Lukas Heußner
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Lukas Heußner has a total of 34 co-authors. Here are the top co-authors by number of shared publications:
- Günther Meschke
Ruhr University Bochum
3 shared publications - Markus König
Ruhr University Bochum
3 shared publications - Peter Mark
Institute of Concrete Structures, Faculty of Civil and Environmental Engineering Ruhr University Bochum Bochum Germany
3 shared publications - Steffen Freitag
Karlsruhe Institute of Technology
3 shared publications - Annika Jodehl
Ruhr-Universität Bochum
2 shared publications - Ba Trung Cao
Institute for Structural Mechanics Ruhr University Bochum Universitätsstraße 150 44801 Bochum Germany
2 shared publications
Latest Publications
- 31 August 2025
- Published by Wiley in Beton- und Stahlbetonbau
- Vol. 121 (2) , 138-150
Kompensation von vertikalen Temperaturgradienten an Brücken durch Temperaturinduktion
Abstrakt: Klimatische Einflüsse führen zu instationären Temperaturfeldern in Brücken. Der linear veränderliche, vertikale Temperaturanteil erzeugt in statisch unbestimmt gelagerten Tragwerken Zwangsschnittgrößen in Form von Biegemomenten. Im Sommer bspw. können diese so groß wie die Belastungen aus Verkehr werden. Eine lokale Temperaturinduktion kann dies reduzieren. Dazu wird die Bodenplatte geheizt und die Fahrbahnplatte gekühlt – bzw. umgekehrt. Dies induziert einen invertierten Gradienten und kompensiert äußere Temperaturbeanspruchungen. Eine Methode zur Temperierung von Querschnitten wurde zunächst an einem Demonstrator einer Spannbetonbrücke mit Hohlkastenquerschnitt im Maßstab von 1:2 entwickelt und dann am realen Bauwerk umgesetzt. Mittels Heizmatten und Wasserkühlung wurde die Temperaturinduktion im Inneren des Hohlkastens realisiert. Intern verbaute Thermoelemente messen die Temperaturausbreitung und validieren die Ergebnisse einer numerischen Vergleichsrechnung des instationären Temperaturfelds. Die Ergebnisse zeigen, dass der Temperaturgradient durch Kühlen mit ca. –30 W/m 2 und Heizen mit ca. 90 W/m 2 um –8,4 K verändert werden kann. Die Übertragung des Systems auf eine Spannbetonbrücke belegt die Wirksamkeit unter ambienten thermischen Randbedingungen. An dieser wurde allein durch Heizen der Bodenplatte mit 37 W/m 2 der Gradient um ca. –2,0 K über einen Zeitraum von 38 h verändert.
- 31 August 2025
- Published by Wiley in Beton- und Stahlbetonbau
- Vol. 121 (2) , 138-150
Kompensation von vertikalen Temperaturgradienten an Brücken durch Temperaturinduktion
Abstrakt: Klimatische Einflüsse führen zu instationären Temperaturfeldern in Brücken. Der linear veränderliche, vertikale Temperaturanteil erzeugt in statisch unbestimmt gelagerten Tragwerken Zwangsschnittgrößen in Form von Biegemomenten. Im Sommer bspw. können diese so groß wie die Belastungen aus Verkehr werden. Eine lokale Temperaturinduktion kann dies reduzieren. Dazu wird die Bodenplatte geheizt und die Fahrbahnplatte gekühlt – bzw. umgekehrt. Dies induziert einen invertierten Gradienten und kompensiert äußere Temperaturbeanspruchungen. Eine Methode zur Temperierung von Querschnitten wurde zunächst an einem Demonstrator einer Spannbetonbrücke mit Hohlkastenquerschnitt im Maßstab von 1:2 entwickelt und dann am realen Bauwerk umgesetzt. Mittels Heizmatten und Wasserkühlung wurde die Temperaturinduktion im Inneren des Hohlkastens realisiert. Intern verbaute Thermoelemente messen die Temperaturausbreitung und validieren die Ergebnisse einer numerischen Vergleichsrechnung des instationären Temperaturfelds. Die Ergebnisse zeigen, dass der Temperaturgradient durch Kühlen mit ca. –30 W/m 2 und Heizen mit ca. 90 W/m 2 um –8,4 K verändert werden kann. Die Übertragung des Systems auf eine Spannbetonbrücke belegt die Wirksamkeit unter ambienten thermischen Randbedingungen. An dieser wurde allein durch Heizen der Bodenplatte mit 37 W/m 2 der Gradient um ca. –2,0 K über einen Zeitraum von 38 h verändert.
- Open Access
- 18 March 2023
- Published by Springer Nature
- p. 405-463
Real-Time Simulation for Steering the Tunnel Construction Process
Currently, in mechanized tunneling, the steering of tunnel boring machines (TBM) in practice is mainly decided based on engineering expert knowledge and recorded monitoring data. In this chapter, a new concept of exploiting the advantages of simulation models to support the steering phase is presented, which allows optimizing the construction process. With the aim to support the steering decision during tunnel construction by means of real-time simulations, predictive simulation models are established in the initial planning phase of a tunnel project. The models are then capable of being continuously updated with monitoring data during the construction. The chapter focuses on explaining models for real-time predictions of logistics processes and tunneling induced settlements as well as the risk of building damage in more details. Additionally, application examples, which are practical-oriented, are also presented to illustrate the applicability of the proposed concept.
- 18 March 2023
- Published by Springer Nature
- p. 405-463
Open AccessReal-Time Simulation for Steering the Tunnel Construction Process
Currently, in mechanized tunneling, the steering of tunnel boring machines (TBM) in practice is mainly decided based on engineering expert knowledge and recorded monitoring data. In this chapter, a new concept of exploiting the advantages of simulation models to support the steering phase is presented, which allows optimizing the construction process. With the aim to support the steering decision during tunnel construction by means of real-time simulations, predictive simulation models are established in the initial planning phase of a tunnel project. The models are then capable of being continuously updated with monitoring data during the construction. The chapter focuses on explaining models for real-time predictions of logistics processes and tunneling induced settlements as well as the risk of building damage in more details. Additionally, application examples, which are practical-oriented, are also presented to illustrate the applicability of the proposed concept.
- Open Access
- 18 March 2023
- Published by Springer Nature
- p. 329-404
Digital Design in Mechanized Tunneling
Digital design methods are constantly improving the planning procedure in tunnel construction. This development includes the implementation of rule-based systems, concepts for cross-document and -model data integration, and new evaluation concepts that exploit the possibilities of digital design. For planning in tunnel construction and alignment selection, integrated planning environments are created, which help in decision-making through interactive use. By integrating room-ware products, such as touch tables and virtual reality devices, collaborative approaches are also considered, in which decision-makers can be directly involved in the planning process. In current tunneling practice and during planning stage, Finite Element (FE) simulations form an integral element in the planning and the design phase of mechanized tunneling projects. The generation of adequate computational models is often time consuming and requires data from many different sources. Incorporating Building Information Modeling (BIM) concepts offers opportunities to simplify this process by using geometrical BIM sub-models as a basis for structural analyses. In the following chapter, some modern possibilities of digital planning and evaluation of alignments in tunnel construction are explained in more detail. Furthermore, the conception and implementation of an interactive BIM and GIS integrated planning system, ‘‘BIM-to-FEM’’ technology which automatically extracts relevant information needed for FE simulations from BIM sub-models, the establishment of surrogate models for real-time predictions, as well as the evaluation and comparison of planning variants are presented.
- 18 March 2023
- Published by Springer Nature
- p. 329-404
Open AccessDigital Design in Mechanized Tunneling
Digital design methods are constantly improving the planning procedure in tunnel construction. This development includes the implementation of rule-based systems, concepts for cross-document and -model data integration, and new evaluation concepts that exploit the possibilities of digital design. For planning in tunnel construction and alignment selection, integrated planning environments are created, which help in decision-making through interactive use. By integrating room-ware products, such as touch tables and virtual reality devices, collaborative approaches are also considered, in which decision-makers can be directly involved in the planning process. In current tunneling practice and during planning stage, Finite Element (FE) simulations form an integral element in the planning and the design phase of mechanized tunneling projects. The generation of adequate computational models is often time consuming and requires data from many different sources. Incorporating Building Information Modeling (BIM) concepts offers opportunities to simplify this process by using geometrical BIM sub-models as a basis for structural analyses. In the following chapter, some modern possibilities of digital planning and evaluation of alignments in tunnel construction are explained in more detail. Furthermore, the conception and implementation of an interactive BIM and GIS integrated planning system, ‘‘BIM-to-FEM’’ technology which automatically extracts relevant information needed for FE simulations from BIM sub-models, the establishment of surrogate models for real-time predictions, as well as the evaluation and comparison of planning variants are presented.
- Open Access
- 18 March 2023
- Published by Springer Nature
- p. 9-91
Advance Reconnaissance and Optimal Monitoring
Effective exploration techniques during mechanized tunneling are of high importance in order to prevent severe surface settlements as well as a damage of the tunnel boring machine, which in turn would lead to additional costs and a standstill in the construction process. A seismic methodology called full waveform inversion can bring a considerable improvement compared to state-of-the-art seismic methods in terms of precision. Another method of exploration during mechanized tunneling is to continuously monitor subsurface behavior and then use this data to identify disturbances through pattern recognition and machine learning techniques. Various probabilistic methods for conducting system identification and proposing an appropriate monitoring plan are developed in this regard. Furthermore, ground conditions can be determined by studying boring machine data collected during the excavation. The active and passive obtained data during performance of a shield driven machine were used to estimate soil parameters. The monitoring campaign can be extended to include above-ground structural surveillance as well as terrestrial and satellite data to track displacements of existing infrastructure caused by tunneling. The available radar data for the Wehrhahn-line project are displayed and were utilized to precisely monitor the process of anticipated uplift by injections and any subsequent ground building settlements.
- 18 March 2023
- Published by Springer Nature
- p. 9-91
Open AccessAdvance Reconnaissance and Optimal Monitoring
Effective exploration techniques during mechanized tunneling are of high importance in order to prevent severe surface settlements as well as a damage of the tunnel boring machine, which in turn would lead to additional costs and a standstill in the construction process. A seismic methodology called full waveform inversion can bring a considerable improvement compared to state-of-the-art seismic methods in terms of precision. Another method of exploration during mechanized tunneling is to continuously monitor subsurface behavior and then use this data to identify disturbances through pattern recognition and machine learning techniques. Various probabilistic methods for conducting system identification and proposing an appropriate monitoring plan are developed in this regard. Furthermore, ground conditions can be determined by studying boring machine data collected during the excavation. The active and passive obtained data during performance of a shield driven machine were used to estimate soil parameters. The monitoring campaign can be extended to include above-ground structural surveillance as well as terrestrial and satellite data to track displacements of existing infrastructure caused by tunneling. The available radar data for the Wehrhahn-line project are displayed and were utilized to precisely monitor the process of anticipated uplift by injections and any subsequent ground building settlements.
- 1 March 2022
- Published by American Society of Civil Engineers (ASCE) in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
- Vol. 8 (1) , 04021069
Real-Time Risk Assessment of Tunneling-Induced Building Damage Considering Polymorphic Uncertainty
The risk assessment of tunneling-induced damage in buildings is a challenging task in geotechnical and structural engineering. It is important to consider the soil–structure interaction during the tunnel construction process. In this paper, finite-element (FE) simulation models of mechanized tunneling processes are combined with FE models of buildings to predict tunneling-induced damage. The soil–structure interaction is taken into account by considering the building stiffness in the tunneling process simulation model and by applying the computed foundation settlements as boundary conditions of the building model. The building damage risk is assessed by means of strains in the structural members and a corresponding category of damage is determined. Uncertainties of the geotechnical parameters and the structural parameters are quantified as random variables and intervals in the framework of polymorphic uncertainty modeling. For real-time predictions, the FE simulation models are approximated by artificial neural networks. This makes it possible to predict the structural damage risk according to scenarios of the operational tunneling process parameters in order to assist machine drivers during tunnel construction.
- 1 March 2022
- Published by American Society of Civil Engineers (ASCE) in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
- Vol. 8 (1) , 04021069
Real-Time Risk Assessment of Tunneling-Induced Building Damage Considering Polymorphic Uncertainty
The risk assessment of tunneling-induced damage in buildings is a challenging task in geotechnical and structural engineering. It is important to consider the soil–structure interaction during the tunnel construction process. In this paper, finite-element (FE) simulation models of mechanized tunneling processes are combined with FE models of buildings to predict tunneling-induced damage. The soil–structure interaction is taken into account by considering the building stiffness in the tunneling process simulation model and by applying the computed foundation settlements as boundary conditions of the building model. The building damage risk is assessed by means of strains in the structural members and a corresponding category of damage is determined. Uncertainties of the geotechnical parameters and the structural parameters are quantified as random variables and intervals in the framework of polymorphic uncertainty modeling. For real-time predictions, the FE simulation models are approximated by artificial neural networks. This makes it possible to predict the structural damage risk according to scenarios of the operational tunneling process parameters in order to assist machine drivers during tunnel construction.