Gledson Brito Miranda
Research Subjects
Gledson Brito Miranda has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Bruno Rafael Dias de Lucena
Universidade federal do Pará
3 shared publications - Bruno Rodrigues dos Santos
Universidade federal do Pará
1 shared publication - Marinalva Cardoso Maciel
Universidade federal do Pará
1 shared publication - Otávio Luiz de Castro Romano Junior
Universidade Federal do Pará Programa de Pós-Graduação em Administração - PPGAD/UFPA
1 shared publication - Shahid Rasheed
Ministry of Science and Technology of Pakistan
1 shared publication
Latest Publications
- Open Access
- 4 April 2026
- Published by Universidade Federal da Bahia in Revista Interdisciplinar de Gestão Social
- Vol. 11 (2)
O DESAFIO DAS ORGANIZAÇÕES DA SOCIEDADE CIVIL AMAZÔNICAS NO PERÍODO PÓS-PANDEMIA COVID-19: LIÇÕES DE ONTEM E DE HOJE
A pandemia COVID-19, chegada ao Brasil em 2020, causa uma paralisação nas atividades que não dispensou as organizações do terceiro setor. Na região amazônica brasileira, com suas grandes distâncias e sua parca infraestrutura de comunicação, os efeitos da crise foram fortemente sentidos. Esse artigo se propõe a reconhecer o papel das OSCs durante a pandemia, especialmente em contexto amazônico, compreender e fornecer insights para o futuro. Foi realizada uma survey, com uma amostra de 54 organizações, e seus resultados foram analisados com base na revisão realizada. Dentre os principais resultados verifica-se que 85% das organizações tiveram suas atividades muito afetadas pela crise, 78% delas não identificam políticas públicas de apoio ao setor e 89% tiveram suas captações de recursos muito afetadas. Observa-se que OSCs pesquisadas não estavam preparadas para o retorno pós-pandemia, refletindo uma realidade regional, no entanto sua disposição em aproveitar as oportunidades pode ser o estímulo para a atuação no novo normal.
- 4 April 2026
- Published by Universidade Federal da Bahia in Revista Interdisciplinar de Gestão Social
- Vol. 11 (2)
Open AccessO DESAFIO DAS ORGANIZAÇÕES DA SOCIEDADE CIVIL AMAZÔNICAS NO PERÍODO PÓS-PANDEMIA COVID-19: LIÇÕES DE ONTEM E DE HOJE
A pandemia COVID-19, chegada ao Brasil em 2020, causa uma paralisação nas atividades que não dispensou as organizações do terceiro setor. Na região amazônica brasileira, com suas grandes distâncias e sua parca infraestrutura de comunicação, os efeitos da crise foram fortemente sentidos. Esse artigo se propõe a reconhecer o papel das OSCs durante a pandemia, especialmente em contexto amazônico, compreender e fornecer insights para o futuro. Foi realizada uma survey, com uma amostra de 54 organizações, e seus resultados foram analisados com base na revisão realizada. Dentre os principais resultados verifica-se que 85% das organizações tiveram suas atividades muito afetadas pela crise, 78% delas não identificam políticas públicas de apoio ao setor e 89% tiveram suas captações de recursos muito afetadas. Observa-se que OSCs pesquisadas não estavam preparadas para o retorno pós-pandemia, refletindo uma realidade regional, no entanto sua disposição em aproveitar as oportunidades pode ser o estímulo para a atuação no novo normal.
- Open Access
- 31 January 2022
- Published by Revista Produção e Desenvolvimento in Revista Produção e Desenvolvimento
- Vol. 8 (1) , e557
Decision approach for program risk analysis and management: a case study
- 31 January 2022
- Published by Revista Produção e Desenvolvimento in Revista Produção e Desenvolvimento
- Vol. 8 (1) , e557
Open AccessDecision approach for program risk analysis and management: a case study
- Open Access
- 1 January 2021
- Published by Servico Nacional de Aprendizagem Comercial / SENAC SC in Navus - Revista de Gestão e Tecnologia
- Vol. 11, 01-19
Effects of Time Overestimation on Effective Tasks Duration: an analysis in the light of the Critical Chain
The Critical Chain (CC/PM) is a method for schedule management that considers the influences of behavioral effects in the execution of tasks. The literature has a gap in the empirical evidence of these effects. The purpose of this article is to test the hypothesis that planned durations of tasks without built-in security, cause shorter effective durations, according to the premises of the method. Using an experimental approach, two groups of university students were observed: the control group, with no stipulated deadline for carrying out the task, and the experimental group, with a stipulated deadline, starting from the median of the control group. Data on duration and quality of tasks were obtained and analyzed statistically. CC/PM is recognized worldwide, and its premises are applied as true, however, researchers of this method do not point out experiments that empirically prove their fundamentals. This article addresses gaps in behavioral effects caused by adding additional time to task planning. The hypothesis that planned tasks without built-in security have shorter average effective durations was confirmed. The experimental group had an average duration significantly less than that of the control group, without, however, affecting the quality of the task result. The findings corroborate the premise that deadline estimates without built-in security reduce the behavioral effects on task performers. Showing that a common practice of planners, the insertion of excessive times in their plans, generates deliveries in longer times than they could if there was no built-in security.
- 1 January 2021
- Published by Servico Nacional de Aprendizagem Comercial / SENAC SC in Navus - Revista de Gestão e Tecnologia
- Vol. 11, 01-19
Open AccessEffects of Time Overestimation on Effective Tasks Duration: an analysis in the light of the Critical Chain
The Critical Chain (CC/PM) is a method for schedule management that considers the influences of behavioral effects in the execution of tasks. The literature has a gap in the empirical evidence of these effects. The purpose of this article is to test the hypothesis that planned durations of tasks without built-in security, cause shorter effective durations, according to the premises of the method. Using an experimental approach, two groups of university students were observed: the control group, with no stipulated deadline for carrying out the task, and the experimental group, with a stipulated deadline, starting from the median of the control group. Data on duration and quality of tasks were obtained and analyzed statistically. CC/PM is recognized worldwide, and its premises are applied as true, however, researchers of this method do not point out experiments that empirically prove their fundamentals. This article addresses gaps in behavioral effects caused by adding additional time to task planning. The hypothesis that planned tasks without built-in security have shorter average effective durations was confirmed. The experimental group had an average duration significantly less than that of the control group, without, however, affecting the quality of the task result. The findings corroborate the premise that deadline estimates without built-in security reduce the behavioral effects on task performers. Showing that a common practice of planners, the insertion of excessive times in their plans, generates deliveries in longer times than they could if there was no built-in security.