knowledge structure, while co-occurrence analysis identified five clusters indicating future research directions. The study also identified six case studies integrating CV and BIM for resilient construction. Accordingly, a data-rich visibility roadmap was developed to support lifecycle visibility and resilient built environment outcomes. Research limitations/implications: The roadmap informs theory and practice by translating identified gaps into measurable constructs, supporting hypothesis development, and prioritizing empirical validation of CV-BIM integration. Originality/value: This study synthesizes fragmented CV-BIM research into a resilience-oriented roadmap for data-rich, circular, and net-positive built environments.
- 8 October 2025
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16  (1) , 129-147
Identification of critical soft cost elements in BIM-based construction projects: a Delphi survey
Purpose: Building information modeling (BIM) offers numerous benefits for construction projects, but its implementation can include additional non-physical costs, commonly referred to as soft costs, distinct from traditional construction projects. Hence, understanding the soft cost elements (SCEs) is critical for accurate cost estimation in BIM-based construction projects. This study aims to identify the critical SCEs in BIM-based construction projects. Design/methodology/approach: This study conducted a multi-stage approach, starting with an SLR to compile an initial list of SCEs, which was refined through a pilot test with BIM experts. A Delphi survey conducted with 16 experts evaluated the SCEs for two rounds. Data analysis included mean values and percentage of agreement analyses to identify the critical SCEs. Finally, a thematic analysis was conducted to categorize the critical SCEs. Findings: This study identified eight critical SCEs in BIM-based construction projects, categorized into two categories: technology and human resources. Technology-related costs include BIM software, hardware, updates and BIM-specific planning/designing. Human resource-related costs encompass BIM consultant, modeler, coordinator and manager remuneration. Originality/value: This is the first study to determine the critical SCEs in BIM-based construction projects. Understanding the critical SCEs provides stakeholders with actionable insights for developing strategies to improve the cost management of SCEs in BIM-based construction projects.
- 8 October 2025
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16  (1) , 129-147
Identification of critical soft cost elements in BIM-based construction projects: a Delphi survey
Purpose: Building information modeling (BIM) offers numerous benefits for construction projects, but its implementation can include additional non-physical costs, commonly referred to as soft costs, distinct from traditional construction projects. Hence, understanding the soft cost elements (SCEs) is critical for accurate cost estimation in BIM-based construction projects. This study aims to identify the critical SCEs in BIM-based construction projects. Design/methodology/approach: This study conducted a multi-stage approach, starting with an SLR to compile an initial list of SCEs, which was refined through a pilot test with BIM experts. A Delphi survey conducted with 16 experts evaluated the SCEs for two rounds. Data analysis included mean values and percentage of agreement analyses to identify the critical SCEs. Finally, a thematic analysis was conducted to categorize the critical SCEs. Findings: This study identified eight critical SCEs in BIM-based construction projects, categorized into two categories: technology and human resources. Technology-related costs include BIM software, hardware, updates and BIM-specific planning/designing. Human resource-related costs encompass BIM consultant, modeler, coordinator and manager remuneration. Originality/value: This is the first study to determine the critical SCEs in BIM-based construction projects. Understanding the critical SCEs provides stakeholders with actionable insights for developing strategies to improve the cost management of SCEs in BIM-based construction projects.
- Open Access
- 1 July 2025
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 15  (3) , 1-12
Factors Affecting Soft Cost in BIM-Based Construction Projects
- 1 July 2025
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 15  (3) , 1-12
Open AccessFactors Affecting Soft Cost in BIM-Based Construction Projects
- Open Access
- 1 January 2025
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 30  (1) , 1659-1679
Holistic framework for soft costs in BIM-based construction projects
Implementing Building Information Modeling (BIM) brings efficiencies to construction projects, yet evaluating the associated soft costs remains challenging. This study aims to develop and validate a framework for soft cost elements (SCEs) in BIM-based construction projects. A systematic literature review (SLR) and thematic analysis initially identified 31 SCEs, which were subsequently organized using framework analysis by project phase (planning, preconstruction, construction, and post-construction) and time category (discrete vs. continuous). Inter-rater reliability for the categorization reached 81.3%. Expert validation (n = 16) refined the framework and added seven BIM-specific SCEs, resulting in a total of 38. Theoretically, the framework extends soft-cost theory into the digital domain by modeling BIM-specific remuneration and overheads and by introducing a phase–time structure that explains when and how soft costs arise. Practically, it is operationalized as a decision tool: owners and quantity surveyors can use it as a checklist to create explicit budget lines, scope BIM roles, and update cadences in contracts, and monitor continuous costs monthly while tying discrete costs to milestones, thereby improving estimation accuracy, return-on-investment assessment, and risk control across the project lifecycle. To our knowledge, this is the first validated, phase–time SCE framework for BIM-based construction projects.
- 1 January 2025
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 30  (1) , 1659-1679
Open AccessHolistic framework for soft costs in BIM-based construction projects
Implementing Building Information Modeling (BIM) brings efficiencies to construction projects, yet evaluating the associated soft costs remains challenging. This study aims to develop and validate a framework for soft cost elements (SCEs) in BIM-based construction projects. A systematic literature review (SLR) and thematic analysis initially identified 31 SCEs, which were subsequently organized using framework analysis by project phase (planning, preconstruction, construction, and post-construction) and time category (discrete vs. continuous). Inter-rater reliability for the categorization reached 81.3%. Expert validation (n = 16) refined the framework and added seven BIM-specific SCEs, resulting in a total of 38. Theoretically, the framework extends soft-cost theory into the digital domain by modeling BIM-specific remuneration and overheads and by introducing a phase–time structure that explains when and how soft costs arise. Practically, it is operationalized as a decision tool: owners and quantity surveyors can use it as a checklist to create explicit budget lines, scope BIM roles, and update cadences in contracts, and monitor continuous costs monthly while tying discrete costs to milestones, thereby improving estimation accuracy, return-on-investment assessment, and risk control across the project lifecycle. To our knowledge, this is the first validated, phase–time SCE framework for BIM-based construction projects.
- Open Access
Exploring the Economic Viability of Virtual Reality in Architectural, Engineering, and Construction Education
The role of technology in education is becoming increasingly important, and the introduction of advanced technology and AI is transforming the way we learn. Virtual reality (VR) is an effective technology that enhances student engagement and improves learning outcomes. However, the cost of implementing VR is a significant concern for educational institutions, making integrating VR technology into education challenging. To address this challenge, this study aims to explore the costs associated with integrating VR into architectural, engineering, and construction (AEC) education. The study had three objectives: to identify relevant case studies that utilized VR in AEC education, to perform keyword analysis, and to conduct a cost analysis of the selected case studies. The thematic analysis identified VR applications in various categories, including VR platforms, construction safety training, design review simulators, civil engineering labs, building information modeling (BIM) integration, architectural design, and surveying engineering. The results revealed that the cost of VR varies based on the application, indicating that it is possible to implement VR in education even on a limited budget. This research provides valuable insights and recommendations for researchers and practitioners who want to adopt VR technology in AEC education effectively.
Open AccessExploring the Economic Viability of Virtual Reality in Architectural, Engineering, and Construction Education
The role of technology in education is becoming increasingly important, and the introduction of advanced technology and AI is transforming the way we learn. Virtual reality (VR) is an effective technology that enhances student engagement and improves learning outcomes. However, the cost of implementing VR is a significant concern for educational institutions, making integrating VR technology into education challenging. To address this challenge, this study aims to explore the costs associated with integrating VR into architectural, engineering, and construction (AEC) education. The study had three objectives: to identify relevant case studies that utilized VR in AEC education, to perform keyword analysis, and to conduct a cost analysis of the selected case studies. The thematic analysis identified VR applications in various categories, including VR platforms, construction safety training, design review simulators, civil engineering labs, building information modeling (BIM) integration, architectural design, and surveying engineering. The results revealed that the cost of VR varies based on the application, indicating that it is possible to implement VR in education even on a limited budget. This research provides valuable insights and recommendations for researchers and practitioners who want to adopt VR technology in AEC education effectively.
- Open Access
- 10 April 2024
- Published by MDPI AG in Sustainability
- Vol. 16  (8) , 3146
Performance Indicators for Assessing Environmental Management Plan Implementation in Water Projects
This research aims to examine the performance indicators that are crucial for assessing the implementation of environmental management plans (EMPs) in water projects. To achieve this aim, a questionnaire survey, integrating a systematic literature review (SLR), was used to identify the initial performance indicators. Subsequently, ten interviews with environmental professionals were carried out to uncover additional indicators not identified by the SLR. Following the survey design and pilot study of the survey, the data collection resulted in 112 valid responses from environmental professionals engaged in water projects in Saudi Arabia. The data analysis encompassed reliability tests, mean ranking, normalized mean analysis, exploratory factor analysis (EFA), and partial least squares structural equation modeling (PLS-SEM). The normalized mean analysis highlighted 13 critical parameters among 39 for further investigation. The EFA disclosed three underlying constructs: environmental impact indicators, operational and safety indicators, waste management, and public safety indicators. PLS-SEM was used to validate the relationship between these indicators and the successful implementation of EMPs. The results indicate that all three underlying constructs positively influence the effective execution of such plans. This is the first study to model the relationships of the performance indicators in water projects. The study’s findings underscore the importance of developing precise performance indicators tailored to diverse construction projects that are mainly focused on water facility construction. The identified performance indicators offer significant insights for policymakers, practitioners, and researchers and provide a solid foundation for the advancement of knowledge in the field of environmental management.
- 10 April 2024
- Published by MDPI AG in Sustainability
- Vol. 16  (8) , 3146
Open AccessPerformance Indicators for Assessing Environmental Management Plan Implementation in Water Projects
This research aims to examine the performance indicators that are crucial for assessing the implementation of environmental management plans (EMPs) in water projects. To achieve this aim, a questionnaire survey, integrating a systematic literature review (SLR), was used to identify the initial performance indicators. Subsequently, ten interviews with environmental professionals were carried out to uncover additional indicators not identified by the SLR. Following the survey design and pilot study of the survey, the data collection resulted in 112 valid responses from environmental professionals engaged in water projects in Saudi Arabia. The data analysis encompassed reliability tests, mean ranking, normalized mean analysis, exploratory factor analysis (EFA), and partial least squares structural equation modeling (PLS-SEM). The normalized mean analysis highlighted 13 critical parameters among 39 for further investigation. The EFA disclosed three underlying constructs: environmental impact indicators, operational and safety indicators, waste management, and public safety indicators. PLS-SEM was used to validate the relationship between these indicators and the successful implementation of EMPs. The results indicate that all three underlying constructs positively influence the effective execution of such plans. This is the first study to model the relationships of the performance indicators in water projects. The study’s findings underscore the importance of developing precise performance indicators tailored to diverse construction projects that are mainly focused on water facility construction. The identified performance indicators offer significant insights for policymakers, practitioners, and researchers and provide a solid foundation for the advancement of knowledge in the field of environmental management.
- Open Access
Enhancing Construction Safety Education: Insights from Student Perspectives
Construction safety education is crucial as it ensures worker well-being, improves construction quality, and contributes to sustainable infrastructure development and safeguarding lives. This study aims to examine students’ perceptions of construction safety education. A structured questionnaire survey aligned with the National Examination Board in Occupational Safety and Health (NEBOSH) safety topics was used to collect data from students on their understanding of construction safety topics (CSTs). Data were gathered from 161 students and analyzed using Cronbach’s alpha, mean calculations, standard deviation measurements, normalization value, Kruskal–Wallis tests, and correlation analysis. The findings reveal a strong awareness and interest in fire safety, with variations across engineering faculties, academic years, and specific topics, suggesting the need for tailored educational strategies to improve construction safety knowledge and align education with industry needs. This study represents the first investigation into students’ comprehension of CSTs in Saudi Arabia. The study insights can guide decisionmakers in refining existing curriculums, ensuring students develop a strong understanding of safety protocols in construction projects. By aligning education with industry requirements, policymakers can enhance the preparedness of graduates, promoting safer practices in engineering. This contributes to the overall economic and safety progress of nations.
Open AccessEnhancing Construction Safety Education: Insights from Student Perspectives
Construction safety education is crucial as it ensures worker well-being, improves construction quality, and contributes to sustainable infrastructure development and safeguarding lives. This study aims to examine students’ perceptions of construction safety education. A structured questionnaire survey aligned with the National Examination Board in Occupational Safety and Health (NEBOSH) safety topics was used to collect data from students on their understanding of construction safety topics (CSTs). Data were gathered from 161 students and analyzed using Cronbach’s alpha, mean calculations, standard deviation measurements, normalization value, Kruskal–Wallis tests, and correlation analysis. The findings reveal a strong awareness and interest in fire safety, with variations across engineering faculties, academic years, and specific topics, suggesting the need for tailored educational strategies to improve construction safety knowledge and align education with industry needs. This study represents the first investigation into students’ comprehension of CSTs in Saudi Arabia. The study insights can guide decisionmakers in refining existing curriculums, ensuring students develop a strong understanding of safety protocols in construction projects. By aligning education with industry requirements, policymakers can enhance the preparedness of graduates, promoting safer practices in engineering. This contributes to the overall economic and safety progress of nations.
- Open Access
- 10 January 2024
- Published by MDPI AG in Sustainability
- Vol. 16  (2) , 600
Assessing Environmental Management Plan Implementation in Water Supply Construction Projects: Key Performance Indicators
Assessing the implementation of environmental management plans (EMPs) in construction projects is crucial for meeting environmental sustainability goals and reducing potential adverse impacts. By using performance indicators (PIs), stakeholders can objectively measure the performance of EMP implementation, identifying areas of success and areas that may require improvement. Therefore, this study aims to examine the PIs for assessing EMP implementation in water supply construction projects, using Saudi Arabia as a case study. Data from semi-structured interviews and a systematic literature review were used to develop a potential list of PIs. Then, the PIs were used to create a survey and distributed to industry professionals. Data from 112 respondents were analyzed using mean ranking analysis, the normalization method, exploratory factor analysis (EFA), and fuzzy synthetic evaluation (FSE). Eighteen critical PIs for assessing EMP implementation in water supply construction projects were identified, including public safety, road safety hazards, construction waste, clogged drainage, irregular flooding, the spilling of chemical substances, slope failures, soil erosion, landslide occurrence, increased schedule waste, changes in the color of bodies of water, oil/fuel spills, restricted site accessibility, the smell of run-off water, traffic accidents on construction sites, the spread of disease, changes in the color of run-off water, and overflowing silt traps. The EFA revealed that PIs can be grouped into three underlying constructs: fluid-related indicators, health and safety-related indicators, and site environment-related indicators. The FSE results confirmed that all PIs are between moderately critical to critical. This study’s significance lies in its examination of PIs that aim to improve the environmental performance of water supply construction projects. Understanding which indicators are most effective allows for targeted improvements, helping to minimize negative environmental impacts and ensuring sustainable practices. Finally, this study is a pioneer in examining the critical PIs for assessing EMP implementation in water supply construction projects.
- 10 January 2024
- Published by MDPI AG in Sustainability
- Vol. 16  (2) , 600
Open AccessAssessing Environmental Management Plan Implementation in Water Supply Construction Projects: Key Performance Indicators
Assessing the implementation of environmental management plans (EMPs) in construction projects is crucial for meeting environmental sustainability goals and reducing potential adverse impacts. By using performance indicators (PIs), stakeholders can objectively measure the performance of EMP implementation, identifying areas of success and areas that may require improvement. Therefore, this study aims to examine the PIs for assessing EMP implementation in water supply construction projects, using Saudi Arabia as a case study. Data from semi-structured interviews and a systematic literature review were used to develop a potential list of PIs. Then, the PIs were used to create a survey and distributed to industry professionals. Data from 112 respondents were analyzed using mean ranking analysis, the normalization method, exploratory factor analysis (EFA), and fuzzy synthetic evaluation (FSE). Eighteen critical PIs for assessing EMP implementation in water supply construction projects were identified, including public safety, road safety hazards, construction waste, clogged drainage, irregular flooding, the spilling of chemical substances, slope failures, soil erosion, landslide occurrence, increased schedule waste, changes in the color of bodies of water, oil/fuel spills, restricted site accessibility, the smell of run-off water, traffic accidents on construction sites, the spread of disease, changes in the color of run-off water, and overflowing silt traps. The EFA revealed that PIs can be grouped into three underlying constructs: fluid-related indicators, health and safety-related indicators, and site environment-related indicators. The FSE results confirmed that all PIs are between moderately critical to critical. This study’s significance lies in its examination of PIs that aim to improve the environmental performance of water supply construction projects. Understanding which indicators are most effective allows for targeted improvements, helping to minimize negative environmental impacts and ensuring sustainable practices. Finally, this study is a pioneer in examining the critical PIs for assessing EMP implementation in water supply construction projects.
- 3 November 2023
- Published by Springer Nature
- p. 549-558
Sustainable Transportation Indicators for Urban Areas: A Systematic Review
- 3 November 2023
- Published by Springer Nature
- p. 549-558
Sustainable Transportation Indicators for Urban Areas: A Systematic Review