Daniel Tran
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Daniel Tran has a total of 26 co-authors. Here are the top co-authors by number of shared publications:
- Long Duy Nguyen
Florida Gulf Coast Univ
6 shared publications - Mamdouh Mohamed
Department of Civil and Architectural Engineering, Lawrence Technological University, Southfield, MI
5 shared publications - Nhien Dinh Le
Department of Civil, Environmental and Architectural Engineering, University of Kansas, Lawrence, KS
4 shared publications - Brian Lines
University of Kansas
2 shared publications - Keith R. Molenaar
Professor, Dept. of Civil, Environmental and Architectural Engineering, Univ. of Colorado, 428 UCB, 1111 Engineering Dr., Boulder, CO 80309-0428. ORCID:
2 shared publications - Phuong Hoang Dat Nguyen
South Dakota State Univ
2 shared publications
Latest Publications
- 26 February 2026
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680  (9) , 307-323
Systematic Analysis of Quality Management for Highway Projects Delivered Using Alternative Contracting Methods
Quality control (QC) and quality assurance (QA) processes are essential to the success of highway infrastructure projects but vary between alternative contracting methods (ACMs), including design-build (D-B), construction manager/general contractor (CM/GC), public–private partnership (P3), and progressive design-build (P-D-B). State departments of transportation (DOTs) tailor QA and QC processes to individual ACM projects, yet these documents and processes are frequently scattered and unassessed. Specifically, there is little research examining how variations in QA and QC processes across ACMs affect project outcomes. In this study, trends and lessons learned from QA and QC implementation of individual highway design and construction projects are evaluated through a systematic review and content analysis. Data were collected from solicitation and contract documents of 91 ACM projects (51 D-B, 15 CM/GC, 13 P3, 12 P-D-B) from 27 states and 21 manuals, guidance, and research reports, including requests for proposals, requests for qualification, contracts, and statement of qualification checklists. The frequency and context of key terms related to quality management revealed patterns in how QA and QC requirements are defined and implemented across project types and delivery methods. It is found that a structured QA and QC process is essential for enhancing the success and reliability of highway projects delivered using four ACMs (D-B, CM/GC, P-D-B, P3). Additionally, for P-D-B projects, combining qualifications-based shortlisting and best-value determination is effective for selecting highly qualified teams and can be applied for less-mature state DOTs adopting P-D-B. This approach is valuable for state DOTs with less experience in implementing ACMs, as it offers a practical pathway for ensuring project quality and team capability early in the quality management process. These findings contribute to advancing QA and QC practices in ACMs by offering actionable insights that support more informed decision-making, standardization efforts, and the development of tailored quality management strategies aligned with agency experience levels.
- 26 February 2026
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680  (9) , 307-323
Systematic Analysis of Quality Management for Highway Projects Delivered Using Alternative Contracting Methods
Quality control (QC) and quality assurance (QA) processes are essential to the success of highway infrastructure projects but vary between alternative contracting methods (ACMs), including design-build (D-B), construction manager/general contractor (CM/GC), public–private partnership (P3), and progressive design-build (P-D-B). State departments of transportation (DOTs) tailor QA and QC processes to individual ACM projects, yet these documents and processes are frequently scattered and unassessed. Specifically, there is little research examining how variations in QA and QC processes across ACMs affect project outcomes. In this study, trends and lessons learned from QA and QC implementation of individual highway design and construction projects are evaluated through a systematic review and content analysis. Data were collected from solicitation and contract documents of 91 ACM projects (51 D-B, 15 CM/GC, 13 P3, 12 P-D-B) from 27 states and 21 manuals, guidance, and research reports, including requests for proposals, requests for qualification, contracts, and statement of qualification checklists. The frequency and context of key terms related to quality management revealed patterns in how QA and QC requirements are defined and implemented across project types and delivery methods. It is found that a structured QA and QC process is essential for enhancing the success and reliability of highway projects delivered using four ACMs (D-B, CM/GC, P-D-B, P3). Additionally, for P-D-B projects, combining qualifications-based shortlisting and best-value determination is effective for selecting highly qualified teams and can be applied for less-mature state DOTs adopting P-D-B. This approach is valuable for state DOTs with less experience in implementing ACMs, as it offers a practical pathway for ensuring project quality and team capability early in the quality management process. These findings contribute to advancing QA and QC practices in ACMs by offering actionable insights that support more informed decision-making, standardization efforts, and the development of tailored quality management strategies aligned with agency experience levels.
- 30 September 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (3) , 667-679
Development of Risk-Based Methodologies for Highway Pavement Construction Inspection
Construction inspection plays a critical role in Portland cement concrete pavement (PCCP) and hot mix asphalt (HMA) pavement projects. To ensure the quality of pavement projects, state departments of transportation (DOTs) in the U.S. typically conduct construction material tests and inspect workmanship processes using quality assurance (QA) programs. Given today’s reality of reduced QA inspection resources such as funding, staff ability, and availability, several state DOTs have used a risk-based inspection (RBI) approach to optimize their QA processes. A thorough review of existing literature revealed limited studies examining RBI methodologies in highway pavement construction projects. The aim of this study is to investigate the use of RBI for pavement construction projects. It employed a triangulation research methodology, including an extensive literature review, a survey questionnaire of 50 state DOTs, focus groups, and a vetting workshop. A list of 16 core items in field inspection for both PCCP and HMA pavement projects was developed and verified. A generic risk rating of these critical inspection activities was determined. Additionally, inspection frequency, documentation effort, and inspector experience associated with these critical inspection activities identified through focus groups and the vetting workshop served as a reference point when conducting RBI for PCCP and HMA pavement projects. This study contributes to the body of knowledge and the highway construction industry by identifying and prioritizing 16 core inspection items for PCCP and HMA pavement construction. Construction project managers and inspectors may benefit from this study by analyzing the risks of core inspection items and implementing appropriate risk mitigation plans.
- 30 September 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (3) , 667-679
Development of Risk-Based Methodologies for Highway Pavement Construction Inspection
Construction inspection plays a critical role in Portland cement concrete pavement (PCCP) and hot mix asphalt (HMA) pavement projects. To ensure the quality of pavement projects, state departments of transportation (DOTs) in the U.S. typically conduct construction material tests and inspect workmanship processes using quality assurance (QA) programs. Given today’s reality of reduced QA inspection resources such as funding, staff ability, and availability, several state DOTs have used a risk-based inspection (RBI) approach to optimize their QA processes. A thorough review of existing literature revealed limited studies examining RBI methodologies in highway pavement construction projects. The aim of this study is to investigate the use of RBI for pavement construction projects. It employed a triangulation research methodology, including an extensive literature review, a survey questionnaire of 50 state DOTs, focus groups, and a vetting workshop. A list of 16 core items in field inspection for both PCCP and HMA pavement projects was developed and verified. A generic risk rating of these critical inspection activities was determined. Additionally, inspection frequency, documentation effort, and inspector experience associated with these critical inspection activities identified through focus groups and the vetting workshop served as a reference point when conducting RBI for PCCP and HMA pavement projects. This study contributes to the body of knowledge and the highway construction industry by identifying and prioritizing 16 core inspection items for PCCP and HMA pavement construction. Construction project managers and inspectors may benefit from this study by analyzing the risks of core inspection items and implementing appropriate risk mitigation plans.
- 27 July 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (2) , 123-135
Exploring Inspection Technologies for Highway Infrastructure During Construction and Asset Management
State departments of transportation (DOTs) historically employed onsite inspectors to perform hands-on and in-person infrastructure inspections. However, with the latest technological advancements, state DOTs increasingly use technologies to complement their inspection of highway infrastructure. This study investigates common technologies used by state DOTs to inspect highway infrastructure during the construction and maintenance of highway assets. A list of 19 technologies was developed from the literature review. A national survey of 50 state DOTs was conducted to determine the most common technologies used for the inspection of highway infrastructure. The top technologies used by state DOTs to inspect highway infrastructure during construction are tablet/smart mobile devices; global navigation satellite systems (GNSS)/global positioning systems (GPS); remote sensors such as accelerometers, maturity meter sensors, or strain gauges; e-ticketing; remote cameras; and unmanned aircraft systems (UAS). The top technologies used by state DOTs to inspect highway infrastructure during maintenance of assets are geographic information systems applications, light detection and ranging/3D laser scanners, tablet/smart mobile devices, GNSS/GPS, and UAS. Six case studies with Florida, Illinois, Iowa, Minnesota, New York, and Oregon state DOTs were then conducted to verify the results from the survey questionnaire. The main inspection activities and challenges of using these technologies during construction and asset management were discussed. The findings from this study provide valuable information for state DOTs to understand how better to implement technologies for the inspection of highway infrastructure.
- 27 July 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (2) , 123-135
Exploring Inspection Technologies for Highway Infrastructure During Construction and Asset Management
State departments of transportation (DOTs) historically employed onsite inspectors to perform hands-on and in-person infrastructure inspections. However, with the latest technological advancements, state DOTs increasingly use technologies to complement their inspection of highway infrastructure. This study investigates common technologies used by state DOTs to inspect highway infrastructure during the construction and maintenance of highway assets. A list of 19 technologies was developed from the literature review. A national survey of 50 state DOTs was conducted to determine the most common technologies used for the inspection of highway infrastructure. The top technologies used by state DOTs to inspect highway infrastructure during construction are tablet/smart mobile devices; global navigation satellite systems (GNSS)/global positioning systems (GPS); remote sensors such as accelerometers, maturity meter sensors, or strain gauges; e-ticketing; remote cameras; and unmanned aircraft systems (UAS). The top technologies used by state DOTs to inspect highway infrastructure during maintenance of assets are geographic information systems applications, light detection and ranging/3D laser scanners, tablet/smart mobile devices, GNSS/GPS, and UAS. Six case studies with Florida, Illinois, Iowa, Minnesota, New York, and Oregon state DOTs were then conducted to verify the results from the survey questionnaire. The main inspection activities and challenges of using these technologies during construction and asset management were discussed. The findings from this study provide valuable information for state DOTs to understand how better to implement technologies for the inspection of highway infrastructure.
- Open Access
Content Analysis of Three-Dimensional Model Technologies and Applications for Construction: Current Trends and Future Directions
The proliferation of digital technologies is substantially transforming inspection methodologies for construction activities. Although the implementation of a three-dimensional (3D) model has emerged as an advantageous, feasible inspection application, the selection of the most suitable 3D models is challenging due to multiple technology options. The primary objectives of this study were to investigate current trends and identify future technologies for 3D models in the construction industry. This study utilized systematic reviews by identifying and selecting quality journals, analyzing selected articles, and conducting content analysis and meta-analysis to identify dominant themes in 3D models. Results showed that the top technologies used to model construction projects are building information models, remote sensing, stereo vision system/photo processing programs, and augmented reality/virtual reality. The main benefits and challenges of these technologies for modeling were also determined. This study identified three areas with significant knowledge gaps for future research: (1) the amalgamation of two or more technologies to overcome project obstacles; (2) solution optimization for inspections in remote areas; and (3) the development of algorithm-based technologies. This research contributes to the body of knowledge by exploring current trends and future directions of 3D model technologies in the construction industry.
Open AccessContent Analysis of Three-Dimensional Model Technologies and Applications for Construction: Current Trends and Future Directions
The proliferation of digital technologies is substantially transforming inspection methodologies for construction activities. Although the implementation of a three-dimensional (3D) model has emerged as an advantageous, feasible inspection application, the selection of the most suitable 3D models is challenging due to multiple technology options. The primary objectives of this study were to investigate current trends and identify future technologies for 3D models in the construction industry. This study utilized systematic reviews by identifying and selecting quality journals, analyzing selected articles, and conducting content analysis and meta-analysis to identify dominant themes in 3D models. Results showed that the top technologies used to model construction projects are building information models, remote sensing, stereo vision system/photo processing programs, and augmented reality/virtual reality. The main benefits and challenges of these technologies for modeling were also determined. This study identified three areas with significant knowledge gaps for future research: (1) the amalgamation of two or more technologies to overcome project obstacles; (2) solution optimization for inspections in remote areas; and (3) the development of algorithm-based technologies. This research contributes to the body of knowledge by exploring current trends and future directions of 3D model technologies in the construction industry.
- 23 May 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2678  (12) , 1098-1109
Implementation of Progressive Design-Build in Airport Capital Construction Projects
Alternative contracting methods (ACMs) have been increasingly used for airport capital construction projects to explore the opportunity for achieving better cost and time savings than traditional design-bid-build. Progressive design-build (PDB), an emerging variation of design-build, stands out as a promising delivery method that promotes collaboration between project stakeholders. Although PDB has been successfully used across building, water/wastewater, and transit construction sectors, its implementation in the aviation industry is still limited because of legislative considerations, regulatory policies, and funding constraints. A research gap exists in systematically investigating current practices in implementing PDB in airport projects. The main objective of this study is to explore the selection criteria, implementation strategies, success factors, and lessons learned from using PDB for airport capital construction projects. This study employed a triangulation research methodology, including a comprehensive review of PDB guidance and manuals, an industry survey of 39 airports across the U.S., and structured interviews with 12 airport representatives. This study found that the top four criteria for selecting PDB are: flexibility to handle complexity, reducing claims, industry input on constructability, and cost control. The main benefits of using PDB for airport construction projects include improving project schedules, enhancing design control levels, and better management of project complexity and risks. This study contributes to the body of knowledge by providing insights into the current PDB practices for airport capital projects. Lessons learned from implementing PDB can help airport authorities and owners better administer and manage their projects.
- 23 May 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2678  (12) , 1098-1109
Implementation of Progressive Design-Build in Airport Capital Construction Projects
Alternative contracting methods (ACMs) have been increasingly used for airport capital construction projects to explore the opportunity for achieving better cost and time savings than traditional design-bid-build. Progressive design-build (PDB), an emerging variation of design-build, stands out as a promising delivery method that promotes collaboration between project stakeholders. Although PDB has been successfully used across building, water/wastewater, and transit construction sectors, its implementation in the aviation industry is still limited because of legislative considerations, regulatory policies, and funding constraints. A research gap exists in systematically investigating current practices in implementing PDB in airport projects. The main objective of this study is to explore the selection criteria, implementation strategies, success factors, and lessons learned from using PDB for airport capital construction projects. This study employed a triangulation research methodology, including a comprehensive review of PDB guidance and manuals, an industry survey of 39 airports across the U.S., and structured interviews with 12 airport representatives. This study found that the top four criteria for selecting PDB are: flexibility to handle complexity, reducing claims, industry input on constructability, and cost control. The main benefits of using PDB for airport construction projects include improving project schedules, enhancing design control levels, and better management of project complexity and risks. This study contributes to the body of knowledge by providing insights into the current PDB practices for airport capital projects. Lessons learned from implementing PDB can help airport authorities and owners better administer and manage their projects.
- 3 February 2023
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2677  (6) , 697-707
Approach for Estimating Inspection Staffing Needs for Highway Construction Projects
Construction inspectors are the primary workforce in the highway construction industry who ensure that the work on infrastructure projects meets or exceeds the quality standards set. However, there is a growing concern in state departments of transportation (DOTs) about the inspection process because of the declining availability of experienced inspectors. This study proposes an approach for estimating inspection staffing needs for highway construction projects. Data from 157 construction projects completed between 2017 and 2021 were used to evaluate project inspection staff size based on the project type, cost, and duration. A total of 35 core inspection items were identified by carrying out a content analysis of construction inspection documents. Then, a focus group of 18 experts from the Kansas DOT was conducted to verify the list of 35 cost inspection items and evaluate the number and experience of inspectors required for each item. The four project types included in the analysis are as follows: grading/surfacing; sealing; surface recycling and overlay; and bridge repair. The analysis showed that the inspection staffing needs depend on project type, duration, and size. The grading/surfacing and bridge repair projects require more inspection staff than the sealing, and surface recycling and overlay projects. The result of a Spearman’s correlation analysis indicated that there is a significant association between the risk level of an inspection item and the number and experience of inspectors required for that item. The findings from this study may help state DOTs identify their needs for inspection staff and improve the quality of highway construction projects.
- 3 February 2023
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2677  (6) , 697-707
Approach for Estimating Inspection Staffing Needs for Highway Construction Projects
Construction inspectors are the primary workforce in the highway construction industry who ensure that the work on infrastructure projects meets or exceeds the quality standards set. However, there is a growing concern in state departments of transportation (DOTs) about the inspection process because of the declining availability of experienced inspectors. This study proposes an approach for estimating inspection staffing needs for highway construction projects. Data from 157 construction projects completed between 2017 and 2021 were used to evaluate project inspection staff size based on the project type, cost, and duration. A total of 35 core inspection items were identified by carrying out a content analysis of construction inspection documents. Then, a focus group of 18 experts from the Kansas DOT was conducted to verify the list of 35 cost inspection items and evaluate the number and experience of inspectors required for each item. The four project types included in the analysis are as follows: grading/surfacing; sealing; surface recycling and overlay; and bridge repair. The analysis showed that the inspection staffing needs depend on project type, duration, and size. The grading/surfacing and bridge repair projects require more inspection staff than the sealing, and surface recycling and overlay projects. The result of a Spearman’s correlation analysis indicated that there is a significant association between the risk level of an inspection item and the number and experience of inspectors required for that item. The findings from this study may help state DOTs identify their needs for inspection staff and improve the quality of highway construction projects.
- 16 November 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2677  (5) , 390-402
Exploring the Relationships Between Project Complexity and Quality Management Approaches in Highway Construction Projects
Construction of a highway project often involves various materials that require different inspection methods. Some materials are sampled and tested, while others are accepted through a manufacturer’s certification or visual inspections. The objective of this study is to investigate how project complexity influences the selection of inspection methods for different types of materials. This study examined three main types of materials: project-produced, plant-produced, and standard manufactured materials. Data were collected from a national questionnaire survey and focus groups. Kruskal–Wallis and Spearman’s correlation tests were used to analyze data to explore the relationships between inspection methods and types of construction materials and project complexity. Three focus groups, including representatives from 11 state departments of transportation, were conducted to verify the result. This study found that sampling, testing, and visual inspection methods are significantly used to accept project-produced materials. Certification and visual inspection methods are significantly used for accepting standard manufactured materials. For accepting plant-produced materials, inspectors often use sampling and testing, certification, and visual inspection. The findings also indicated no direct relationships between project complexity and construction inspection methods. This study benefits both researchers and practitioners by examining the relationships between construction inspection methods, material production methods, and project complexity. The findings of this study uncover knowledge gaps in contemporary research related to construction material inspection and provide guidance for transportation agencies to develop inspection methods for their highway construction projects.
- 16 November 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2677  (5) , 390-402
Exploring the Relationships Between Project Complexity and Quality Management Approaches in Highway Construction Projects
Construction of a highway project often involves various materials that require different inspection methods. Some materials are sampled and tested, while others are accepted through a manufacturer’s certification or visual inspections. The objective of this study is to investigate how project complexity influences the selection of inspection methods for different types of materials. This study examined three main types of materials: project-produced, plant-produced, and standard manufactured materials. Data were collected from a national questionnaire survey and focus groups. Kruskal–Wallis and Spearman’s correlation tests were used to analyze data to explore the relationships between inspection methods and types of construction materials and project complexity. Three focus groups, including representatives from 11 state departments of transportation, were conducted to verify the result. This study found that sampling, testing, and visual inspection methods are significantly used to accept project-produced materials. Certification and visual inspection methods are significantly used for accepting standard manufactured materials. For accepting plant-produced materials, inspectors often use sampling and testing, certification, and visual inspection. The findings also indicated no direct relationships between project complexity and construction inspection methods. This study benefits both researchers and practitioners by examining the relationships between construction inspection methods, material production methods, and project complexity. The findings of this study uncover knowledge gaps in contemporary research related to construction material inspection and provide guidance for transportation agencies to develop inspection methods for their highway construction projects.
- 26 May 2022
- Published by Springer Nature
- p. 433-445
Preliminary Analysis of Emerging Visualization and Image Modeling Technologies for Highway Construction Inspection
- 26 May 2022
- Published by Springer Nature
- p. 433-445
Preliminary Analysis of Emerging Visualization and Image Modeling Technologies for Highway Construction Inspection
- 22 January 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676  (6) , 1-12
Approach to Determination of Risk-Based Inspection Workload for Highway Construction Projects
State departments of transportation (DOTs) are increasingly charged with developing and managing more highway construction projects while facing a substantial challenge in performing construction inspection activities with reduced resources of funding and inspection staff. Several state DOTs have applied workload reduction approaches including risk-based inspection methods to offset the shortage of inspection resources. The purpose of this study was to develop a framework to determine an appropriate inspection workload associated with construction inspection risk levels. The framework included three stages: (1) determination of project needs of inspection workforce, (2) utilizing risk-based prioritization of inspection activities, and (3) allocation of the workforce based on risk levels of inspection activities. The proposed framework was developed based on data collected from a comprehensive literature review and survey questionnaires of 50 state DOTs. The findings from this study indicated that almost all 38 responding state DOTs have a shortage of inspection staff. Four main strategies that state DOTs used to overcome the shortage of inspection workforce include outsourcing quality assurance (QA) inspections to consultants, using contractors’ test results for acceptance, reducing the number of inspections and testing frequency, and prioritizing QA inspections. The framework was tested and calibrated with a case study project in Kansas. The result shows that the proposed framework can be implemented by state DOTs to increase the value of inspection with a limited workforce. The framework also allows project managers to better understand and allocate the available inspection resources to alleviate the risk of quality shortfall.
- 22 January 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676  (6) , 1-12
Approach to Determination of Risk-Based Inspection Workload for Highway Construction Projects
State departments of transportation (DOTs) are increasingly charged with developing and managing more highway construction projects while facing a substantial challenge in performing construction inspection activities with reduced resources of funding and inspection staff. Several state DOTs have applied workload reduction approaches including risk-based inspection methods to offset the shortage of inspection resources. The purpose of this study was to develop a framework to determine an appropriate inspection workload associated with construction inspection risk levels. The framework included three stages: (1) determination of project needs of inspection workforce, (2) utilizing risk-based prioritization of inspection activities, and (3) allocation of the workforce based on risk levels of inspection activities. The proposed framework was developed based on data collected from a comprehensive literature review and survey questionnaires of 50 state DOTs. The findings from this study indicated that almost all 38 responding state DOTs have a shortage of inspection staff. Four main strategies that state DOTs used to overcome the shortage of inspection workforce include outsourcing quality assurance (QA) inspections to consultants, using contractors’ test results for acceptance, reducing the number of inspections and testing frequency, and prioritizing QA inspections. The framework was tested and calibrated with a case study project in Kansas. The result shows that the proposed framework can be implemented by state DOTs to increase the value of inspection with a limited workforce. The framework also allows project managers to better understand and allocate the available inspection resources to alleviate the risk of quality shortfall.
- 1 October 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 144  (10)
Best-Value Procurement in Design-Bid-Build Construction Projects: Empirical Analysis of Selection Outcomes
Best-value (BV) procurement is increasingly used in conventional design-bid-build (DBB) delivery, which raises questions regarding the influence of qualifications-based evaluation criteria when selecting construction contractors. The objectives of this study are to (1) examine BV procurement outcomes that can be expected from DBB projects, (2) determine which evaluation criteria have the greatest dispersion among competing contractors, and (3) identify whether a relationship exists between cost- and qualifications-based proposal submissions. A sample of 162 public institutional BV-procured DBB projects was collected that include evaluation results of 684 contractor proposals. Both descriptive and inferential statistics were used, including coefficient of variation and correlation analysis of evaluation criteria. The results show that BV-selected contractors offer substantial qualifications benefits in comparison with lowest- and average-bidder alternatives. Certain qualifications-based criteria, such as technical proposals, contractor interview scores, and safety proposals were found to have a greater dispersion among competing bidders than cost proposals. Contributions of this study to the body of knowledge include a sizable empirical data set of BV-procured DBB projects in the vertical sector and a unit of measure that considers dispersion among competing contractor proposals. In current construction industry practice, it is recommended that project owners consider BV for complex DBB projects and prioritize certain qualifications-based criteria that are well-suited for differentiating between competing contractor proposals.
- 1 October 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 144  (10)
Best-Value Procurement in Design-Bid-Build Construction Projects: Empirical Analysis of Selection Outcomes
Best-value (BV) procurement is increasingly used in conventional design-bid-build (DBB) delivery, which raises questions regarding the influence of qualifications-based evaluation criteria when selecting construction contractors. The objectives of this study are to (1) examine BV procurement outcomes that can be expected from DBB projects, (2) determine which evaluation criteria have the greatest dispersion among competing contractors, and (3) identify whether a relationship exists between cost- and qualifications-based proposal submissions. A sample of 162 public institutional BV-procured DBB projects was collected that include evaluation results of 684 contractor proposals. Both descriptive and inferential statistics were used, including coefficient of variation and correlation analysis of evaluation criteria. The results show that BV-selected contractors offer substantial qualifications benefits in comparison with lowest- and average-bidder alternatives. Certain qualifications-based criteria, such as technical proposals, contractor interview scores, and safety proposals were found to have a greater dispersion among competing bidders than cost proposals. Contributions of this study to the body of knowledge include a sizable empirical data set of BV-procured DBB projects in the vertical sector and a unit of measure that considers dispersion among competing contractor proposals. In current construction industry practice, it is recommended that project owners consider BV for complex DBB projects and prioritize certain qualifications-based criteria that are well-suited for differentiating between competing contractor proposals.