Yuriy Varfolomeev
Research Subjects
Yuriy Varfolomeev has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
National Transport University
3 shared publications- Andrii Koval
Faculty of Automotive and Mechanical Engineering, National Transport University, M. Omelianovicha-Pavlenka, 1, 01010 Kiev, Ukraine
2 shared publications - Valentyn Moroz2 shared publications
- Volodymyr Musiiko
Ukraina, 01010, Kyiv, M
2 shared publications - Mykola Biliakovych1 shared publication
- Mykola Lykhostup1 shared publication
Latest Publications
- Open Access
- 1 January 2023
- Published by National Transport University in Automobile Roads and Road Construction
- No. 114.1,p. 151-159
PLANETARY GEARS DYNAMIC MODEL OF ROAD MACHINE DRIVES FOR CALCULATING FORCED VIBRATIONS
- 1 January 2023
- Published by National Transport University in Automobile Roads and Road Construction
- No. 114.1,p. 151-159
Open AccessPLANETARY GEARS DYNAMIC MODEL OF ROAD MACHINE DRIVES FOR CALCULATING FORCED VIBRATIONS
- 1 January 2023
- Published by National Transport University in Automobile Roads and Road Construction
- No. 113.1
TECHNOLOGICAL EQUIPMENT FOR PERFORMING SELECTIVE CAPITAL REPAIR OF PIPELINES
The article provides an analysis of the technical condition of main pipelines and technologies for performing selective overhaul of their linear part. Known technological schemes for performing selective repair of pipelines do not provide for effective soil compaction after its completion due to the lack of technical means for effective and uniform soil compaction. The lack of compaction of the soil under the repaired pipeline leads to its uncontrolled subsidence relative to the line of original laying, which can cause an emergency situation. In order to ensure high-quality, fast and safe execution of the entire complex of earthworks during the selective overhaul of main pipelines with one excavator, a research and industrial universal set of interchangeable work equipment for a single-bucket crawler excavator weighing 20 tons has been designed, manufactured and tested. The set of replacement equipment consists of digging equipment, compaction equipment, a bucket for performing earthworks during the opening of the pipeline and filling the soil in the trench, a universal grip for attaching the replacement equipment to the handle of a single-bucket excavator, a system for positioning and monitoring the position of the replacement equipment relative to the pipe. Technology for implementation of earth-moving works at capital repair of linear portion of main pipelines and complex of technological equipment for its realization are patented in Ukraine. The productivity of digging equipment is 35...55 m3/h, the productivity of compacting equipment is 35...45 m/h. The use of a set of equipment allows one excavator to perform the entire complex of earthworks during the selective capital repair of main gas pipelines with a diameter of 530...1420 mm.
- 1 January 2023
- Published by National Transport University in Automobile Roads and Road Construction
- No. 113.1
TECHNOLOGICAL EQUIPMENT FOR PERFORMING SELECTIVE CAPITAL REPAIR OF PIPELINES
The article provides an analysis of the technical condition of main pipelines and technologies for performing selective overhaul of their linear part. Known technological schemes for performing selective repair of pipelines do not provide for effective soil compaction after its completion due to the lack of technical means for effective and uniform soil compaction. The lack of compaction of the soil under the repaired pipeline leads to its uncontrolled subsidence relative to the line of original laying, which can cause an emergency situation. In order to ensure high-quality, fast and safe execution of the entire complex of earthworks during the selective overhaul of main pipelines with one excavator, a research and industrial universal set of interchangeable work equipment for a single-bucket crawler excavator weighing 20 tons has been designed, manufactured and tested. The set of replacement equipment consists of digging equipment, compaction equipment, a bucket for performing earthworks during the opening of the pipeline and filling the soil in the trench, a universal grip for attaching the replacement equipment to the handle of a single-bucket excavator, a system for positioning and monitoring the position of the replacement equipment relative to the pipe. Technology for implementation of earth-moving works at capital repair of linear portion of main pipelines and complex of technological equipment for its realization are patented in Ukraine. The productivity of digging equipment is 35...55 m3/h, the productivity of compacting equipment is 35...45 m/h. The use of a set of equipment allows one excavator to perform the entire complex of earthworks during the selective capital repair of main gas pipelines with a diameter of 530...1420 mm.
- 1 January 2022
- Published by National Transport University in The National Transport University Bulletin
- Vol. 1 (51)
DETERMINATION OF THE POWER LOAD FOR THE SKID OF THE MULTIPURPOSE EARTHMOVING MACHINE’S ROTARY IMPLEMENT
This article is concerned with the physical substance of the interaction between the skid of the multipurpose earthmoving machines implement and the surface of the soil excavation and experimental determination of the power load parameters of the skid as a factor that ensures the cource stability of the machine during the excavation process. Study object: process of the power loading of the skid in the rotary implement of the multipurpose earthmoving machine. Objective: determination of the physical substance and values of the power load parameters for the skid in the rotary implement of the multipurpose earthmoving machine. Method – the experiment on the physical model of the implement. The experimental determination of the value and beavior of the power load on the skid of the machine’s implement during excavation in the mode of reciprocating approach in the absence of proven calculation methods should be concider the only way to evaluate the load on perticular assembly as well as on the machine as a whole. This is necessary for power balance evaluation for the machine that works in the soil excavation mode and for the determination of the course stability of the machine During the study we have concluded that the values of the skid power load components (longitudal, transverse, vertical) are mainly determined by forming and movement of the soil traction prism that spills to the bottom of the excavation during digging. To the outmost this effect manifests near the walls of the excavation that causes the plated shape of the skid bearing surface which ensures it’s ‘emersion’ above the prism of the spilled soil. We have determined the dependancy of the skid load forces from kinematic characteristics of the implements translation modes during excavation. The consistent pattern that we have detected allows to minimize the power load of the skid by tweaking the duration of the implements additional turn at the end of each half-cycle which leads to the increase of the course stability during creation of the of the wide excavations.
- 1 January 2022
- Published by National Transport University in The National Transport University Bulletin
- Vol. 1 (51)
DETERMINATION OF THE POWER LOAD FOR THE SKID OF THE MULTIPURPOSE EARTHMOVING MACHINE’S ROTARY IMPLEMENT
This article is concerned with the physical substance of the interaction between the skid of the multipurpose earthmoving machines implement and the surface of the soil excavation and experimental determination of the power load parameters of the skid as a factor that ensures the cource stability of the machine during the excavation process. Study object: process of the power loading of the skid in the rotary implement of the multipurpose earthmoving machine. Objective: determination of the physical substance and values of the power load parameters for the skid in the rotary implement of the multipurpose earthmoving machine. Method – the experiment on the physical model of the implement. The experimental determination of the value and beavior of the power load on the skid of the machine’s implement during excavation in the mode of reciprocating approach in the absence of proven calculation methods should be concider the only way to evaluate the load on perticular assembly as well as on the machine as a whole. This is necessary for power balance evaluation for the machine that works in the soil excavation mode and for the determination of the course stability of the machine During the study we have concluded that the values of the skid power load components (longitudal, transverse, vertical) are mainly determined by forming and movement of the soil traction prism that spills to the bottom of the excavation during digging. To the outmost this effect manifests near the walls of the excavation that causes the plated shape of the skid bearing surface which ensures it’s ‘emersion’ above the prism of the spilled soil. We have determined the dependancy of the skid load forces from kinematic characteristics of the implements translation modes during excavation. The consistent pattern that we have detected allows to minimize the power load of the skid by tweaking the duration of the implements additional turn at the end of each half-cycle which leads to the increase of the course stability during creation of the of the wide excavations.
- 1 February 2021
- Published by National Transport University in Automobile Roads and Road Construction
- No. 109
DETERMINATION OF THE RATIONAL LEVEL OF MECHANIZATION OF ROAD PRODUCTION
The constant aspiration of a person to replace manual labor with the work of machines and mechanisms is reproduced in such concepts as "mechanization", "automation", "machine-tool" and others. In the construction industry, the most common and most favorable for the disclosure of this desire is an indicator of the level of mechanization. But in the techniques and recommendations that provide advice on the definition of this indicator, its calculation is carried out using generalizations of mechanization of labor without giving any clear representations as to the determination of production volumes in a purely mechanized way.The article reveals the essence of the indicator of the level of mechanization of road production, which determines the expediency of improving the structure of the main production assets of the enterprise for the implementation of such a program of work, which would contribute to maximizing profits. In general, the definition of the rational level of mechanization is based on the implementation of an iterative algorithm, which includes a number of stages.Thus, at the first stage, the initial (basic) program of a road organization is determined using data on the quantity and quality of the main production assets and the usual program of work for this enterprise. Determining the structure of this program, consisting of a number of road works and labor processes, in turn, is carried out using the developed algorithm, which involves the maximum technological use of all types of resources, including technical, which contribute to the mechanized mode of work. Next, using the data on the structure of the works, it is possible to obtain the estimated value of profit that can be obtained as a result of the implementation of the initial program of work. On the basis of the information about the estimated value of profit formed part of it in the form of a production development fund. The size of the fund for the development of production is the basis for reforming the machine park of the road organization. Options for changing the quantitative and qualitative composition of the machine park include the steps to assess their residual value, the purchase of new machines, major repairs or replacement of existing units of equipment. Using the data of various variants of the modernization of the park of machines and mechanisms, the corresponding changes for working hours for them are determined for the year, that is, the initial annual of working time is recalculated. The updated information on annual working time funds is used to determine the appropriate modifications to the park of machines of the work program of the road organization. For each option of updated programs of work determined by the calculated profit, and its maximum value is approved rational program of work. At the last stage, using data on total costs of manual and mechanized labor, as well as data on the total number of performers, indicators are calculated that characterize the level of mechanization of a road enterprise. The obtained indicators, as characteristics of the level of mechanization, can be used to solve various tasks in the field of road production management.
- 1 February 2021
- Published by National Transport University in Automobile Roads and Road Construction
- No. 109
DETERMINATION OF THE RATIONAL LEVEL OF MECHANIZATION OF ROAD PRODUCTION
The constant aspiration of a person to replace manual labor with the work of machines and mechanisms is reproduced in such concepts as "mechanization", "automation", "machine-tool" and others. In the construction industry, the most common and most favorable for the disclosure of this desire is an indicator of the level of mechanization. But in the techniques and recommendations that provide advice on the definition of this indicator, its calculation is carried out using generalizations of mechanization of labor without giving any clear representations as to the determination of production volumes in a purely mechanized way.The article reveals the essence of the indicator of the level of mechanization of road production, which determines the expediency of improving the structure of the main production assets of the enterprise for the implementation of such a program of work, which would contribute to maximizing profits. In general, the definition of the rational level of mechanization is based on the implementation of an iterative algorithm, which includes a number of stages.Thus, at the first stage, the initial (basic) program of a road organization is determined using data on the quantity and quality of the main production assets and the usual program of work for this enterprise. Determining the structure of this program, consisting of a number of road works and labor processes, in turn, is carried out using the developed algorithm, which involves the maximum technological use of all types of resources, including technical, which contribute to the mechanized mode of work. Next, using the data on the structure of the works, it is possible to obtain the estimated value of profit that can be obtained as a result of the implementation of the initial program of work. On the basis of the information about the estimated value of profit formed part of it in the form of a production development fund. The size of the fund for the development of production is the basis for reforming the machine park of the road organization. Options for changing the quantitative and qualitative composition of the machine park include the steps to assess their residual value, the purchase of new machines, major repairs or replacement of existing units of equipment. Using the data of various variants of the modernization of the park of machines and mechanisms, the corresponding changes for working hours for them are determined for the year, that is, the initial annual of working time is recalculated. The updated information on annual working time funds is used to determine the appropriate modifications to the park of machines of the work program of the road organization. For each option of updated programs of work determined by the calculated profit, and its maximum value is approved rational program of work. At the last stage, using data on total costs of manual and mechanized labor, as well as data on the total number of performers, indicators are calculated that characterize the level of mechanization of a road enterprise. The obtained indicators, as characteristics of the level of mechanization, can be used to solve various tasks in the field of road production management.