Kassa Mulatu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Kassa Mulatu has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Girum Getachew Demeke
Department of Natural Resources Management, Debre Tabor University, Debre Tabor, Ethiopia
1 shared publication - Guna Alankarage Hewa
School of Civil Engineering and Construction Management, Adelaide University, Mawson Lakes, Australia
1 shared publication - Imran Ahmad
Department of Water Resource and Irrigation Engineering, Woldia University, Woldia, Ethiopia
1 shared publication - Quoc Bao Pham
Department of Hydraulic and Ocean Engineering, National Cheng Kung University, Tainan, Taiwan
1 shared publication - Tesfa Gebrie Andualem
UniSA-STEM, University of South Australia, Mawson Lakes, Adelaide, Australia
1 shared publication - Tomohito J. Yamada
Faculty of Engineering, Hokkaido University
1 shared publication
Latest Publications
- 25 October 2021
- Published by Springer Nature in Sustainable Water Resources Management
- Vol. 7 (6) , 1-11
Grand Ethiopian Renaissance Dam and hydrologic hegemony over Abbay Basin
- 25 October 2021
- Published by Springer Nature in Sustainable Water Resources Management
- Vol. 7 (6) , 1-11
Grand Ethiopian Renaissance Dam and hydrologic hegemony over Abbay Basin
- Open Access
- 31 May 2017
- Published by Academic Journals in International Journal of Water Resources and Environmental Engineering
- Vol. 9 (5) , 96-101
Evaluation of water supply and demand: The case of Shambu town, Western Oromia, Ethiopia
Shambu town has faced a problem of potable water supply, still large number of people did not have access to adequate amount of potable water and frequent water interruption is a common problem. The objective of this research was to evaluate the existing water pressure map and water demand. To achieve this goal, the following input data were collected, base population, growth rate, and pressure map of the area, water production data, and reservoir data. The pipe network and junction network system was simulated to understand its behavior for different inputs using EPANET 2.0. The results showed that the water pressure were not feasible enough to provide adequate water. Replacing the appropriate diameters to the distribution as well expanding the distribution network in necessary engagements, the total water demand was projected to be 567648 m3/year or 18 L/s and the total water supply was estimated to be 252288 m3/year or 8 L/s. Only 44% of the population was covered by water supply .Thus, use of ground water, or boreholes with an estimated yield of 8 L/s are to be drilled. Key words: EPANET, water demand, water supply, distribution network.
- 31 May 2017
- Published by Academic Journals in International Journal of Water Resources and Environmental Engineering
- Vol. 9 (5) , 96-101
Open AccessEvaluation of water supply and demand: The case of Shambu town, Western Oromia, Ethiopia
Shambu town has faced a problem of potable water supply, still large number of people did not have access to adequate amount of potable water and frequent water interruption is a common problem. The objective of this research was to evaluate the existing water pressure map and water demand. To achieve this goal, the following input data were collected, base population, growth rate, and pressure map of the area, water production data, and reservoir data. The pipe network and junction network system was simulated to understand its behavior for different inputs using EPANET 2.0. The results showed that the water pressure were not feasible enough to provide adequate water. Replacing the appropriate diameters to the distribution as well expanding the distribution network in necessary engagements, the total water demand was projected to be 567648 m3/year or 18 L/s and the total water supply was estimated to be 252288 m3/year or 8 L/s. Only 44% of the population was covered by water supply .Thus, use of ground water, or boreholes with an estimated yield of 8 L/s are to be drilled. Key words: EPANET, water demand, water supply, distribution network.